Loading...
HomeMy WebLinkAboutEngineering ACCREDITED MIAM®UMTT _ CONSTRUCTION MATERIALS €� pBS TECHNOLOGIES c�, c 0 ACCN[01If0 NOW July 23, 2013 IKO Industries, Ltd 40 Hansen Road South Brampton, ON L6W 3H4 Canada Re: Shingle Installation Instructions for 2010 Florida Building Code Sir(s), PRI Construction Materials Technologies has completed a technical review and attached sealed shingle instructions in compliance the 2010 Florida Building Code. This review was completed based on the receipt of following evidence from IKO Industries, Ltd: 1) IKO Shingle Application Instructions—3-Tab Shingles (EN-3Tab_Appins_8AGXEFS-2012-11 reformatted 2013-02-rev07/13-Florida) 2) IKO Laminated Shingles Application Instructions . (EN-Laminated_Appins_8TTEFS-2012-04_reformatted 2013-02-rev07/13-Florida) 3) ASTM D3161 Test Report(FM Approvals Project No. 3040947) 4) ASTM D7158 Test Report(PRI Project No. IKO-091-02-01) The attached instructions should be used in conjunction with the published manufacturer's application instructions and applicable code. In the event the instructions conflict,these instructions shall govern. Regards, -Duc Nguyen 17vc -r.. d U Attachments: A) IKO Shingle Application Instructions-3-Tab IV B)IKO Laminated Shingles Application Instructions 1cJ ,,��n���r�►r�i .�`%'(i 'NH IKO-698-02.01 ? 4): No 65034ir •'2 '3�• STATE OF 10 PRI Construction Materials Technologies,LLC. 6412 Badger Drive Tampa,FL 3361D Td:813-621-5777 Fax:81U21-584g e-mail:matedalstesting@pricmtcom WebSite:http:/AmA w.pdcmtcom IKO Installation Instructions for 3-Tab and Laminated Shingles Page 2 of 3 IKO Shingle Application Instructions — 3-Tab Shingles (ASTM D3161, Class F—IKO Marathon 25 AR and CRC Superglass 25 AR) (ASTM D3161, Class F—IKO Marathon Ultra AR and CRC Superglass Ultra AR) (ASTM D7158, CLASS H -IKO Marathon 20 and CRC Superglass 20) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2010 FBC. UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed 6-1/8"above the butt edge,approx. 1"and 13"from each end and 1/2"above each cutout. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES: For steep slopes of 21"per foot(60°)or more,use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. STEEP SLOPES I� r 1~� ._ t larr parr ~yl 1 SEAUNG STRIP —— —— i tiara• Tn• NAILS NAILS DO NOT NAIL INTO OR ABOVE THE SEALING STRIP Hp,NH (� . �4aJG••��O E NSF•'•j�''� 6PV No 65034 � r- .- �:. STATE OF :�40Z P,� . N 0 r� PRI Constmc ion Materials Technologies,LLC. 6412 Badger Drive Tampa,FL 33610 Tel:813-6215777 Fax:813-621-5840 e-rnail:materialstesting@pricmtcom Website:hltp:llwww.pdcmtcom IKO Installation Instructions for 3-Tab and Laminated Shingles Page 3 of 3 IKO Laminated Shingles Application Instructions (ASTM D3161, Class F—IKO Cambridge AR and CRC Biltmore AR) (ASTM D3161, Class F—IKO Grandeur) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2010 FBC. UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed in the nail line 7-3/8" below the top edge, approx. 1"and 13"in from each end. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES: For steep slopes of 21"per foot(600)or more,use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. NAILING-STEEP SLOPES APPLICATION Use six nails as shown. ♦ NAIL LINE 6318"� ,. „;�s __:� �.'>s _;:.._:_� LQ 11 F] NAILS CEMENT PROPER APPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OFTHE SHINGLE %0111......... %o%% PSN H N cENSF•G��,� .•Z: No 65034 e C G53d3-4 STATE OF :•t[!� '�,C N 0 t �C • PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 3361D Tel:813-621-5777 Fax:613-621-5840 e-mail:materialstesting@pricmtcom WebSite:htlp:1&ww.pdcmtcom