PROPOSAL
Date: July 30,2015
Submitted to: Mr.Ronald Dawson Job Name: The Dawson Residence
201 Julian Drive
Fort Pierce,FL 3332
954-815-1447
rd nalddawson(tt mail.cotti
We are pleased to submit the following proposal for your consideration on the above referenced premises as follows.
We agree to provide all labor, material, tools,equipment, and the nrojler insio-ante in excess of jbw-million dollars.
WORK SCOPE: Rear Flat Roof Area
I. Remove existing roof to the plywood deck. Discard all debris legally off site.
2. Re-nail the existing plywood to code.
3. Furnish and install Polyglass Two Ply self-adhered membrane system to the plywood deck. The base ply will be
Llastoflex SAV and the cap ply will be l.lastoflex SAP.
4. Furnish and install 26 gauge galvalume cave metal.
5. 1 ti>rti_slJ,l,ht JtUof Autlit?rity!_ivc Y:et r We ath�rtit;I�tness:Warr":
QUOTATION for the sum of:Ten Thousand Three Hundred Dollars($10,300.00)—Herein referred to as the base bid.
OPTION 0: To furnish and install Owens Corning 30-Year Oakridge Dimensional shingle roof system with Tri-Built Self
Adhering Underlayment, including all standard accessories and trim, to code. Color choices from the manufacturer's
standard colors.ADD:$1,4100.00.
We encourage,you to.explore the differences between the proposals you receive asci cordially invite yon to review your Project and
proposal kt'ith-its.1Ye-wVoolll appreciate the opportunity to meet with you,either at your location,or at otir facility.
Page 2 o1*2
EXCLUSIONS
TRA specifically excludes the following and notifies the owner that these items must be addressed by others and will be at
owner's expense:
* Gutters&Downspouts
* Concrete, lightweight,steel,wood,or any other form of deck replacement,other than that specifically noted herein.
* Provisions regarding wind mitigation requirements, if required.
* Mechanical/Electrical/Plumbing&AC Stands
UNIT PRICES
• Replacement of plywood decking(if needed)-$2.50 per square foot(Minimum V-2 sheet per location)
• Additional work (if needed), beyond the scope of our contract will be charged at material cost plus 25% and labor rate of
$75.00 per man-hour.
The work will be accomplished and guaranteed in a-ccordance with IRA's Standard General Conditions and Limited Warranty,
which are made a part of this Proposal and Agreement, and incorporated herein by reference. YOUR SIGNATURE BELOW
ACKNOWLEDGES RECEIPT AND APPROVAL OF THESE DOCUMENTS.
All labor and material necessary to perform the above work will be furnished for the sum of Ten Thousand Three Hundred
Dollars (5I0,300.00) (IF TAX EXEMPT, CERTIFICATE REQUIRED UPON EXECUTION OF THIS PROPOSAL AND
AGREEMENT), payable at IRA's office in Fort Pierce, Florida, in full, upon completion of the work. If the entire job is not
completed within any calendar month, progress payment for all labor and/or materials on the job by the last day of each month are
due no later that the tenth(10")day of the succeeding month until the time final payment, upon completion, is due.
Twenty Five (25) Percent of the contract amount due upon acceptance of the owner. Additional 50 percent due upon
roof removal and dry in. Balance due upon completion.
This is a couffileltifid agreement. I'leuse do not tlttpjicale or share information contained herein.
Prior to initiation of any action,the parties agree to participate, in good I'aith, in a minimum half-day mediation with a mediator
either chosen by agreement between the parties or as assigned by the American Arbitration Association. In the event the dispute
is not resolved by mediation, any claim or controversy arising out of or relating to this Agreement or breach thereof,or to any
action by an employee or agent Of TRA, shall be settled by arbitration in accordance with the Federal Arbitration Act and
Construction Industry Arbitration Rules of the American Arbitration Association. However, the arbitrator shall be required to
issue written findings or fact and conclusions of law. Moreover,the parties shall split the cost of keeping a written record of all
proceedings. The judgment of the Arbitrator may be entered in any court having jurisdiction thereof and shall be final and
binding on both parties,except for errors or law, which shall be appealable. The parties agree that all expenses of arbitration or
mediation will be shared equally or as awarded by the arbitrator. The successful party shall also be entitled to attorney fees and
all costs of litigation.
Due to the extreme price volatility regarding petroleum products, the price quoted in this proposal is valid only for
orders placed and paid within the next 30 days. If there is an increase in the price paid by The Roof Authority,Inc. for
asphalt, polyisocyanurate, steel or other materials, including transportation charges, the amount of this
proposal/contract shall be similarly increased to reflect the increased costs to obtain the materials.
BUYER I11-RUBY APPROVES AND ACCEM'ST1118 PROPOSAL AND THE ROOF AUTHORITY, INC.
AGRL-I'MENT. TOGETHER WITH TRA'S STANDARD GENERAL
CONDITIONS AND LIMITED WARRANTY
NAME: BY:
Christopher A. Long,President
DA'I'S: Florida License CC 00569313