Loading...
HomeMy WebLinkAboutProject Information RIGHT-OF-WAY PERMIT APPLICATION:FORM ,1�Oti STXUCIE COUNTY ENGINEERING DIVISION 2300 VIRGINA AVENUE.2'FLOUR.FT.PIERCE,FL 34982(7721462-1707 of Applicant. Comcast Phone No.561-662-8792 Mailing address 10435 Ironwood Rd,Rah Beach Gardens,FL 33410 SS• 'TYPE OF PROII GT.CCJ CK.QNE)p4RF,SIDFN,TIAL.RaCOMMERCIALOaUTILITYOoDEVELOPMELVTA.RDER Name of OWNER responsible for utility after installation_COMCaSt Phone No 561-662-8792. Ultimate OWNER does not take possession until acceptance of work. Fcrrntttcc rgprescntatiyc responsiblc..6r notifying St.L.ucic'County 48hoursprior too wonting in County Right-of- WayGary I Grd Ene EC13001574 We shall commence construction of the permitted installation�days.of permit issuance and complete same Within____days thereof, Contractor's Name Gary J Gifford Inc Phone No(REQUI zED)772-286-0954 Mailing-Address 350 SW Lffid-.n St Stuart,FL 34997 E-Mail Address n- pint tnmegst net As the Applicant,-we request pemusscon to construct road drainage, or combination drainagetutility, in Right-of-Way.or easements deeded to or maintained by St.Lucie County,or dedicated'to the public areas of St.`I,uc'ie County,(hereinafter refbrred. to as "County ltightnf-Way's: Typc of work that is being performed-in County ,.Right-of Way, and_name:of County Road: SOUth.0 10 :IS �" P C0� (� e G i✓f PASS IS l0 ViSla I jr° The following:MUST be submitted within original signed.copy-of tbis applicitiou.(3 COPIES OF EACH). 1)petalled maintenance of traffic plan from YDOT's"Design:Standards 600.Series". df traffic control requires detours,-at d/or toad closures,aFlorida Registered Professional Engineer wfllbe required to design,sign,and seal said plans. 2)Show on an,attached set of plans(11"x1T'or if requested-24"A 36")the location and character of the work,.and-detail the aspect of the.work that will.disturb:Comity maintained improvements{hereinafter referred to as"IMPR0VE5IENTS"). WI-Ind-al v te upon reagesto eti displayed, Applicant Title -ReaSr Enc Technician /` fly: 0, i Date Ji�t2S �®9�5. .By proceeding with ins' 'ori of work covered by thus.permit, I agree to comply with.the" E RAL AND-SPECIAL CONDITIONS OF RIGHT-OF-WAY PERMIT". _OFFICE USE ONLY RIM-OF-WAY D SCRIPTION '� �; 121 Re y 9, X `A• UIS -DIVISION DATE s Reviewed.By -JUL ROAD BRIDGE DATE The aforestated installatioti is.hetebypermitted under the fo owing pro BOARD OF COUNTY COMMISIONERS,ST.LUCIE COUNTY,FL O A ByCounty E ' -enforcing official �G'g}�� � �] t V ( Q R/W PERMI`t' DA Ell sy q qq Revised July 2.011 ( �f/�Page 1 of 3 LI _5�l {a V .D. ENGINEER* a - o 12015 '.lt. • G y APPi,ENDU RI GENERAL CONDITIONS OF RIGHT OF-WAY PERMIT The applicant declares that prior to filing this application,he/she has(1)ascertained the location of existing utilities that would be affected by the proposed installation,and(2)notified such affected utility owners in writing regarding same, and(3)correlated the proposed installation with owners of such utilities and determined that the proposed installation can be made without detriment to such existing utilities.If granted a permit for construction of proposed installation on County rights-of-way,the applicant agrees to the following: i. Safety;All construction work shall comply with the safety provisions of all federal,state and local laws. 2. Traffic Control:Measures shall be provided during construction in accordance with the FDOT Design Standards 600 Series. Trak shall be maintained to the degree required by the County Engineer. I To-Save Ham, 6-sa.the Beard of County Commissioners and each-and every member,thereof from the payment of any compensation or damages resulting from the exercise of rights and privileges herein granted. 4. In the event that modification or repair of the improvements on aforestated County right-of-way becomes necessary, to promptly movefremove the installation permitted herein,as requested by the Board of County Commissioners of St.Lucie, County,Florida,at no cost to the County. 5, R ,AofInstallatiIn-the-case-of noncompliance-with,the-requirements-stated-herein,the installation permitted•herein will be promptly brought into compliance.or removed from County right-of-way by applicant at no cost to the County. 6. Repair of Improvements by Permittee• Applicant agrees to promptly repair any damage/injury to improvements on County right-of-way caused by reason of the exercise of rights and privileges herein granted,restoring same to a condition equal to that which existed immediately prior to the infliction of such damage or injury in a manner satisfactory to the County. 7. Perri#I.i Fe: If this perrni#is grananted;it shall.be valid-'for-a•peried•of 180•calendar-days from•date of approval-subject to• termination by the County in the event that -improvements on aforestated County right-of-way are to be constructed/reconstructed,or in the event that such right-of-way shall be closed,abandoned,vacated or discontinued. 8. The attached sketch(s)covering details of the permitted installation shall be made a part of this permit.Deviations from the approved work or maintenance of traffic plan shall require prior approval of the County Engineer. 9.. NrififtcgLmt County Engwgec:.The.County Engineer-'s.o shall,be-notified-twenty-four,(24.}-hours�in,advance of starting work on County rights-of-way.New construction that is discovered to have begun without notification will be subject to a stop work,order until proper permits have been acquired.Unless the work activity is accomplished in continuous work days (excluding weekends and holidays),re-notification shall be required upon any lapses. 10. Permit on Job Site-All projects requiring a County Right-Of-Way or Driveway Permit will be required to have a copy of the permit on the job site and be able to produce said copy when requested. Failure-to do so will be considered as operating without avalid•pern it.and-oper-ationsshall cease and desist. As-imthe-past;field-work that:is classified-as maintenance-will- not be subject to the above.The exception on maintenance would be in the event excavation adjacent to a roadway is to be left open overnight,We would want notification for the purpose of inspecting for adequate barricades,lights,etc. 11. Rights of a Prior Pemuttee:The construction and maintenance of aforestated installation shall not interfere with the property and rights of a prior permittee. 1.2. Final-kWge ion The County-Engineer's of-flee shall be notified•by the applicant upon-completion•of the-instaliation- permitted herein,so that a final inspection may be made. 13. Other Entities:This permit in noway waives the authority and/or jurisdiction of any other governmental entity. Applicant is solely responsible for ensuring that all other stakeholders affected by the work or that have ownership of the work site,or .portions thereof have been adequately notified and have given permission to perform work. Revised July.2011 Page 2 of 3 SPECIAL CONDITIONS OF RYOHT OF iWAY PEP TT 1. Applicant agrees that in case of future damage(test of time)to the right-of--way or pavement due to subject installation,the applicant shall repair and restore same to condition acceptable to the County Engineer. 2. Applicant agrees that the expense for any modifications to subject utility installation required before, during or after any future right-of-way,drainage or roadway improvements are implemented shall be borne solely by the applicant,including but -not-limited-to:removal,-relocation,-manhole-adjustments,-etc. 3. All work done within right-of-way shall be done Monday through Friday, 8:00 AM-5:00 PK excluding County,observed holidays and County closures,unless otherwise approved by the County Engineer. Any work Performed after hours shall be supervised by a County inspector,for which the Contractor shall reimburse the County at the current-Insnector rate, 4. Any-read-closures•shall-be-requested-in-writing,-along-with an-accompanying-traffic detour-plan-for-review,-to the County. Engineer fourteen(14)days prior to requested closure. The County Engineer reserves the right to modify the maintenance of, traffic(MOT)as needed based upon performance. 5. Any approved open pavement cut or trench cut in proposed limits of future pavement shall be restored to FDOT and St Lucie County standards. 6. No,excavation-shall.uk.eplace-within-a-minimum-of4tve-(5)•€eetofthe-edgeO-Pavem6nt-or-.withinthe-ClearRecoveryZone . (CRZ).This distance maybe increased by County Engineer dependent upon posted speed limit of roadway. 7. Minimum cover of36"under the travelway and 30"elsewhere,including swales/ditches,shall;be maintained over the utility. Conflicting utilities shall maintain 18"separation unless specifically approved by County Engineer: 8. Jack &Bore or Directional Bore installations shall be done per FDOT specifications. Casings under the travelway.shall extend a minimum of eight•(8)-feet-beyond the edge of-the travelway.Bentonite or drilling-fluid shall-be removed from project site same days as drilling operations. 9. Driveways,roadways,trenches and/or sidewalks shall be restored per the detail approved on the plans or specified in this permit.Proof of compaction shall be copied to the County Engineer. 10. Two (2)sets of certified record drawings shall be submitted to this.office immediately upon completion of subject utility installation. 11. Dependent upon the type of project,additional permit(s)and/or agreement(s)may be required prior to approval of the right- of-way permit. Revised July 2011 Page 3 of 3