HomeMy WebLinkAboutProduct Approval Florida Building Code Online DEC O 7 E1 ttp://www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVX...
RECIT.- http://www.floridabuilding-c)rg/pr/Pr�
L F e"°
CIA!s <
i l'�A.:.I"y'��R:>;✓#„��a�,.3 r i�1 l '�.�;CRs:�l S,�},_•.°,i',�a�r,,'1.AI.:'. ' t_._.__.._�.._....:..._.__�F._. az'a.''a�
BCIS Home '. Log In User Registration Hot Topics `. Submit Surcharge 7 Stats&Facts Publkatons FBC Staff eCIS S to Map Li Search ;
Business _.4e0
l �j..� Product Approval
Professi ss'
USER:Pubic User
R°aU1a tion
Product 4rmr;J.gi Mgnu>P�D.Qvso_ARJifa_:roL.i�ar�`1>ap;�r.4y;,o�list>Application netail
FL FL7006-R9
Application Type Revision
Code Version 2014
Application Status Approved
*Approved by DBPR.Approvals by DBPR shall be reviewed and ratified
by the POC and/or the Commission if necessary.
Comments
Archived
Product Manufacturer IKO Industries,Ltd
Address/Phone/Email 40.Hansen Road South
Brampton,NON-US L6W 3H4
(708)496-2800 Ext 200
rmetzOO1@tampabay.rr.com
Authorized Signature Robert Metz
rmetzOOI@tampabay.rr.com
Technical Representative Bob Metz
Address/Phone/Email REMCO of Pinellas
456 Avila Circle NE
Saint Petersburg,FL 33703
(727)776-5261
rmetzOOI@tampabay.rr.com
Quality Assurance Representative Don Shaw
Address/Phone/Email IKO Industries LTD
120 Hay Rd.
Wilmington,DE 19808
(717)579-6706
don.shaw@iko.com
Category Roofing
Subcategory Asphalt Shingles
Compliance Method Certification Mark or Listing
Certification Agency FM Approvals-CER
Validated By Locke Bowden
Validation Checklist-Hardcopy Received
Referenced Standard and Year(of Standard) Standard Year
ASTM D3161 modified to 110 mph 2009
ASTM D3462 2009
ASTM D7158 Class H 2008
ASTM E108 2007
1 of 3 7/13/2015 12:06 PM
Florida Building Code Online http://www.floridabuildmg.org/pr/pr__appjtl.aspx?param=wGEVX...
Equivalence of Product Standards
Certified By
Product Approval Method Method 1 Option A
Date Submitted 06/28/2015
Date Validated 06/30/2015
Date Pending FBC Approval
Date Approved 07/06/2015
Summary of Products
FL* Model,Number or Name Description
7006.1 Cambridge,Cambridge HD and CRC Laminated architectural fiberglass asphalt shingle
Biltmore AR manufactured at IKO's Kankakee,IL; Hawkesbury,Ont.;
Wilmington,DE;Sylacauga,AL and Toronto,Ont.plants
Limits of Use Certification Agency Certificate
Approved for use in HVHZ:Yes 3161 leiter-
Approved for use outside HVHZ:Yes 4-15-201
5 •odf
Impact Resistant:N/A FL7006 R9 C CAC FM Letter-ASTM dtter- 5 6
Design Pressure:N/A 15 Rte,
Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3
15 .pdf
Quality Assurance Contract Expiration Date
12/31/2020
Installation Instructions
FL7006 R9 II.IKO-133_9_2-_01 Letter-Installation
jnstructiprsfor EBC FL7006.pdf
Verified By:Duc T Nguyen 65034
Created by Independent Third Party: No
Evaluation Reports
Created by Independent Third Party:
7006.2 Hip and Ridge 12 Cap fiberglass This is a 12"x 12"fiberglass asphalt shingle used to cover
shingles the hip and/or ridge of an asphalt shingle roof system
manufactured in Toronto,Ont.and Brampton,Ontario
Limits of Use Certification Agency Certificate
Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter-
Approved for use outside HVHZ:Yes 4-15-2015 .Ddf
Impact Resistant:N/A 1`1-700 R9 C CAC FM Letter-ASTM d3462 letter-5 b
Design Pressure:N/A 15p
Other: FL7006.R9 C CAC FM-Letter---ASTM 3
E 108 letter- 5
15 .pdf
- - -------
Quality Assurance Contract Expiration Date
12/31/2020
Installation Instructions
FL7006 R9 Ii HiD and Ridge Cao Shingle Insta latiop
Instructions:Ddf
FL7006 R9 II -IKO-1'33-02-01 Letter-Installation
Instructions for FBC FL70D6.Ddf
Verified By:Duc T Nguyen PE 65034
Created by Independent Third Party: No
Evaluation Reports
Created by Independent Third Party:
7006.3 Leading Edge Plus Asphalt Shingle One piece fiberglass asphalt shingle used as a starter strip at
Starter Strip the bottom of a roof system manufactured in Brampton and
Hawkesbury,Ontario plants
Limits of Use Certification Agency Certificate
Approved for use in HVHZ:Yes FLZQQfzP2_C GAC-EMJLetter-ASTM d3l61 letter-
Approved for use outside HVHZ:Yes 4-15-2015_pdf
Impact Resistant:N/A FL7006 R4 C CAG - etter-ASTM d3462 I tteL=5-E
Design Pressure.,N/A L5-Pdf
Other: ELI-Q96 R2G--CACFM Lie tqt ASTM E 108 lever 5 3
15 .Ddf
Quality Assurance Contract Expiration Date
2 of 3 7/13/2015 12:06 PM
Florida Building Code Online bttp://www.floridabuilding.org/pr/Prapp
_dtl.aspx?param=wGEVX
12/31/2020
-Installation Instructions
EL7006R9 Il IK0-13
Instructions for FBC FL7006.pdf
FL7006.R§ IL fRoofing-PMducts-Leading-Edcle-Plus-
Aoplicatign-EN(1).pclf
Verified By:Duc T Nguyen PE 65034
Created by Independent Third Party:No
'Evaluation Reports
F
Created by Independent Third Party:
7006.4 Marathon 25 AR,CRC Superglass 3 tab fiberglass asphalt shingle manufactured at IKO's
M25AR Brampton,Ontario,Hawkesbury Ont.,Toronto,Ont.;
Sylacauga,AL and Kanakakee,IL plants
Limits of Use Certification Agency Certificate
Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-A!jT_Md:j161_LQtter-
Approved for use outside HVHZ:Yes A-_15-2015 pdf
Impact Resistant-N/A FL7006 Rg—(; CAC FM Letter
Design Pressure:N/A 15.pKL
f
Other:
EL7-0_,Q6_R9 C CAC_FM Lett -ASTM E 108 letter- 5 3
1_q_�. df
Quality Assurance Contract Expiration Date
12/20/2020
Installation Instructions
EL7006 R2—IJ-1K0--l-33-02-01 Lel ter-Installation
Instructions
Verified By:Duc t Nguyen 65034
Created by Independent Third Party:No
Evaluation Reports
Created by Independent Third Party:
Back, !�
C=&113 IRAQ North MOOME Street-Tallahassee F1 17399 ehare,850-487-1824
The State of Florkla Is an AA/EEO employer.Copyright 2007-2013 Staten Florida.::Privacy statement::Accasslft Statemen ::Refund statement
Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a pubric-records request,do not send electronic
mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.'Pursuant to Section
455.275(l),Florida Statutes,effective October 1,2012,rxensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have
one.The emails;provided maybe used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a
personal address,please provide the Department with an email address which can be made available to the public.To determine if you area licensee under Chapter
455,F.S.,please click here—.
Product Approval Accepts;
-5—iX E9 0
securitv.,.t,oocy
3of3 7/13/2015 12:06 PM
IM Aoprovals
FM Approvals hMmher tj the Fid 0,1&wi
1151 Boston-Providence Turnpike
P.O.Box 9102 Norwood,MA 02062 USA
T:781762 4300 F:781 762 9375 www.finapprovals.com
May 3,2015
Mr.Donald Shaw
IKO Industries,Ltd.
40 Hansen Road South
Brampton,Ontario L6W 3114
Canada
Customer ID: 1000000686
Subject: IKO Industries Ltd.'s FM Approved asphalt roof shingles
Dear Mr.Shaw,
This letter is being written following in regards to your recent inquire regarding verification of the ASTM
D3161 testing of IKO Industries Ltd's asphalt roof shingles. IKO's shingles that are FM Approved have
been tested in accordance with ASTM D3161 (reports 3040947 and 3038510).
FM Approvedproducts:
IKO Industries Ltd. Crowne Slate,Cambridge,Hip&Ridge 12,Marathon 25 AR,Marathon
Ultra AR,Cambridge IR,Leading Edge Plus,Cambridge HD,Marathon
25,Hip&Ridge Plus,Dynasty with ArmourZone
Canroof Corporation,Inc. Biltmore,Hip&Ridge 12(CRC),Superglass 25 M AR,Superglass
Ultra AR, CRC Hip&Ridge Plus
Please be advised that shingles noted above tested to previous versions of ASTM D3161 continue
to meet the test criteria of the current version of ASTM D3161.
If you have any questions please do not hesitate to contact me.
Very truly yours,
✓ - -W..
David L.Alves Phillip J.Smith
Senior Engineer-Materials Group Principal Engineer-AVP
FM Approvals FM Approvals
1151 Boston-Providence Turnpike
Norwood,MA 02062
T:781 255 4856
E:davici.alves�,.fma�rovals.com
O C E FM � g>m
O
''
x APPROVED APPROVED
[tkApprovals,
l•Ir.m5er of the/rAl Q.'a�.d Gmi p
FM Approvals
1151 Boston-Providence Turnpike
P.O.Box 9102 Norwood,MA 02062 USA
T:781 762 4300 F:781 762 9375 www.finapprovals.com
May 6,2015
Mr.Donald Shaw
IKO Industries,Ltd.
40 Hansen Road South
Brampton,Ontario L6W 3114
Canada
Customer ID: 1000000686
Subject: IKO Industries Ltd.'s glass reinforced asphalt roof shingles
Dear Mr.Shaw,
This letter is being written following in regards to your recent inquire regarding verification of the ASTM
D3462 monitoring IKO Industries Ltd's glass reinforced asphalt roof shingles. IKO's shingles that are FM
Approved and/or Specification Tested Listed are monitored by FM Approvals for compliance with ASTM
D3462. They continue to meet this standard.
If you have any questions please do not hesitate to contact me.
Very truly yours,
�� //J,,,
David L.Alves Phillip J.Smith
Senior Engineer-Materials Group Principal Engineer-AVP
FM Approvals FM Approvals
1151 Boston-Providence Turnpike
Norwood,MA 02062
T:781 255 4856
E:.david.alves'ci�.fma}3provals.com
O C E
APPROVED APPROVED
<_JM Avproval
.'.Iorl:iur ap'thv F1;GS^::';!i Gr:ur>
FM Approvals
1151 Boston-Providence Turnpike
P.O.Box 9102 Norwood,MA 02062 USA
T:781762 4300 F:781 762 9375 www.fmapprovals.com
April 15,2015
Mr.Donald Shaw
IKO Industries,Ltd.
40 Hansen Road South
Brampton,Ontario L6W 3H4
Canada
Customer ID: 1000000686
Subject: IKO Industries Ltd.'s FM Approved and Specification Tested asphalt roof
shingles
Dear Mr. Shaw,
This letter is being written following in regards to your recent inquire regarding verification of the ASTM
El 08 testing of IKO Industries Ltd's asphalt roof shingles. IKO's glass and organic shingles that are FM
Approved and Specification Tested have been tested in accordance with ASTM E108. I have arranged the
shingles by category.
FM Approvedproducts:
IKO Industries Ltd. Cambridge,Cambridge HD,Marathon 25,Marathon 25 AR,Marathon
Ultra AR, Superglass Ultra AR,Crowne Slate,(IKO)Hip&Ridge 12,
Hip&Ridge Plus,Dynasty with ArmourZone,Cambridge IF,Leading
Edge Plus
Canroof Corporation,Inc. Biltmore,Biltmore AR,Superglass 25 M AR,Superglass Ultra AR,
CRC Hip&Ride 12, CRC Hip&Ridge Plus
S ecification Testedproducts:
IKO Industries Ltd. Cambridge AR Dual Black,Royal Estate,Marathon 20,Armour Starter,
Armourshake,Roofshake HW
Canroof Corporation,Inc. Biltmore AR Dual Black,Superglass 20,Biltmore AR
Please be advised that shingles noted above tested to previous versions of ASTM E108 continue
to meet the test criteria of the current version of ASTM E108.
If you have any questions please do not hesitate to contact me.
Very truly yours,
David L.Alves Phillip J.Smith
Senior Engineer-Materials Group TTM-AVP
FM Approvals FM Approvals
C E
X APPROVED APPROVED
AIM/-
CONSTRUCTION MATERIALS
TECHNOLOGIES
March 30, 2015
IKO Industries, Ltd
120 Hay Rd.
Wilmington, DE 19809
Re: FBC FL7006
Sir(s),
PRI Construction Materials Technologies has completed a technical review and attached sealed shingle
instructions in compliance the 2014 Florida Building Code.
This review was completed based on the receipt of following evidence from IKO Industries, Ltd:
1) IKO Shingle Application Instructions—3-Tab Shingles
(EN-3Tab Appins_8AGXEFS-2012-11_reformatted 2013-02-rev07/13-Florida)
2) IKO Laminated Shingles Application Instructions
(EN-Laminated Appins-8TTEFS-2012-04—reformatted 2013-02-rev07/13-Florida)
3) IKO-Hip and Ridge 12 Application Instructions
(EN-HipandRidge12-3HRTri-2013-08—reformatted 2013-08)
4) IKO Leading Edge Plus Shingle Application Instructions
(EN-3LEP-Tri-2012-06—reformatted 2013-03)
5) ASTM D3161 Test Report(FM Approvals Project No. 3040947)
The attached instructions should be used in conjunction with the published manufacturer's application
instructions and applicable code. In the event the instructions conflict, these instructions shall govern.
Statement of Independence:PRI Construction Materials Technologies and/or Duc T.Nguyen,FL P.E.do not
have nor plan to acquire a financial interest in any company manufacturing or distributing products for which
the test reports are issued.
Signed: ;i�_;i;�� ,.� ��./ �:��r" i Signed: r �
Brad GrzyboWski Duc T.N 19v _
Managing D ireFlorida Reis Bred Professional Engineer
P.E.Number:66034
Date: April 30, 2015 Date: April 30,2015
Attachments: A) IKO Shingle Application Instructions-3-Tab
B) IKO Laminated Shingles Application Instructions
C) IKO Hip and Ridge 12 Application Instructions
D) IKO Leading Edge Plus Application Instructions
IKO-133-02-01
PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621.5777 Fax:813-621-5840 e-mail;materialstesting@pdcmLcom WebSile:htfp:Nwww.pricmt.com
IKO
Installation Instructions for
Asphalt Shingles
Page 2 of 5
IMC® Shingle Application Instructions — 3-Tab Shingles
(ASTM D3161, Class F—IKO Marathon 25 AR and CRC Superglass M25AR)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC.
UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is
less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code
requirements, the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping
each preceding course by 19"or other Approved underlayments in accordance with the qualified application
instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of
underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top
of any underlay along rake edges and directly to the deck along eaves in accordance with building code
requirements.
NAILING:Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long
enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed 6-1/8"above the butt
edge,approx. 1"and 13"from each end and 1/2"above each cutout. Drive nails straight so that nail head is
flush with, but not cutting into shingle surface.
NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(600)or more, use 6 nails per shingle placed
as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each
shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt
plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle.
Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles
should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the
heat of direct sunlight.
EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8".
STEEP SLOPES
1, .
—i —o — SEALING STRIP o 6t18"
1/2'
NAILS NAILS
DO NOT NAILINTO OR ABOVETHE SEALING STRIP
PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:matedalstesting@pdcmt.com Website:http:/Awnv.pdcmtcom
^
^
IKO
Installation Instructions for
Asphalt Shingles
Page ooro
UKOLaminated Shingles Application Instructions
(ASTM D3i61, Class F—Cambridge, Cambridge HD, and CRC Biltmore AR)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN C0N0UCTkO0 WITH IK0'G PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IWTHE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
ROOF DECK, Solidly sheathed and fastened deck conforming bo2U14F8C.
UNDERLAYMENT:Applied in accordancewith building code requirements.For areas where the roof slope is
less than 4" per foot down bo2" per foot, use layers of underlyt conforming to building code
requirements, the first sheet overlapping the eoveprotection by19'.followedbyfull 38"widths overlapping
each preceding course by.1{Y'nrother underlayments inaccordance with the qualified application
instructions. For areas where the roof slope is 4" per foot orgreater cover the deck with one ply of
underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end I�ps. Apply metal drip edges on top
of any underlay along rake edges and directly to the deck along eaves in accordance with building code
requirements.
NAILING:Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long
enough hopenetrate through plywood or 3/4"into boards. Use 4nails per shingle placed inthe nail line 7-3/8
below the top edge,approx. 1"and 13"|nfrom each end. Drive nails straight oothat nail head ioflush with,
but not cutting into shingle surface,
NAILING ON STEEP SLOPES: For steep slopes of 21"per foot(60')or more,use 6 nails per shingle placed
aoshown below. Ensure that nonail iowithin 2"ofojoint/cutout ofthe underlying shingle. Seal dh
shingle -'----n--h-'--1 diameter`~,p'~^.size and thickness"'aquarter)spots u,asphalt
plastic cement placed under the shingle 2"above the bottom edge and equally spaced okm~ - ~
d) shingle.
Apply plastic cement in moderation '
dion since excessive amounts m blistering. CAUTION: Shin~eo
should sea[tothe unded�ngcoumewhen the fa�uryapplied asphalt sealant ioau��nksnt�warmed by
heat cfdins�sunlight.
-' -
EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8".
wxmms-mEspoLopsnxppupAzmw
Use six nails axmmwn.
+
rare,
�___
o= NAIL LINE
�,��
NAILS ENMENT
.
PROPER APPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OFTHE SHINGLE
PRI Construction Materials Technologies,uu6412omdgocmve mmpa,a33610 ng:813-521-577mm8/3-621�5840 L�mol:mate¥nmsto@pdcmuom wo»mte:mtp.,m~vwndcrnuom
IKO
Installation Instructions for
Asphalt Shingles
Page 4 of 5
IKO Hip and Ridge 12 Application Instructions
(ASTM D3161, Class F—IKO Hip and Ridge 12)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONDUCTION WITH IKOIS PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are
designed for a 51/8"(130 mm)exposure. (For a neater appearance,the top of each side of each piece has
been factory trimmed on a 1"(25 mm)taper(see drawing). Bend each piece over the hip or ridge,and nail 5
5/8"(143 mm) above the butt edge 1" (25 mm) in from each edge,exposing each piece 5 1/8"(130 mm).
Apply hip pieces starting at the lower end of the hip,working up toward the ridge. On hip roofs, apply ridge
pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end
opposite to the prevailing wind direction and continue to the other end. Note:To obtain a three-dimensional
effect,(which is recommended,but not required),apply hip and ridge shingles double thickness by stacking 2
pieces on top of one another, the lower piece extending about 3/4"(19 mm)further than the top piece(see
diagram).The final shingle should be set in cement,and the exposed nail heads of the final shingle should be
covered with cement. Prior to application in cold weather, storing the shingles in a heated area will allow for
easier bending.
NOTE:SHINGLES MUST BE APPLIED PROPERLY,THEYARE DESIGNED FOR USE AS HIPAND RIDGE
SHINGLES ONLY,AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS. WE ASSUME NO
RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POOR APPLICATION OR FAILURE TO
PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER
VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS.REVIEW
ALLAPPLICABLE BUILDING CODES,MINIMUM PROPERTY STANDARDS,AND REQUIREMENTS PRIOR
TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS.
TAPrR CUT
3r.
(f 62.ml
PRI construction Materials Technologies.LLC. 6412Badger Drive Tampa,FL 33610 Tel:813.621.5777 Fax:813.621-5840 e-mail:matedalstestng@pdcmt.com WebSife:h1tp:/Atiww,prcmLcom
IKO
Installation Instructions for
Asphalt Shingles
Page 5 of 5
IKO Leading Edge Plus Application Instructions
(ASTM D3161, Class F—IKO Leading Edge Plus)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
1. Apply any underlayment, eave protection, valley flashings, or drip edges to roof deck as required.
2. Each 39 3/8"x 131/4"(1000 mm x 336 mm)IKO Leading Edge Plus strip is perforated lengthwise for
separation into two(2)shingles.Take one IKO Leading Edge Plus strip and fold flat at perforation to
separate.
3. Take one of the separated shingles 39 3/8"x 6 5/8"(1000 mm x 168 mm)and remove approximately
20"(500 mm). Install this shingle on the lower left corner of the roof deck, granule side up,with the
factory installed sealant adjacent to the eaves.The shingle should overhang the rake edge and eaves
by a nominal 1/4"(6 mm)minimum. Fasten the shingle to the roof deck with nails located 3"to 4"(75
mm to 100 mm)from the eave edge and 1"(25 mm) in from each end.
4. Take the leftover 20"(500 mm)piece shingle.Rotate the piece and align it vertically up the rake edge
with the factory installed sealant adjacent to the outer edge of the roof.The shingle should overhang
the rake edge by a nominal 1/4"(6 mm)minimum. Fasten the shingle to the roof deck with fasteners
located 3"to 4"(75 mm to 100 mm)from the rake edge and 1"(25 mm) in from each end.
5. Repeat Steps 3—4 for the right lower comer of the roof deck.
NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge,with at least
3/8"(9 mm)diameter heads, long enough to penetrate through plywood or 3/4"(20
mm) into boards. Use 4 nails per shingle placed 3"to 4"(75 mm to 100 mm)from
the eave edge and approximately 1"and 13"(25 mm and 330 mm)in from each end.
6. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck.Install
the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles
should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum.Fasten the shingles to
the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge,4 nails per shingle.
7. Apply roof shingles as per the instructions printed on each product's package. Make certain the first
course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus. In this way,
the sealant on the IKO Leading Edge Plus shingles will adhere to the first-course field shingles and
help keep them from lifting in high winds.
PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813621-5777 Fax:813-621-5840 e-mail:mate6alstesttng@pdcmt.com WeUSite:http:/AwAv.pdcmt.com