Loading...
HomeMy WebLinkAboutProduct Approval 57/8/2015' Florida Building Code Online SEE Florida Deparnentf BCIS Home I Log In User Registration Hot Topics Submit Surcharge Stats&Facts Publications FBC Staff 1 SCIS Site Map Links I rSearch Bu s i nes(p�1r�(,'!�[�_1�jJ11 &, ProfessiVl IUI IUI , Ct USER:Publiicc Public i Regulation Product Approval Menu>Product or Application Search>Apolication Lis[>Application Detail FL# FL7006-R9 Application Type Revision Code Version 2014 Application Status Approved *Approved by DBPR. Approvals by DBPR shall be reviewed and ratified by the POC and/or the Commission if necessary. Comments Archived _.. Product Manufacturer IKO Industries, Ltd Address/Phone/Email 40 Hansen Road South Brampton, NON-US L6W 31­14 (708)496-2800 Ext 200 rmetzOO1@tampabay.rr.com Authorized Signature Robert Metz rmetzOO1@tampabay.rr.com Technical Representative Bob Metz Address/Phone/Email REMCO of Pinellas 456 Avila Circle NE Saint Petersburg, FL 33703 (727) 776-5261 rmetz001@tampabay.rr.com Quality Assurance Representative Don Shaw Address/Phone/Email IKO Industries LTD 120 Hay Rd. Wilmington, DE 19808 (717) 579-6706 don.shaw@iko.com Category Roofing Subcategory Asphalt Shingles Compliance Method Certification Mark or Listing Certification Agency FM Approvals-CER Validated By Locke Bowden Validation Checklist-Hardcopy Received Referenced Standard and Year(of Standard) Standard Year ASTM D3161 modified to 110 mph 2009 ASTM D3462 2009 ASTM D7158 Class H 2008 ASTM E108 2007 Equivalence of Product Standards Certified By https:/ifloridabuilding.org/pr/pr_app dtl.aspx?param=wGEVXQwtDgse7mYBd2b3K6mXtOZLhNVX122Npl7OJlE%3d 1/3 7/8/2015 Florida Building Code Online i Product Approval Method Method 1 Option A Date Submitted 06/28/2015 Date Validated 06/30/2015 Date Pending FBC Approval Date Approved 07/06/2015 Summary of Products FL# Model,Number or Name Description 7006.1 Cambridge,Cambridge HD and CRC Laminated architectural fiberglass asphalt shingle Biltmore AR manufactured at IKO's Kankakee, IL; Hawkesbury,Ont.; Wilmington, DE; Sylacauga,AL and Toronto, Ont. plants Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15- Approved for use outside HVHZ:Yes 2015 .odf Impact Resistant: N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter-5 6 Design Pressure: N/A 15.odf Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3 15 .odf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 R9 II IKO-133-02-01 Letter-Installation Instructions for FBC FL7006.odf Verified By: Duc T Nguyen 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006.2 Hip and Ridge 12 Cap fiberglass This is a 12"x 12"fiberglass asphalt shingle used to cover shingles the hip and/or ridge of an asphalt shingle roof system manufactured in Toronto, Ont. and Brampton, Ontario Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15- Approved for use outside HVHZ:Yes 2015 .odf Impact Resistant: N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter-5 6 Design Pressure: N/A 15.r)df Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3 15 .odf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 R9 II Hio and Ridoe Cao Shinole Installation Instructions.odf FL7006 R9 II IKO-133-02-01 Letter-Installation Instructions for FBC FL7006.odf Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006.3 Leading Edge Plus Asphalt Shingle One piece fiberglass asphalt shingle used as a starter strip at Starter Strip the bottom of a roof system manufactured in Brampton and Hawkesbury, Ontario plants Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15- Approved for use outside HVHZ:Yes 2015 .odf Impact Resistant: N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter- 5 6 Design Pressure: N/A 15.odf Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3 15 .odf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 R9 II IKO-133-02-01 Letter-Installation Instructions for FBC FL7006.odf FL7006 R9 II Roof ino-Products-Leadino-Edoe-Plus- AmAication-EN(1).odf Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: https://floridabuildi ng.org/pr/pr_app_dU.aspx?param=wGEVXQwtDgse7mYBd2b3K6mXtoZLhNVXI22N pl7OJ1 E%3d 2/3 7/8/2015 Florida Building Code Online 7006.4 Marathon 25 AR,CRC Superglass 3 tab fiberglass asphalt shingle manufactured at IKO's M25AR Brampton, Ontario, Hawkesbury Ont.,Toronto,Ont.; Sylacauga,AL and Kanakakee, IL plants Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15- Approved for use outside HVHZ:Yes 2015 .Odf Impact Resistant: N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter-5 6 Design Pressure: N/A 15.Odf Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3 15 .Ddf Quality Assurance Contract Expiration Date 12/20/2020 Installation Instructions FL7006 R9 II IKO-133-02-01 Letter- Installation Instructions for FBC FL7006.odf Verified By: Duc T Nguyen 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: Back Next Contact Us:: 1940 North Monroe Street,Tallahassee FL 32399 Phone: 850-487-1824 The State of Florida is an AA/EEO employer.Copyright 2007-2013 State of Florida.:: Privacy Statement::Accessibility Statement::Refund Statement Under Florida law,email addresses are public records.If you do not want your a-mall address released in response to a public-records request,do not send electronic mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.*Pursuant to Section 455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address If they have one.The emails provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S.,please dick here. Product Approval Accepts: ® eCtc=l: sect nt aicraicS. https://floridabuilding.org/pr/pr app OU.aspx?param=wGEVXQwtDgse7mYBd2b3K6mXtoZLhNVX122Npl7OJlEg/o3d 313 CONSTRUCTION MATERIALS TECHNOLOGIES March 30, 2015 IKO Industries, Ltd 120 Hay Rd. Wilmington, DE 19809 Re: FBC FL7006 Sir(s), PRI Construction Materials Technologies has completed a technical review and attached sealed shingle instructions in compliance the 2014 Florida Building Code. This review was completed based on the receipt of following evidence from IKO Industries, Ltd: 1) IKO Shingle Application Instructions—3-Tab Shingles (EN-3Tab_Appins_8AGXEFS-2012-11_reformatted 2013-02-rev07/13-Florida) 2) IKO Laminated Shingles Application Instructions (EN-Laminated_Appins_8TTEFS-2012-04_reformatted 2013-02-rev07/13-Florida) 3) IKO Hip and Ridge 12 Application Instructions (EN-HipandRidge12_3HRTri-2013-08_reformatted 2013-08) 4) IKO Leading Edge Plus Shingle Application Instructions (EN-3LEP-Tri-2012-06_reformatted 2013-03) 5) ASTM D3161 Test Report(FM Approvals Project No. 3040947) The attached instructions should be used in conjunction with the published manufacturer's application instructions and applicable code. In the event the instructions conflict, these instructions shall govern. Statement of Independence:PRI Construction Materials Technologies and/or Duc T. Nguyen,FL P.E.do not have nor plan to acquire a financial interest in any company manufacturing or distributing products for which the test reports are issued. i Signed: f Signed: Brad Grzybo ski Duc T.N u en Managing Director Florida RbVsTered Professional Engine r P.E.Number:65034 Date: April 30, 2015 Date: April 30, 2015 Attachments: A) IKO Shingle Application Instructions-3-Tab B) IKO Laminated Shingles Application Instructions C) IKO Hip and Ridge 12 Application Instructions D) IKO Leading Edge Plus Application Instructions IKO-133-02-01 PRI Construction Materials Technologles,LLC. 6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:81&621-5840 e-mail:matedalstesting@p6cmt.com WebSlte:http:/Mnvw.p6cmt.com IKO Installation Instructions for Asphalt Shingles Page 2 of 5 IKO Shingle Application Instructions — 3-Tab Shingles (ASTM D3161, Class F—IKO Marathon 25 AR and CRC Superglass M25AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC. UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING:Use galvanized (zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed 6-1/8"above the butt edge, approx. 1"and 13"from each end and 1/2"above each cutout. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(60°)or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8". STEEP SLOPES 1" +� SEALING STRIP TIB- 112- I I 61118" I- NAILS NAILS DO NOT NAIL INTO OR ABOVE THE SEALING STRIP PRI Construction Matedals Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:matedaistesting@pdcmtcom WebSite:http:Nwww.pdcmt.com IKO Installation Instructions for Asphalt Shingles Page 3 of 5 IKO Laminated Shingles Application Instructions (ASTM D3161, Class F—Cambridge, Cambridge HD, and CRC Biltmore AR) NOTE: THESE INSTRUCTIONS SHALL BE. USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC. UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed in the nail line 7-3/8" below the top edge, approx. 1"and 13"in from each end. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES: For steep slopes of 21"per foot(600)or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8". NAILING-STEEP SLOPES APPLICATION Use'iN nails a&shown. 7 318" —i � 1„ .�,. � , -► Wit.. �„ � � y., � �. �— NAIL LINE NAILS CEMENT PROPER APPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OFTHE SHINGLE PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:matedalstesting@pricmtcom WebSite:http:/ANww.pdcmt.com 1 ' IKO Installation Instructions for Asphalt Shingles Page 4 of 5 IKO Hip and Ridge 12 Application Instructions (ASTM D3161, Class F— IKO Hip and Ridge 12) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are designed for a 5 1/8"(130 mm)exposure. (For a neater appearance,the top of each side of each piece has been factory trimmed on a 1"(25 mm)taper(see drawing). Bend each piece over the hip or ridge, and nail 5 5/8" (143 mm) above the butt edge 1" (25 mm) in from each edge, exposing each piece 5 1/8" (130 mm). Apply hip pieces starting at the lower end of the hip,working up toward the ridge. On hip roofs, apply ridge pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end opposite to the prevailing wind direction and continue to the other end. Note:To obtain a three-dimensional effect, (which is recommended, but not required),apply hip and ridge shingles double thickness by stacking 2 pieces on top of one another, the lower piece extending about 3/4"(19 mm)further than the top piece (see diagram).The final shingle should be set in cement,and the exposed nail heads of the final shingle should be covered with cement. Prior to application in cold weather, storing the shingles in a heated area will allow for easier bending. NOTE:SHINGLES MUST BE APPLIED PROPERLY.THEYARE DESIGNED FOR USE AS HIP AND RIDGE SHINGLES ONLY, AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS. WE ASSUME NO RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POOR APPLICATION OR FAILURE TO PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS.REVIEW ALL APPLICABLE BUILDING CODES,MINIMUM PROPERTY STANDARDS,AND REQUIREMENTS PRIOR TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS. 3f4' 11. Up , TAPER CUT 5lAr \ \ 6 30? (1 62 .nj PRI Construction Materials Technologies,LLC. 6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 a-mail:matedalstesting@pdcmtcom WebSite:http:/Mnxv.pricmt.com A ' � IKO Installation Instructions for Asphalt Shingles Page 5 of 5 IKO Leading Edge Plus Application Instructions (ASTM D3161, Class F—IKO Leading Edge Plus) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. 1. Apply any underlayment, eave protection, valley flashings, or drip edges to roof deck as required. 2. Each 39 3/8"x 13 1/4"(1000 mm x 336 mm)IKO Leading Edge Plus strip is perforated lengthwise for separation into two(2)shingles.Take one IKO Leading Edge Plus strip and fold flat at perforation to separate. 3. Take one of the separated shingles 39 3/8"x 6 5/8"(1000 mm x 168 mm)and remove approximately 20"(500 mm). Install this shingle on the lower left corner of the roof deck, granule side up,with the factory installed sealant adjacent to the eaves.The shingle should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum. Fasten the shingle to the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge and 1" (25 mm) in from each end. 4. Take the leftover 20"(500 mm)piece shingle. Rotate the piece and align it vertically up the rake edge with the factory installed sealant adjacent to the outer edge of the roof.The shingle should overhang the rake edge by a nominal 1/4"(6 mm)minimum. Fasten the shingle to the roof deck with fasteners located 3"to 4" (75 mm to 100 mm)from the rake edge and 1"(25 mm) in from each end. 5. Repeat Steps 3—4 for the right lower corner of the roof deck. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge,with at least 3/8"(9 mm)diameter heads, long enough to penetrate through plywood or 3/4"(20 mm) into boards. Use 4 nails per shingle placed 3"to 4"(75 mm to 100 mm)from the eave edge and approximately 1"and 13"(25 mm and 330 mm)in from each end. 6. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck.Install the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum.Fasten the shingles to the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge,4 nails per shingle. 7. Apply roof shingles as per the instructions printed on each product's package. Make certain the first course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus. In this way, the sealant on the IKO Leading Edge Plus shingles will adhere to the first-course field shingles and help keep them from lifting in high winds. PRI Construc8on Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:mate6alstesting@pdcmt.com WebSite:http:/Ayww.pdcmt.com 6/30/1015 Florida Building Code Online tit A Florida Department4 SCIS Home Log In User Registration Hot Topics Submit Surcharge Stats&Facts Publications ; FBC Staff SCIS Site Map Links Search Busines(�JLC/�/' ProfessiVl lal *qg-' s USER Public Regulation Product Approval Menu>Product or Aoolication Search>Aoolication List>Application Detail •••• FL# FL2569-R9 Application Type Revision Code Version 2014 Application Status Approved Comments Archived Product Manufacturer Soprema, Inc. (Canada) Address/Phone/Email 1640 rue Haggarty Drummondville, NON-US 00000 (819)478-2400 Ext 3327 memathieu@soprema.ca Authorized Signature Marc-Etienne Mathieu memathieu@soprema.ca Technical Representative Marc-Etienne Mathieu Address/Phone/Email 1688 Jean-Berchmans-Michaud Drummondville, NON-US 00000 (819)478-2400 Ext 3327 memathieu@soprema.ca Quality Assurance Representative Jean-Francois Cote, Ph.D. Address/Phone/Email 1640 rue Haggarty Drummondville (888) 811-3145 jfcote@soprema.ca Category Roofing Subcategory Underlayments Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer i Evaluation Report- Hardcopy Received Florida Engineer or Architect Name who developed Robert J. M. Nieminen the Evaluation Report Florida License PE-59166 Quality Assurance Entity UL LLC Quality Assurance Contract Expiration Date 10/16/2017 Validated By John W. Knezevich, PE L' Validation Checklist-Hardcopy Received Certificate of Independence FL2569 R9 COI 2015 01 COI Nieminen odf Referenced Standard and Year(of Standard) Standard Year ASTM D1970 2009 ASTM D6163 2000 ASTM D6164 2005 FM 4474 2004 FRSA/TRI April 2012(04-12) 2012 TAS 103 1995 https://fioridabuilding.org/pr/pr_app df.aspx?param=wGEVXQwtDgsKQFEnckBI08ErxlUd3xYIX2°/*2f%2bLT9pl88`/o3d 1/2 6/30/2015 Florida Building Code Online TAS 110 2000 Equivalence of Product Standards Certified By Sections from the Code Product Approval Method Method 1 Option D Date Submitted 04/17/2015 Date Validated 04/21/2015 Date Pending FBC Approval 04/25/2015 Date Approved 06/23/2015 Date Revised 06/29/2015 SummarV of Products FL# Model,Number or Name Description 2569.1 Soprema Roof Self adhering roof underlayments Underlayments Limits of Use Installation Instructions Approved for use in HVHZ: No FL2569 R9 II 2015 04 FINAL ER SOPREMA CA UNDERLAYMENTS FL2569- Approved for use outside HVHZ:Yes R9.Ddf Impact Resistant: N/A Verified By: Robert Nieminen, P.E. PE-59166 Design Pressure: +N/A/-90 Created by Independent Third Party: Yes Other: 1.) Refer to ER Section 5 for Limits of Evaluation Reports Use. 2.)The design pressure noted herein FL2569 R9 AE 2015 04 FINAL ER SOPREMA CA UNDERLAYMENTS FL2569- pertains to underlayment systems used R9.Ddf beneath adhesive-set tile systems. Refer to Created by Independent Third Party: Yes ER Section 5.6.4 for details. Back Next Contact Us:: 1940 North Monroe Street,Tallahassee FL 32399 Phone:850-487-1824 The State of Florida Is an AA/EEO employer.Coovriaht 2007-2013 State of Florida.::Privacy Statement::Accessibility Statement::Refund Statement Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.'Pursuant to Section 455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address If they have one.The emails provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S.,please click here. Product Approval Accepts: W® Aec sccUriRIC https://floridabuilding.org/pr/pr app dfl.aspx?param=wGEVXQwtDgsKQFEnckBl08ErxlUd3xYIX2%2f%2bLT9pl88°/a3d 2/2 EXTERIOR RESEARCH&DESIGN, LLC. Certificate of Authorization#9503 �TRINITYI 353 CHRISTIAN STREET,UNIT#13 ERD OXFORD,CT 06478 PHONE:(203)262-9245 FAX:(203)262-9243 EVALUATION REPORT Soprema,Inc. Evaluation Report 518010.06.09-117 1640 rue Haggerty FL2569-R9 Drummondville,Quebec J2C 5P8 Date of Issuance:06/15/2009 Canada Revision 7:04/17/2015 SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The products described herein have been evaluated for compliance with the 5th Edition (2014) Florida Building Code sections noted herein. DESCRIPTION: Soprema Roof Underlayments LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. Trinity)ERD requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words "TrinitylERD Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety. INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 6. Prepared by: tpnt[fr[nn, Robert J.M.Nieminen,P.E. The facsimile seal appearing was authorized by Robert Nieminen, ^R�„��� ;• P.E.on 04/17/2015.This does not serve as an electronically signed Florida Registration No.59166 Florida DCAANE1983 ��'�S� �� , ��JJ,��al'i[s document.Signed,sealed hardcapies have been transmitted to the Product Approval Administrator and to the named client CERTIFICATION OF INDEPENDENCE: 1. Trinity]ERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or distributing products it evaluates. 2. Trinity]ERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen, P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither Trinity I ERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained specifically for that purpose. i (_)0 TRINW(ERD ROOFING COMPONENT EVALUATION: 1. SCOPE: ' Product Category: Roofing Sub-Category: Underlayment Compliance Statement: Roof Underlayments, as produced by Soprema, have demonstrated compliance with the following sections of the Florida Building Code through testing in accordance with the following Standards. Compliance is subject to the Installation Requirements and Limitations/Conditions of Use set forth herein. 2. STANDARDS: Section Property Standard Year 1504.3.1 Wind Resistance FM 4474 2004 1507.2.4,1507.2.8,1507.2.9.2, Physical Properties ASTM D1970 2009 1507.4.5.1,1507.5.3,1507.7.3 1507.11.2 Physical Properties ASTM D6163 2000 1507.11.2 Physical Properties ASTM D6164 2005 1523.6.5.2.1 Physical Properties TA5103 1995 TAS 110 Accelerated Weathering TAS 110 2000 1507.3.3 Installation Practice FRSA/TRI April 2012(04-12) 2012 3. REFERENCES: Entity Examination Reference Date ERD(TST6049) ASTM D1970/TAS 110 2968.05.04-2 05/14/2004 ERD(TST6049) Physical Properties 2757.02.05 02/03/2005 ERD(TST6049) ASTM D1970/TAS 110 2974.03.05-2 05/17/2005 ERD(TST6049) Wind Resistance 2778.07.05 07/15/2005 ERD(TST6049) Wind Resistance 2779.11.05-111 04/18/2007 ERD(TST6049) TAS 103/TAS 110 57120.11.07-2 11/02/2007 ERD(TST6049) ASTM D1970/TAS 110 513190.02.09-R1 04/01/2010 ERD(TST6049) ASTM D1970/TAS 110 531370.03.10-1-R1 04/07/2010 ERD(TST6049) Physical Properties/Tensile Adhesion 511150.05.10-R1 09/09/2010 ERD(TST6049) Physical Properties/Tensile Adhesion 511150.05.09-R2 10/05/2010 ERD(TST6049) ASTM D1970 537210.11.11 11/09/2011 ERD(TST6049) ASTM D1970 540540.02.13-1 02/19/2013 ERD(TST6049) Physical Properties/Tensile Adhesion 543530.02.14-1 02/21/2014 ERD(TST6049) Physical Properties/Tensile Adhesion SOPC-SC7645.02.15 02/13/2015 ERD(TST6049) Physical Properties/Accelerated Weathering SOPC-SC8520.14 04/17/2015 M-D(CER1592) HVHZ Compliance 09-1005.02 11/04/2010 M-D(CER1592) HVHZ Compliance 13-0530.02 11/27/2014 ICC-ES(EVL2396) 2012,2009 and 2006 IBC Compliance ESR-1524 10/01/2014 PRI(TST5878) Physical Properties SOP-064-02-01 12/03/2013 UL,LLC(QUA9625) Quality Control Service Confirmation Exp.10/16/2017 4. PRODUCT DESCRIPTION: 4.1 Lastobond TU HT is a self-adhering,non-woven polyester fabric surfaced,SBS modified bitumen roof underlayment. 4.2 Lastobond Shield is a self-adhering,woven polyethylene surfaced,SBS modified bitumen roof underlayment available in two widths;36 and 45 inch. 4.3 Lastobond Shield HT is a self-adhering,woven polyethylene surfaced, high temperature, SBS modified bitumen roof underlayment. 4.4 Lastobond Pro HT-N is a self-adhering, woven polyethylene surfaced, SBS modified bitumen roof underlayment available in two widths;36 and 45 inch. 4.5 Lastobond Pro HT-S is a self-adhering, woven polyethylene surfaced, high temperature, SBS modified bitumen roof underlayment. 4.6 Lastobond 195 is a self-adhering,glass-mat reinforced,sand-surfaced,SBS modified bitumen roof underlayment. 4.7 Lastobond is a self-adhering,glass-mat reinforced,sand-surfaced,SBS modified bitumen roof underlayment. 4.8 Lastobond Eco is a self-adhering,glass-mat reinforced,sand-surfaced,SBS modified bitumen roof underlayment. Exterior Research and Design,LLC. Evaluation Report 518010.06.09-117 Certificate of Authorization#9503 FL2569-R9 Revision 7:04/17/2015 Page 2 of 6 TRINITY j ERD 4.9 Lastobond Smooth Seal HT is a self-adhering, glass-mat reinforced, film-surfaced, SBS modified bitumen roof underlayment. 4.10 Resisto LB1236 is a self-adhering,glass-mat reinforced,sand-surfaced,SBS modified bitumen roof underlayment,with a 36-inch sheet width. 4.11 PrimeSource Grip-Rite Eave &Valley Protector is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen roof underlayment,with a 36-inch sheet width. 4.12 Resisto LB1244 is a self-adhering,glass-mat reinforced,sand-surfaced,SBS modified bitumen roof underlayment,with a 44-inch sheet width. 4.13 Colphene FR GR is a self-adhering,fiberglass reinforced,granule-surfaced,SBS modified bitumen roof underlayment. 4.14 Unilay (e) is a mechanically attached, polyester reinforced, granule-surfaced, SBS modified bitumen roof underlayment. 5. LIMITATIONS: 5.1 This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in the HVHZ. 5.3 Fire Classification is not part of this report;refer to current Approved Roofing Materials Directory for fire ratings of this product. 5.4 Soprema Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced within FBC approval documents. If not listed,a request may be made to the AHJ for approval based on this evaluation combined with supporting data for the prepared roof covering. 5:5 Allowable roof covers applied atop the underlayments are follows: - TABLE 1:ROOFCOVER OPTIONS - Underlayment Asphalt Nail-On Tile Foam-On Tile Metal wood Shakes& Slate Shingles Shingles Lastobond TU HT Yes Yes YesYes Yes Yes See 5.5.1 Lastobond Shield/Pro HT-N Yes No No No Yes Yes Lastobond Shield HT/Pro HT-S Yes No No Yes Yes Yes Lastobond/Lastobond 195 Yes No No No Yes Yes Lastobond ECO /Resisto 1_81236, Grip-Rite Eave&Valley Protector/ Yes No No No Yes Yes Resisto LB1244 Lastobond Smooth Seal HT Yes No No Yes Yes Yes Colphene FR GR Yes Yes Yes No Yes Yes See 5.5.1 Yes Yes Unilay(e) Yes Batten Only See 5.5.1 No No No 5.5.1 "Foam-On Tile" is limited to use of the following adhesives unless tensile adhesion/ long term aging data from an accredited testing laboratory is provided. Underlayment Adhesive(s) Lastobond TU HT 3M 2-Component Foam Roof Tile Adhesive AH-160(FL6332)or Dow Chemical TileBond'"Roof Tile Adhesive(FL717) Colphene FR GR 3M 2-Component Foam Roof Tile Adhesive AH-160(FL6332) Unilay(e) 3M 2-Component Foam Roof Tile Adhesive AH-160(FL6332) Exterior Research and Design,I.L.C. Evaluation Report 518010.06.09-R7 Certificate of Authorization 119503 FL2569-R9 Revision 7:04/17/2015 Page 3 of 6 (_)o TRINITY I ERD 5.6 Allowable substrates are noted below: 5.6.1 Direct-Bond to Deck: Lastobond Shield,Lastobond Pro HT-N,Lastobond Shield HT or Lastobond Pro HT-S applied to: ➢ Plywood; ASTM D41 primed plywood; OSB;ASTM D41 primed OSB; Southern Yellow Pine; ASTM D41 primed Southern Yellow Pine;ASTM D41 primed structural concrete. Lastobond TU HT, Lastobond, Lastobond 195, Lastobond ECO, Resisto LB1236, Grip-Rite Eave & Valley Protector, Resisto LB1244 or Lastobond Smooth Seal HT applied to: ➢ Plywood;ASTM D41 primed plywood;OSB;ASTM D41 primed OSB;ASTM D41 primed structural concrete. Colphehe FR GR applied to: ➢ Plywood;ASTM D41 primed plywood;ASTM D41 primed structural concrete. Note: ➢ While not required over plywood, OSB or Southern Yellow Pine substrates, Soprema recommends priming with Elastocol Stick or Elastocol 600c if the final roof cover is not slated for installation within 24 hours. ➢ Soprema requires tongue-and-groove board decking be covered with plywood or OSB prior to installation of the self-adhering underlayment. 5.6.2 Bond-to-Insulation: Lastobond TU HT, Lastobond Shield, Lastobond Pro HT-N, Lastobond Shield HT, Lastobond Pro HT-S or Colphene FR GR applied to: ➢ DensDeck DuraGuard;DensDeck Prime;SECUROCK Gypsum-Fiber Roof Board. For installation under mechanically attached prepared roof coverings, insulation shall be attached per minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations under foam-on tile systems,insulation attachment shall be designed by a qualified design professional and installed based on testing of the insulation/underlayment system in accordance with FM 4474,Appendix D or TAS 114,Appendix J. 5.6.3 Bond to Mechanically Attached Base Laver: Lastobond Shield,Lastobond Pro HT-N,Lastobond Shield HT,Lastobond Pro HT-S or Colphene FR GR applied to: ➢ ASTM D226,Type I or II felt;Sopra-G;Modified Sopra-G. For installations under mechanically attached prepared roof coverings, base layer shall be attached per minimum codified requirements. For installations under foam-on tile systems,base layer shall be attached in accordance with FRSA/TRI April 2012(04-12). 5.6.4 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: FRSA/TRI April 2012 (04-12) does not address wind uplift resistance of all underlayment systems beneath foam-on tile systems, where the underlayment forms part of the load-path. The following wind uplift limitations apply to underlayment systems that are not addressed in FRSA/TRI April 2012(04-12)and are used in foam-on tile applications. Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads, and reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been applied). Refer to FBC 1609 for determination of design wind pressures. 5.6.4.1 Maximum Design Pressure=-45.0 psf. Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of AHJ. Primer: (Optional)Elastocol Stick or Elastocol 600c Underlayment: Colphene FR GR,self-adhered. 5.6.4.2 Maximum Design Pressure=-67.5 psf. Deck: Structural concrete to meet project requirements to satisfaction of AHJ. Primer: Elastocol 600c Underlayment: Colphene FR GR,self-adhered. 5.6.4.3 Maximum Design Pressure=-60.0 psf. Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of AHJ. Base Sheet: Sopra-G or Modified Sopra-G mechanically attached with nails(FBC 1517.5.1)and tin caps(FBC 1517.5.2)spaced 6-inch o.c.at the 4-inch laps and 6-inch o.c.in three,equally spaced rows in the center of the sheet. Underlayment: Colphene FR GR,self-adhered Exterior Research and Design,I.I.C. Evaluation Report 518010.06.09-R7 Certificate of Authorization#9503 FL2569-119 Revision 7:04/17/2015 Page 4 of 6 �TRINITYIERD 5.6.4.4 Maximum Design Pressure=-90.0 psf. Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of AHJ. Underlayment: Unilay(e)mechanically attached with Soprafix Polymer Batten Bar(PBB)or Soprafix Metal Batten Bar (MBB) with Soprema #15-EL fasteners spaced 6-inch o.c. within the 5-inch wide, self- adhering side laps. End laps are 6-inch wide and sealed using either heat-welding or hot-air welding techniques. 5.7 Exposure Limitations: 5.7.1 Lastobond Shield,Lastobond Pro HT-N,Lastobond,Lastobond 195,Lastobond Eco,Lastobond Smooth Seal HT,Resisto LB1236, Grip-Rite Eave &Valley Protector or Resisto LB1244 shall not be left exposed for longer than 30-days after installation. 5.7.2 Lastobond Shield HT or Lastobond Pro HT-S shall not be left exposed for longer than 90-days after installation. 5.7.3 Lastobond TU HT or Colphene FR GR or Unilay(e)shall not be left exposed for longer than 180-days after installation. 6. INSTALLATION: 6.1 Soprema Roof Underlayments shall be installed in accordance with Soprema published installation requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below. 6.2 Re-fasten any loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application,and prime the substrate with Elastocol Stick or Elastocol 600c(if applicable). 6.3 Lastobond TU HT, Lastobond Shield, Lastobond Pro HT-N, Lastobond Shield HT, Lastobond Pro HT-S, Lastobond, Lastobond 195, Lastobond Eco, Lastobond Smooth Seal HT, Resisto LB1236, Grip-Rite Eave & Valley Protector, Resisto LB1244 or Colphene FR GR: 6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections 1507 for the type of prepared roof covering to be installed. 6.3.2 Non-Tile Applications: While priming is optional,Soprema recommends priming with Elastocol Stick or Elastocol 600c if the final roof cover is not slated for installation within 24 hours. Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3 ft of release film. Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible. Once the entire length of membrane is in place, peel-off the release film diagonally while holding the membrane tight. Firmly roll the membrane into place to achieve a bond. Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6-inches and staggered not less than 2-ft from vertical seams in the course below. All over-granule end-laps shall be sealed using either heat-welding or hot air welding techniques. When installing at slopes above 8:12,Soprema recommends back-nailing in the overlap area at the top of the sheet at 12-inch o.c. For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper and center sheet over valley or ridge.Drape and press sheet into place,working from the center of the valley or ridge in each direction. For valleys,apply the sheet starting at the lowest point and work upward. 6.3.3 Tile Applications(Lastobond TU HT or Colphene FR GR only): Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the instructions noted above as a guideline. For Colphene FR GR in foam-on tile applications, reference is made to Section 5.6.4 herein for wind resistance limitations. Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. Exterior Research and Design,I.I.C. Evaluation Report 538010.06.09-R7 Certificate of Authorization#9503 F1.2569-119 Revision 7:04/17/2015 Page 5 of 6 �TRINITYIERD 6_4 Unila e : 6.4.1 Non-Tile Applications or Nail-On.Battened Tile Applications: Reference is made to Table 1 herein and FRSA/TRI April 2012(04-12)Installation Manual(if applicable). Apply sheet parallel to the roof edge and,starting at the eave with the selvedge-edge upslope,mechanically attach the 5-inch wide selvedge-edge to the wood deck with nails and tin caps or round cap-nails spaced 36-inch o.c. Apply the second course in a water-shedding manner with self-adhering side-laps. Vigorous hand or motorized roller pressure is applied to the self-adhering laps to ensure a watertight application. .Vertical seams should be 6-inches and staggered not less than 2-ft from vertical seams in the course below. All over- granule end-laps shall be sealed using either heat-welding or hot air welding techniques. Tile (if applicable) shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. 6.4.2 Foam-On Tile Applications: Reference is made to FRSA/TRI April 2012(04-12)Installation Manual and Table 1 herein. Apply sheet parallel to the roof edge and,starting at the eave with the selvedge-edge upslope,mechanically attach the 5-inch wide selvedge-edge to the wood deck Soprafix Polymer Batten Bar (PBB) or Soprafix Metal Batten Bar (MBB)with Soprema#15-EL fasteners spaced 6-inch o.c. Apply the second course in a water-shedding manner with self-adhering side-laps. Vigorous hand or motorized roller pressure is applied to the self-adhering laps to ensure a watertight application. Vertical seams should be 6-inches and staggered not less than 2-ft from vertical seams in the course below. All over- granule end-laps shall be sealed using either heat-welding or hot air welding techniques. Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. 7. BUILDING PERMIT REQUIREMENTS: As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. 8. MANUFACTURING PLANTS: Contact the manufacturer or the named QA entity for information on plants covered under Rule 61G20-3 QA requirements. 9. QUALITY ASSURANCE ENTITY: UL,LLC—QUA9625;(314)578-3406;k.chancellor@us.ul.com -END OF EVALUATION REPORT- Exterior Research and Design,I.I.C. Evaluation Report 518010.06.09-R7 Certificate of Authorization#9503 FL2569-R9 Revision 7:04/17/2015 Page 6 of 6