HomeMy WebLinkAboutMisc Letters Fort Pierce Utilities Authority `: L
"Committed To Quality"
Key Accounts =
206 S.6th Street' `
- - Fort Pierce, FL 34984-3191 Phone(772)466-1600 Fax(772)467-3115
Job Location: 864 NOA ST Invoice Number: KA-28-15
___Account-Nainec JAN ETM MACKEY PCN: 340350202961102
Contact Name: JANET M MACKEY LocID: 10002158-242187
Billing-Address: 172 SAINT JOHNS PL APT 2 BROOKLYN NY 11217
Phone: (347)512-8996 Fax:( ) - Cell:( ) Cust Type Residential City Limits Outside
- -- -- �,•,F�s - s:IZe rr�� VM
' u"2° ,.:c�t�Ji��C41!��:3.. •4S( t�xrer~ �'..-„�`.st� �i_,.is:�rv�'`xC .w.^..r,��1U,sd2�.v�&vr�rr?2!'h ts^�u n�taak� +,..r.,�Jk.�iv 3� � ?�...,. �a.,L�' ��� .�r�. �'v:t#c”
a "
1 3/4" Water Meter and/or Service Installation $250.00
Water Security Deposit $60.00
- ' - Water New Account Setup Charge $40.00
Water Capital Improvement Charge W ERC's 0.00 $0.00
Wastewater Security Deposit $0.00
Wastewater New Account Setup Charge $0.00
Wastewater Capital Improvement Charge WW ERC's 0.00 $0.00
Lien Fees 0.00
�„ e,f aim- „"„^_. ..tai. •-_�,.`<Sr,. � ,>3...,4:.. .�'k. .,,.5'�`a - -..:,=2�,x,_..4 ,�-s..a..,,��.
0.00
0.00
Down Payment: $0.00
Invoice Total: $350.00'
Description for service order: INSTALL 3/4"WATER METER-NO SEWER
NOA ST MSBU
Total Paid: Date Paid: Check Number:
Customers will be assessed wastewater charge's the day they connect to the wastewater system or within 365 days from date wastewater Connection
Charge is paid-whichever is first.The cost of*the service line from the point of delivery at the property line to the house/building is the responsibility of the
customer and is not included in this invoice. State laws require that a permit from the Health Department must be obtained prior to initiating a septic tank
abandonment.Contact the Health Department at(772)873-4931.
Construction cost estimates are based on current labor,equipment and material prices. Actual costs of construction will be determined at the completion of
the project. Should unforeseen circumstances be encountered during construction,including but not limited to adverse weather conditions and
construction conflicts,the customer will be responsible for increased costs. Additional costs incurred by the customer shall not exceed fifteen(15)
percent of the total estimated construction costs shown above. Estimated costs paid by the customer that exceed the actual cost of construction will be
refunded by Fort Pierce Utilities Authority.
Reviewed By: Kurtis Strand Key Accounts S e ' list Date: 03/09/2015
Customer's Signature: Date: G�
Printed Name: