Loading...
HomeMy WebLinkAboutMisc Letters RECEIVED TMPl71iTCMAL PLUAU1M m DEC 3 0 2015 Hthere's any delay,it's you we pay... PERPA*ITnNG St. Lucie County, FL SAMUELS INVESTMENT PROPERTIES LLC 12/21/15 Re: 207 N, 39TH ST FT. PIERCE, FL. 34947 PROPOSALTO: Demo concrete for installation of new drain for laundry and kitchen. Install new 2" pvc drain line for laundry and kitchen underground. Tie intu existing drain line under floor in bathroom. Provide new recessed laundry box in wall. Dirt excavated will be left for backfill,by others. Not to include removal of concrete from premises. We will put it in owner-provided dumpster if on site. **The condition of the underground main drain is unknown. If it is too badly deteriorated, work will not proceed until additional charges are approved by owner. Replace kitchen sink and faucet after new cabinets are installed. Connect to existing plumbing. Install new white enamel on steel bathtub with code-approved pressure balanced shower valve and complete hook up. Not to include garbage disposal or dishwasher hook up. Install new 24" vanity, lavatory and faucet with complete hook up. Install new standard white-toilet.complete. Install new 40 gallon electric water heater. Kitchen sink,vanity and toilet will have new emergency shut off valves. Floor and/or wall repairs.will not be performed by Benjamin Franklin Plumbing. Demolition debris will be placed in owner-supplied dumpster on site. Condition of existing water lines is unknown until water is back on. Cost provided includes no water lines replacement. Quoted price includes labor, material, and tax for above-described work only. Permit fees to be assessed after permits have been issued and fees are known. Total cost of job, Fifteen thousand, sixty-six and 50/100's dollars.................. $15066.50 Please make payments as follows: 75%due after rough inspection. ..............$11299.88 Deposit made, 12/7/15.............................. -$7,533.25 Due after inspection.................................................................................................$3,766.63 Balance on completion.............................................................................................$3,766.62 ThaWyou for your.consideration,Tom Fanning, Service Manager Acceptance,of proposal �r�- date i 2—/-2-k 7.,1$ 1631 S.W. South Macedo Boulevard Port Saint Lucie,Florida 34984 772-871-9494 • 772-286-8841 • 561-774-2896 Facsimile• 772-871-9069 •1-866-867-5309 www.benfranklinplumbingflorida.com