Loading...
HomeMy WebLinkAboutEngineering 6L—B 2267 Woods Edge Cir. Orlando,FL 32817 772-708-7785 &772-828-2263 Engineering Consultants, Inc. RECEIVED AUG 28 2015 August 25, 2015 File"copy- STRUCTURAL copySTRUCTURAL INSPECTION CERTIFICATION (wrrH snWCMRAL CMM TION) Project: Re-Roof Installation for Iden Perkins Residence at: 14899 Aguila Ave. Ft. Pierce 171.34951 Permit for a new"Extreme Metal" 5v Crip Metal Re- Roof Cover Prepared for: St. Lucie County Building Department Client: Onshore Roofing Specialist Inc. 4401 SE Commerce Ave. Stuart Fl. 34990 Background. On August 20, 2015 B & B Engineering, Inc. was requested by Onshore Roofing Specialist Inc. a Florida License Roofing Contractor to visited the above site to visually inspect the structure as to its ability to support the proposed new"Extreme Metal" 5v Crimp Metal Roof Cover installation for the above residence. Certification: B & B Engineering, Inc. Certify that existing roof support structure is in good shape and capable of support the new roof cover, Also to meet the required wind loading as per ASCE 7-10, Exposure C with 165 mph, the existing plywood deck will be re-nailed to the existing roof structure support using galvanized steel 8d ring shank nails at 4" on center edge and 6" center field. The new synthetic Palisades/SDP (FL. 5325-r6) synthetic underlayment Evaluation Report S 19010 07 09 —Rl FL 5325-R5 will be mechanical attached with galvanize plastic cap as per manufactures recommendations, and the 5V 26Ga. Metal Roof System FL Approval No.17022-1 as per manufactures recommendations, and 2014 FL Building Code. To the best of our knowledge and professional ability it is B & B Engineering Inc. opinion that the work will be properly done and the new roof cover will be structural sound, safe and in compliance with Codes and Manufactures specifications. Limitations. Our professional services have been performed, our finding obtained and our opinions prepared in accordance with general accepted structural engineering principles and practices. This Company is not responsible for the conclusions, opinions or recommendations made by others based on our findings.,The certification submitted in this report is based upon the field inspection on August 22, 2015 and was interid6d;to-.evaluate_the existing roof structure to assure the integrity of the proposed new roof cover. 'A,w Approved;.. ` . _ 4 -, O Be ez, FL License# 55141