Loading...
HomeMy WebLinkAboutMisc Letters Fort Pierce Utilities Authority �Y COV( " "Committed To Quality" Key Accounts 206 S.6th Street Fort Pierce, FL 34984-3191 Phone(772)466-1600 Fax(772)467-3115 Job Location: 1200 WHITE OAK LN Invoice Number: KA-112-15 Account Name: MARK DOWDY PCN: 340943100100001 Contact Name: MARK DOWDY LocID: 10006747-154547 Billing Address: 1200 WHITE OAK LN FORT PIERCE FL 34882 Phone: (772)828-7816 Fax:( ) - Cell:( ) - Cust Type Residential City Limits Outside Xn- Ta'F:'g'�y� F sic aS xy 1 rX `'� fi.d^' S J7^`i "'�R:F• :?;b- t -'' SYC`,t a,''4 - ti• ,;R d tt§ 'fs-K j•4,5 S ki..�^.s""�S t1',f' "7'..^.Et Y,h.> rµ. 1 5/8 X 3/4" Water Meter and/or Service Installation $250.00 Water Security Deposit $60.00 Water New Account Setup Charge $40.00 Water Capital Improvement Charge W ERC's 0.00 $0.00 Wastewater Security Deposit $0.00 Wastewater New Account Setup Charge $0.00 Wastewater Capital Improvement Charge WW ER C's 0.00 $0.00 Lien Fees 0.00 Y 3',�,�.o,'Z y 5" ,'xu xX : +,.. �-v psi°'�"'Sw 7< �, z'�'.�' vvt"rx: ,.,�et'•.�s s z..l':t— ''.'.` S -r .r;�sr ^'�,;�S k ����s�� z`�e�Y�„i�•r4"..��il„<1C&..w�'>ui.�:+3, u�..ur: ra '�G«a...-Y`W .r.�"i o.� :Po-�._'f�a5. t:c:.f�°:u. z :Ls'7'.f�, r�"..s ,t..._'.t4,',•�:,"� w:a �,A�'c�s�'t.:.- d��.tz~., «ac�Mr �zi.....a.Ii�•t�t...,�,...'1�'4..� 0.00 0.00 Down Payment: $0.00 Invoice Total: $350.00 Description for service order: INSTALL 5/8 X 3/4"WATER METER LINES INSTALLED IN BACK ON CITRUS Total Paid: Date Paid: Check Number: Customers will be assessed wastewater charges the day they connect to the wastewater system or within 385 days from date wastewater Connection Charge is paid-whichever Is first The cost of the service line from the point of delivery at the property line to the housefbuilding is the responsibility of the customer and is not included in this invoice. state laws require that a permit from the Health Department must be obtained prior to initiatina a septic tank abandonment.Contact the Health Department at(772)873-4931. Construction cost estimates are based on current labor,equipment and material prices. Actual costs of construction will be determined at the completion of the project. Should unforeseen circumstances be encountered during construction,including but not limited to adverse weather conditions and construction conflicts,the customer will be responsible for increased costs. Additional costs Incurred by the customer shall not exceed fifteen(15) percent of the total estimated construction costs shown above. Estimated costs paid by the customer that exceed the actual cost of construction will be refunded by Fort Plerce Utilities Authority. Reviewed By: Lori Batfwaqlia Key Accounts Specialist Date: 10/07/2015 Customer's Signature: Date: 20/ Printed Name: LQ�-✓