Loading...
HomeMy WebLinkAboutProduct Review Affidavit a rl e e rf Florida Department d SCIS Home Log In 1 User Registration Hot Topic Submit Surcharge Stats&Facts i Publications ( FBC Staff BCIS Site Map Links Search Businesi//) Professi� al usER:PublicUprOval Regulation Product Approval Menu>Product or Application Search>Application List>Application Detail FL# FL1654-R16 Application Type Revision Code Version 2014 Application Status Approved Comments Archived Product Manufacturer POLYGLASS USA Address/Phone/Email 150 Lyon Drive Fernley, NV 89408 (570)384-1230 Ext 242 jakins@polyglass.com Authorized Signature James Akins jakins@polyglass.com Technical Representative Steve Wadding Address/Phone/Email 150 Lyon Drive Fernley,NV 98408 (602)363-7139 stevew@polyglass.com Quality Assurance Representative James Akins \6 Address/Phone/Email 555 Oakridge Road k� Q Humboldt Industrial Pkwy \t! Hazleton,PA 18201 `\ (800) 894-4563 jakins@polyglass.com Category Roofing Subcategory Modified Bitumen Roof System Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer Evaluation Report- Hardcopy Received Florida Engineer or Architect Name who developed the Robert Nieminen Evaluation Report Florida License PE-59166 Quality Assurance Entity UL LLC Quality Assurance Contract Expiration Date 06/27/2016 Validated By John W. Knezevich,PE Validation Checklist- Hardcopy Received Certificate of Independence FL1654 R16 COI 2015 01 COI Nieminen.odf Referenced Standard and Year(of Standard) Standard Year ASTM D6162 2000 ASTM D6163 2000 ASTM D6164 2005 ASTM D6222 2008 ASTM D6509 2009 FM 4470 1992 FM 4474 2004 Equivalence of Product Standards Certified By Sections from the Code Product Approval Method Method i Option D Date Submitted 06/17/2015 Date Validated 06/23/2015 Date Pending FBC Approval 06/28/2015 Date Approved 08/18/2015 Summary of Products FL* Model,Number or Name Description 1654.1 Polyglass SBS and APP Modified SBS and APP modified bitumen roof systems Bitumen Roof Systems Limits of Use Installation Instructions Approved for use in HVHZ:No FL_1_654 R16 II 2015 06 FINAL Al ER POLYGLASS MODBIT FL1654- Approved for use outside HVHZ:Yes R16.pdf Impact Resistant:N/A Verified By: Robert Nieminen PE-59166 Design Pressure:+N/A/-622.5 Created by Independent Third Party:Yes Other: 1.)The design pressure in this application Evaluation Reports relates to one particular assembly over concrete FL1_654 R16 AE 2015 06 FINAL ER POLYGLASS MODBIT FL1654- deck. Refer to the ER Appendix for other systems and R16.odf deck types. 2.)Refer to ER,Section 5 for other Limits Created by Independent Third Party:Yes of Use. Sack Nett Contact Us::1940 North Monroe Street,Tallahassee FL 32399 Phone:850-1187-1824 The State of Florida is an AA1EEO employer.Copyright 2007-2013 State of Florida.::Privacy Statement::Accessibility Statement::Refund Statement Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.*Pursuant to Section 455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have one.The emails provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S., please click here. Product Approval Accepts: M sccurlt, T1UCS' \\J TRINITY I ERD APPENDIX 1:ATTACHMENT,REQUIREMENTS FOR WIND UPLIFT RESISTANCE Table Deck Application Type Description Page IA-1 Wood New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 4 1A-2 Wood New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 5 16 Wood New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 5 1C Wood New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 6 1D Wood New,Reroof(Tear-Off)or Recover D Prelim.Attached Insulation,Mech.Attached Base Sheet,Bonded Roof Cover 6 1E-1 Wood New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet(nails),Bonded Roof Cover 7-8 1E-2 Wood New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet(screws&plates),Bonded Roof Cover 8-9 1F Wood New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 9 2A Steel or Conc. New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 10 213 Steel or Conc. New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 11-12 2C Steel or Conc. New,Reroof(Tear-Off)or Recover D Prelim.Attached Insulation,Mech.Attached Base Sheet,Bonded Roof Cover 13-14 3A-1 Concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 15-18 3A-2 Concrete New or Reroof(Tear-Off) A-1 Bonded Temporary Roof,Bonded Insulation,Bonded Roof Cover 19-20 3B Concrete New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 21 4A LWIC New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 22-23 4B LWIC New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 24 4C LWIC New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 25-27 5A CWF New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 28 56 CWF New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 29 5C CWF New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 30 SD CWF New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 30 5E CWF New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 30 6A Gypsum New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 31-32 66 Gypsum New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 33 6C Gypsum New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 33 6D Gypsum New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 33 7A Various Recover A-1 Bonded Insulation,Bonded Roof Cover 34-36 713 Various Recover F Non-Insulated,Bonded Base Sheet,Bonded Roof Cover 36 The following notes apply to the systems outlined herein: 1. The roof system evaluation herein pertains to above-deck roof components. Roof decks and structural members shall be In accordance with FBC requirements to the satisfaction of the AHJ. Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. 2. Insulation/base sheet fasteners shall be of sufficient length for the following deck engagement: ➢Wood: Minimum 0:75-inch penetration. ➢Steel: Minimum 0.75-inch penetration and engage the top flute of the steel deck. ➢Concrete: Minimum 1-Inch embedment into pilot hole in accordance with fastener manufacturer's published installation Instructions. 3. Unless otherwise noted, insulation may be any one layer or combination of polyisocyanurate, polystyrene, wood fiberboard, perlite, gypsum-based roof board or mineral-wool roof board that meets the QA requirements of F.A.C.Rule 61G20-3 and is documented as meeting FBC 1505.1 and,for foam plastic,FBC Chapter 26,when installed with the roof cover. Exterior Research and Design,I.I.C.d/b/a Trinity I ERD Evaluation Report P9290.02.08-1114 for F1.1654-1116 Certificate of Authorization 99503 Revision 14:06/17/2015 Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 1 of 36 \' IERD !T�aNiTY 14. Unless otherwise noted,refer to the following references for bonded base,ply or cap sheet applications. 'TABLET:POLYGLAssROOFGOVERS, Reference Layer Material Application BP-AA Base Polyglass G2 Base,FBC Approved ASTM D4601,Type II Base and PI sheets,Asphalt-Applied) HA at 20-40 lbs/square ( Y Ply Polyglass Ply IV,Polyglass Ply VI,FBC Approved ASTM 02178,Type IV or VI Base or Ply Elastobase,Elastobase Poly,Elastoflex V,Elastoflex S6,Polyglass HT Base 650 SBS-AA (SBS,Asphalt-Applied) Cap Elastoflex 56, Elastoflex 56 G, Elastoflex S6 G FR, Elastoshleld TS-G, Elastoshleld TS-G FR, Polyfresko G 585 (sand-backed), HA at 20-40 lbs/square Polyfresko G SBS FR(sand-backed) Base or Ply Elastoflex V,Elastoflex S6 SBS-TA (SBS,Torch-Applied) Cap Elastoflex V,Elastoflex 56,Elastoflex S6 G,Elastoflex 56 G FR,Elastoshield TS-G,Elastoshleld TS-G FR,Polyfresko G SBS(poly- Torch-Applied film backed),Polyfresko G SBS FR(poly-film backed) SBS-SA Base Elastoflex SA V Base,Elastoflex SA V FR Base,Elastoflex SA V Plus,Elastoflex SA V Plus FR Self-Adhering (SBS,Self-Adhering) Cap Elastoflex SA P,Elastoflex SA P FR,Polyreflect APP-TA Base or Ply Polyglass APP Base,Polyflex,Polybond Torch-Applied (APP,Torch-Applied) Cap Polyflex,Polyflex G,Polyflex G FR,Polybond,Polybond G,Polyfresko G,Polyfresko G FR APP-SA Cap Polyflex SA P,Polyflex SA P FR,Polyfresko G SA,Polykool Self-Adhering (APP,Self-Adhering) 15. Any of the following FBC Approved coatings may be applied to the top roof membrane without adverse effect on the system wind load performance. Refer to current Roofing Materials Directory for fire ratings associated with coating usage. ➢ PG200 Non Fibered Roof Coating; ➢ PG300 Fibered Roof Coating; ➢ PG600 Non-Fibered Aluminum Roof Coating; PG650 Fibered Aluminum Roof Coating; ➢ PG700 High Quality Elastomeric Roof Coating; ➢ PG800 Asphalt Emulsion Roof Coating; ➢ Polyplus 60 Premium Non-Fibered Aluminum Roof Coating; Polyplus 65 Premium Fibered Aluminum Roof Coating; ➢ Polybrite 70 Premium Grade Elastomeric Roof Coating; Polybrite 90 High Solids Silicone Roof Coating or Polybrite 95 Silicone Roof Coating. 16. The following represent priming requirements for gypsum-based coverboards: ➢ Dens Deck and Dens Deck Prime shall be field-primed with PG100 prior to self-adhering or torch-applied membrane application. No priming is required for hot-asphalt membrane applications. ➢ SECUROCK Gypsum-Fiber Roof Board does not require field priming for any membrane application. 17, "MDP"=Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads.Refer to FBC 1609 for determination of design wind loads. Exterior Research and Design,I.I.C.d/b/a Trinity I ERD Evaluation Report P9290.02.08-R14 for FL3654-1136 Certificate of Authorization 09503 Revision 14:06/17/2015 Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 3 of 36