Loading...
HomeMy WebLinkAboutProduct Approval RECEIVED MAR 2 8 2016 EXTERIOR RESEARCH&DESIGN,LLC. 3 RnT Certificate ofAuthorization 49503 r I PER;eiIT nt St. Lucie County, FL Christian Street TRINITY;ERD yOxford,CT 06478 PHONE:(203)262-9245 EVALUATION REPORT FAX:(203)262-9243 Polyglass USA, Inc. Evaluation Report P9290.02.08-1114 150 Lyon Drive FL1654-1116 Fernley,NV 89408 Date of Issuance:02/11/2008 SCOPE: Revision 14:06/17/2015 This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code. The product described herein has been evaluated for compliance with the 5t'Edition (2014) Florida Building Code sections noted herein. DESCRIPTION: Polyglass SBS and APP Modified Bitumen Roof Systems LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s)changes,the referenced Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. TrinitVI ERD requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT:The Evaluation Report number preceded by the words "Trinity I ERD Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety. INSPECTION: Upon request,a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 5,plus a 36-page Appendix. Prepared by: s;ttifrrp. eau T:. The facsimile seal appearing was authorized Robert J.M.Nieminen P.E. h�iF:'.....yam-�y by Robert Nieminen,P.E.an 06/17/2015 �� This does not serve as an electranically signed document.Signed, Florida Registration No.59166 Florida DCA ANE1983 "�""""' � sealed hardcoples have been transmitted to the Product Approval Administrator and to the named client CERTIFICATION OF INDEPENDENCE: 1. Exterior Research&Design,LLC.d/b/a Trinity I ERD does not have,nor does it intend to acquire or will it acquire,a financial interest in any company manufacturing or distributing products it evaluates. 2. Exterior Research & Design, LLC. d/b/a Trinity I ERD is not owned, operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the product. S. This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way,the Designer of Record for any project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained specifically for that purpose. TRINITY ,ERD Entl Examination Reference Date FM Approvals(TST1867) FM 4470/4474 3030668 09/12/2007 FM Approvals(TST1867) FM 4470/4474 3032172 06/12/2009 FM Approvals(TST1867) FM 4470/4474 3049631 04/21/2014 PRI(TST5878) Physical Properties PUSA-062-02-01 12/04/2007 PRI(TSTS878) Physical Properties PUSA-061-02-02 01/28/2008 PRI(TSTS878) Physical Properties PUSA-064-02-02 02/27/2008 PRI(TST5878) Physical Properties PUSA-062-02-02 12/04/2008 Miami-Dade(CER1592) HVHZ Compliance Various NOAs Various Miami-Dade(CER1592) Proposal for Review 10-0823 10/12/2010 UL LLC (QUA9625) Quality Control Service Confirmation,R14571 Exp.06/27/2016 4, PRODUCT DESCRIPTION: This Evaluation Report covers Polyglass Modified Bitumen Roof Systems installed in accordance with Polyglass USA,Inc.published installation instructions and the Limitations/Conditions of Use herein. The following Polyglass membranes make up the subject systems. TABLE-1 ROLL-G_OODs FORPOLYdLASS' ODIFIED BrruMENROOF SYSTEMS - Type Product Specification Reference Grade Type Polyglass G2 Base ASTM D4601 N/A II Base Sheets Polyflex SA Base ASTM D4601 N/A 11 Polyglass APP Base ASTM D6509 N/A N/A Polyglass HT Base 650 sand-backed ASTM D6162 S III Elastobase ASPM D6163 S 1 Elastoflex V ASTM D6163 S t Elastoflex SA V Base ASTM D6163,Table 2 S I Elastoflex SA V FR Base ASTM D6163,Table 2 S ! Elastoflex SA V Plus ASTM D6163 S I Elastoflex SA V Plus FR ASTM D6163 S I Elastobase Poly ASTM D6164 S I SBS Membranes Elastoflex 56 ASTM D6164 S ! Elastoflex S6 G ASTM D6164 G I Elastoflex S6 G FR ASTM D6164 G I Polyfresko G SBS(sand or poly-film backed) ASTM D6164 G I Polyfresko G SBS FR sand or poly-film backed ASTM D6164 G I Elastoshleld TS G ASTM D6164 G I Elastoshield TS G FR ASTM D6164 G 1 EiastoflexSA P ASTM D6164 G I Elastoflex SA P FR ASTM D6164 G I Polyreflect ASTM D6164 S 1 Polyflex ASTM D6222 S I Polyflex G ASTM D6222 G f Polyflex G FR ASTM D6222 G ! Polyfresko G ASTM D6222 G 1 Polyfresko G FR ASTM D6222 G I APP Membranes Pol bond ASTM D6222 S, I Polybond G ASTM D6222 G 1 Polyflex SA P ASTM D6222 G I Polyflex SA P FR ASTM D6222 G ! Polyfresko G SA ASTM D6222 G I Polykoal ASTM D6222 S I 5. LIMITATIONS: 5.1 This is a building code evaluation. Neither Trinity JERD nor Robert Nieminen,P.E.are,in anyway,the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in HVHZ. 5.3 Refer to a current Roofing Materials Directory for fire ratings of this product. Exterior Research and Design,U.C. Evaluation Report P9290.02.08-RI4 Certificate of Authorization#9503 FL1654-R16 Revision 14:06/1712015 Page 3 of 5 -Y ERD TRINII ROOFING SYSTEMS EVALUATION: 1. SCOPE: Product Category: Roofing Sub-Category: Modified Bitumen Roof Systems Compliance Statement: Polyglass SBS and APP Modified Bitumen Roof Systems, as produced by Polyglass USA, Inc., have demonstrated compliance with the following sections of the Florida Building Code through testing in accordance with the following Standards. Compliance is subject to the installation Requirements and Limitations Conditions of Use set forth herein. 2. STANDARDS: Section Property Standard Year 1504.3.1 Wind FM 4474 2004 1504.7 Impact FIVI 4470 1992 1507.11.2 Physical Properties ASTM D6162 2000 1507.11.2 Physical Properties ASTM D6163 2000 1507.11.2 Physical Properties ASTM D6164 2005 1507.11.2 Physical Properties ASTM D6222 2008 1507.11.2 Physical Properties ASTM D6509 2009 3. REFERENCES: Ent1tV Examination Reference Date ERD(TST6049) Physical Properties P10490.10.08-2 10/30/2008 ERD(TST6049) FIVI 4470/4474 P13760.09.09 09/10/2009 ERD(TST6049) I'M 4470/4474 P23770.09.09 09/10/2009 ERD(TST6049) FIVI 4470/4474 P30540.11.09-R1 11/30/2009 ERD(TST6049) FM 4470/4474 P30550.12.09 12/02/2009 ERD(TST6049) Physical Properties P33960.12.10 12/30/2010 ERD(TST6049) FIVI 4470/4474 P33970.03.11 03/15/2011 ERD(TST6049) Physical Properties P37590.03,13-3A 03/06/2013 ERD(TST6049) FM 4470/4474 P39680.03.13 03/04/2013 ERD(TST6049) Physical Properties P37590.03.13-1-RI 06/26/2013 ERD(TST6049) Physical Properties P37590.03.13-2-RI 07/01/2013 ERD(T576049) Physical Properties P37590.07.13-2 07/01/2013 ERD(TST6049) Physical Properties P37590.03.13-5-R1 07/01/2013 ERD(TST6049) Physical Properties P37590.07.13-1 07/02/2013 ERD(TST6049) FIVI 4470/4474 P41630.08.13 08/06/2013 ERD(TST6049) Physical Properties P45940.09.13 09/04/2013 ERD(TST6049) Physical Properties P44370.10.13 10/04/2013 ERD(TST6049) FIVI 4470/4474 SC6160.11.14 11/10/2014 ERD(TST6049) Physical Properties SC5170.05.15 05/08/2015 ERD(TST6049) FIVI 4474 SC8085.05.15 05/19/2015 FIVI Approvals(TST1867) FM 4470 2W7A7.AM 08/04/1994 FIVI Approvals(TST1867) FM 4470 OD3A3.AM 04/04/1997 FIVI Approvals(TST1867) FIVI 4470 2DOAO.AM 12/23/1998 FIVI Approvals(TST1867) FIVI 4470 2D5A9.AM 06/22/1999 FIVI Approvals(TST1867) FM 4470 3006646 01/04/2000 I'M Approvals(TST1867) FIVI 4470 3001334 01125/2000 FM Approvals(TST1867) FIVI 4470 3001334 02/15/2000 FIVI Approvals(TST1867) FIVI 4470 3000857 01/12/2000 FM Approvals(TST1867) FIVI 4470 3004091 01/12/2000 FM Approvals(TST1867) FIVI 4470 3006115 05/02/2001 FM Approvals(TST1867) FM 4470 3012321 07/2912002 FIVI Approvals(TST1867) FIVI 4470 3014692 09/05/2003 FM Approvals(TST1867) FIVI 4470 3014751 08/27/2003 FIVI Approvals(TST1867) FM 4470 3007170 01/13/2004 FM Approvals(TST1867) FM 4470 3019317 06/30/2004 FIVI Approvals(TST1867) FIVI 4470 3020703 07/30/2004 FIVI Approvals(TST1867) FM 447014474 3018332 01/31/2006 FIVI Approvals(TST1867) FIVI 447014474 3023368 03/20/2006 FIVI Approvals(TST1867) FM 4470/4474 3024594 05/23/2006 FIVI Approvals(TST1867) FIVI 4470/4474 3023458 07/18/2006 Exterior Research and Design,LLC. Evaluation Report P9290.02.08-RI4 Certificate of Authorization#9503 FL16%R16 Revision 14:06/17/2015 Page 2 of 5 ' — � `J. uxm�Nmu n (~~^ ~~ 5.4 For steel deck installations,foam plastic insulation shall be separated from the building interior in accordance with FBC zaoa.4unless the exceptions stated mpocxnua.4.1and zhVs.6apply. s.s The roof system evaluation herein pertains toabove-deck roof components. Roof decks and structural members shall be inaccordance with roCrequirements tnthe satisfaction ofthe AH]. Load resistance ofthe roof deck shall bedocumented through proper oodifled and/or F8[Approval documentation. 5.8 For recover installations,the existing roof shall beexamined|naccordance with FBC151O. 5.7 For mechanically attached insulation o, membrane or strip-bonded insulation, the maximum design n,eaue for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC Chapter 16. zones Z and]shall employ an attachment density designed by qualified design professional to resist the elevated nnsm,e criteria. Commonly used methods are 8pu 117 and rxx LPns 1a9. Assemblies marked with an asterisk* carry the limitations set forth/nSection 2.l.1.5'1(a)ofFyNU,Ds1,29for Zone Z/aenhancements. 5.8 For fully-adhered insulation,the maximum design pressure for the selected assembly shall meet or exceed critical design pressure determined inaccordance with FBcChapter 16. Norational analysis upermitted for these systems 5.9 For mechanically attached insulation nrmembrane over existing roof decks,fasteners shall hetested inthe existing deck for withdrawal reshtunce. A qualified design professional shall review the data for comparison to the minimum requirements for the system. Testing and analysis shall be(oaccordance with TAS xo5orANS|$PR|R+1. ' 5.10 For bonded insulation or membrane over existing substrates in a re-roof(tear off)or recover installation,the existing deck or existing roof surface shall be examined for compatibility with the adhesive to be installed. If any surface conditions exist that bring system performance into question, field uplift testing in accordance with ASTM E907, FM LPDS 1-52, ANSI/SPRI IA-1 or TAS 124 shall be conducted on mock-ups of the proposed new roof assembly. 5.11 For bonded insulation or membrane over existing substrates in a recover installation,the existing roof system shall he capable of resisting project design pressures on its own merit to the satisfaction of the AHJ,as documented through field uplift testing inaccordance with ASTM EyU7,RwU,o51,S2vrTAS 124. 5.12 Metal edge attachment(except gutters),shall be designed and installed for wind loads in accordance with FBC Chapter 16 and tested for resistance in accordance with ANSI/SPRI ES-1 or RAS 111,except the basic wind speed shall be determined from FB[Figure l6OQ. 5.13 All products in the roof assembly shall have quality assurance audit in accordance with the FBC and F.A.C.Rule 61G20-3. 6. ImsTAu/onom; 6.1 Polyglass Modified Bitumen roof systems shall be installed in accordance with Polyglass USA, Inc.published installation instructions,subject tothe Limitations/Conditions ofUse noted herein. 6.2 System attachment requirements for wind load resistance are set forth in Appendix z. ^rmop, ~ Maximum Design Pressure is the res ult of testing for wind loa d resista nce based on allowable wind loads,and ref lects the ultimate passing pressure divided by Z (the 2 t 1 margin of safety per FeC 1504.9 has already been applied). Refer to nuc 1609 for determination ofdesign wind loads. aa Any orthe following racApproved coatings may ueapplied tnthe top roof membrane without adverse effect on the system wind load performance. Refer to current Roofing Materials Directory for fire ratings associated with coating usage- > pnzoowvn-eibereaRoof Coating, * paaoomoereuRoof Coating, � rsemnon-FmereoAluminum Roof Coating, > nsemFiuereuAluminum Roof Coating; > pGmoHigh Quality u""tom°ri"Roof Coating; > psmmAsphalt Emulsion Roof Coating; > pmvplusooPremium mm*|bereuAluminum Roof Coating; > po|vv|usePremium nbemdAluminum Roof Coating; > pohbnteruPremium Grade gxuomexcRoof Coating; > Polybrite 90 High Solids Silicone Roof Coating; )�, pv|ru,meysSilicone Roof Coating. Exterior Research and Design,LLC_ Evaluation Report P9290.02.08-n14 p��s�n� ��u��Ammm�m�w�o Revision 14:06/17/2015 Page^m5 8Ni ERD 7. BUILDING PERMIT REQUIREMENTS: As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. $. MANUFACTURING PLANTS: Contactthe noted QA agencyfor information on product locations covered for F.A.C.Rule 61G20-3 OA requirements 9. QUALITY ASSURANCE ENTITY: UL LLC—QUA9625;(314)578-3406,k.chancellor@us.ul.com -THE 36-PAGES THAT FOLLOW FORM PART OF THIS EVALUATION REPORT- Exterior Research and Design,LLC. Evaluation Report P9290.02.08-R14 Certificate of Authorization#9503 FL1654-R16 Revision 14:06/17/2015 Page 5 of 5 �',..5 f! RIMY 6 ?ERD ;APPENDIR 1.-ATTACHMENT REQUIREMEMS FOR WIND UPLIFT RESISTANCE:'. Table Deck Application Type Description Page IA-1 Wood New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 4 IA-2 Wood New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 5 18 Wood New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 5 1C Wood New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 6 1D Wood New,Reroof(Tear-Off)or Recover D Prelim.Attached Insulation,Mech.Attached Base Sheet,Bonded Roof Cover 6 1E-1 Wood New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet(nails),Bonded Roof Cover 7-8 3E-2 Wood New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet(screws&plates),Bonded Roof Cover 8-9 1F Wood New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 9 2A Steel or Conc. New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 30 2B Steel or Conc. New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 11-12 2C Steel or Conc. New,Reroof(Tear-Off)or Recover D Prelim.Attached Insulation,Mech.Attached Base Sheet,Bonded Roof Cover 13-14 3A-1 Concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 15-18 3A-2 Concrete New or Reroof(Tear-Off) A-1 Bonded Temporary Roof,Bonded Insulation,Bonded Roof Cover 19-20 3B Concrete New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 21 4A LW IC New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 22-23 48 LWIC New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 24 4C LW IC New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 25-27 SA CWF New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 28 58 CWF New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 29 5C CWF New,Reroof(Tear-Off)or Recover B Mech,Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 30 SD CWF New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 30 5E CWF New,Reroof(Tear-Off)or Recover E Non-insulated,Mech.Attached Base Sheet,Bonded Roof Cover 30 6A Gypsum New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 31-32 613 Gypsum New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 33 6C Gypsum New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 33 61) Gypsum New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 33 7A Various Recover A-1 Bonded Insulation,Bonded Roof Cover 34-36 78 Various Recover F Non-Insulated,Bonded Base Sheet,Bonded Roof Cover 36 The following notes apply to the systems outlined herein: 1. The roof system evaluation herein pertains to above-deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the AHI. Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. 2. Insulation/base sheet fasteners shall be of sufficient length for the following deck engagement: Y Wood: Minimum 0.75-Inch penetration, >Steel: Minimum 0.75-inch penetration and engage the top flute of the steel deck. >Concrete: Minimum 1-Inch embedment into pilot hole in accordance with fastener manufacturer's published installation Instructions, 3. Unless otherwise noted, insulation may be any one layer or combination of polyisocyanurate, polystyrene, wood fiberboard, perlite, gypsum-based roof board or mineral-wool roof board that meets the CIA requirements of F.A.C.Rule 61620-3 and is documented as meeting FBC 1505.1 and,for foam plastic,FBC Chapter 26,when installed with the roof cover. Exterior Research and Design,LLC.d/b/a Trinity)ERD Evaluation Report P9290.02.08-R14 for FL1654-R16 Certificate of Authorization#9503 Revision 14:06/17/2015 Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 1 of 36 iERD TRINITY 4. Minimum 200 psi,minimum 2-inch thick lightweight insulating concrete may be substituted for rigid Insulation board for System Type D(mechanically attached base sheet,bonded roof cover),whereby the base sheet fasteners are installed through the LWIC to engage the structural steel or concrete deck. The structural deck shall be of equ al or greater configuration to the steel and concrete deck listings. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the AHJ. Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. 5. Unless otherwise noted,Insulation adhesive application rates are as follows. Ribbon or bead width is at the time of application,the ribbons/beads shall expand as noted in the manufacturer's published Instructions. HA(HA): Full coverage at 25.30 lbs/square. > Dow Insta-StIk Roofing Adhesive(D-IS): Continuous 0.75 to 1-inch wide ribbons,12-inch o.c. > Millennium One Step Foarnable Adhesive(i\4-OSFA): Continuous 0.25 to 0.5-inch wide ribbons,12-Inch o.c. >OMG OlyBond 500(08500): Continuous 0.75 to 1-inch wide ribbons, 12-inch o.c. (PaceCart or SpotShot). Note: OlyBond Green may be used where OlyBond 500 is referenced. > OlyBond Classic(OB Classic): Full coverage at I gal/square. 3M CR-20: Continuous 2.5-3.5-inch wide ribbons,12-Inch o.c. >Note: When multiple layers(s)of insulation andlor coverboard are installed in ribbon-applied adhesive,adhesive ribbons shall be staggered from layer-to-layer a distance of one-half the ribbon spacing. >Note: The maximum edge distance from the adhesive ribbon to the edge of the insulation board shall be not less than one-half the specified ribbons spacing. 6. Unless otherwise noted,all insulations are flat stock or taper board of the minimum thickness noted. Tapered polyisocyanurate at the following thickness limitations may be substituted with the following maximum Design Pressure(MDP)limitations. In no case shall these values be used to'Increase'the MOP listings in the tables;rather if MOP listing below meets or exceeds that listed for a particular system in the tables,then the thinner board listed below may be used as a drop-in for the equivalent thicker material listed in the table: �Millennium one Step Foamable Adhesive(M-OSFA); MDP -157.5 psf (Min.0.5-inch thick) >OMG OlyBond 500(OB500): MOP -45.0 psf (Min.0.5-inch thick Multi-Max FA-3) > OMG OlyBond 500(OB500)i MDP -187.5 psf (Min.0.5-inch thick ISO 95+GQ > OMG OlyBond 500(08500); MDP -315.0 psf (Min.0.5-Inch thick ENRGY 3) >OMG OlyBond 500(OB500): MDP -487.5 psf (Min.0.5-inch thick ACFoam 11) r 3M CR-20: MDP -117.5 psf (Min.1.0-inch thick) 7. Bonded polyisocyanurate Insulation boards shall be maximum 4 x4 ft. a. For mechanically attached components or partially bonded Insulation,the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined In accordance with FBC Chapter 16,and Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are RAS 117 and FM LPDS 1-29. Assemblies marked with an asterisk*carry the limitations set forth in Section 2,2,1.5.1(a)of FM LPDS 1-29 for Zone 2/3 enhancements. 9. For fully bonded assemblies,the maximum design pressure for the selected assembly shall meet or exceed critical design pressure determined in accordance with FBC Chapter 16,and no rational analysis is permitted. 10. For mechanically attached components over existing decks,fasteners shall be tested in the existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison to the minimum requirements for the system. Testing and analysis shall be in accordance with TAS 105 or ANSI/SPRI FX-1. 11. For existing substrates in a bonded recover Installation,the existing roof system shall be examined for compatibility and bond performance with the selected adhesive,and the existing roof system shall be capable of resisting project design pressures on its own merit to the satisfaction of the AHJ,as documented through field uplift testi ng In accordance with ASTM E907,FM LPDS 1-52,ANSI/SPRI IA-1 or TAS 124. 12. For Recover Applications using System Type D,the Insulation is optional;however,the existing roof system shall be suitable for a recover application. 13. LWIC shall be cast In accordance with FBC Section 1917 to the satisfaction of the Authority Having Jurisdiction. For systems where specific LWIC is referenced,refer to current LWIC Product Approval for specific deck construction and limitations. For systems where specific LWIC is not referenced,the minimum design mix shall be 300 psi. In all cases,the minimum top-coat thickness is 2-inches. For LWIC over structural concrete, reference is made to FBC Section 1917.4.1,Point 1. ExteriorResearch and Design,LLC d/b/a Trinity I ERD Evaluation Report P9290.02.08-1114 for F1.1654-1116 Certificate of Authorization#9503 Revision 14:06/17/2015 Prepared by: Robert Nlemlnen,PE-59166 Appendix 1,Page 2 of 36 INW�Ib 4C.✓ 14, Unless otherwise noted,refer to the following references for bonded base,ply or cap sheet applications. TABLE 2 POLYGLAS5 ROOF COVERS Reference Layer Material Application BP-AA Base Polyglass G2 Base,FBC Approved ASTM D4601,Type 11 HA at 20-40 lbs/square (Base and Ply sheets,Asphalt-Applied) Ply Polyglass Pty IV,Polyglass Ply Vi,FBC Approved ASTM D2178,Type IV or VI Base or Ply Elastobase,Elastobase Poly,Elastoflex V,Elastoflex S6,Polyglass HT Base 650 SBS-AAHA at 20-40 lbs/square (SBS,Asphalt-Applied) Cap Elastoflex S6,Elastoflex 56 G, Elastoflex S6 G FR, Elastoshield TS-G, Elastoshield TS-G FR,Polyfresko G SBS {sand-backed}, Polyfresko G SBS FR(sand-backed) Base or Ply Elastoflex V,Elastoflex S6 SBS-TA Torch-Applied {SBS,Torch-Applied) Cap Elastoflex V,Elastoflex S6,Elastoflex S6 G,Elastoflex 55 G FR,Elastoshield TS-G,Elastoshield TS-G FR,Polyfresko G SBS(poly- film backed),Polyfresko G SBS FR(poly-film backed) SBS-SA Base Elastoflex SA V Base,Elastoflex SA V FR Base,Elastoflex SA V Plus,Elastoflex SA V Plus FR Self-Adhering (SBS,Self-Adhering) Cap Elastoflex SA P,Elastoflex SA P FR,Polyreflect APP-TA Base or Ply Polyglass APP Base,Polyflex,Polybond Torch-Applied (APP,Torch-Applied) Cap Polyflex,Polyflex G,Polyflex G FR,Polybond,Polybond G,Polyfresko G,Polyfresko G FR APP-SA Cap Polyflex SA P,Polyflex SA P FR,Polyfresko G SA,Polykooi Self-Adhering (APP,Self-Adhering) 15. Any of the following FBC Approved coatings may be applied to the top roof membrane without adverse effect on the system wind load performance. Refer to current Roofing Materials Directory for fire ratings associated with coating usage. PG200 Non Fibered Roof Coating; PG300 Fibered Roof Coating; PG600 Nan-Fibered Aluminum Roof Coating; 7 PGG50 Fibered Aluminum Roof Coating; > PG700 High Quality Elastomeric Roof Coating; > PG800 Asphalt Emulsion Roof Coating; > Polyplus 60 Premium Non-Fibered Aluminum Roof Coating; ➢ Polypius 65 Premium Fibeted Aluminum Roof Coating; i Polybrite 70 Premium Grade Elastomeric Roof Coating; Y Polybrite 90 High Solids Silicone Roof Coating or Polybrite 95 Silicone Roof Coating. 16, The following represent priming requirements for gypsum-based coverboards; L Dens Deck and Dens Deck Prime shall be field-primed with PG100 prior to self-adhering or torch-applied membrane application. No priming Is required for hot-asphalt membrane applications. Y SECU ROCK Gypsum-Fiber Roof Board does not require field priming for any membrane application. 17. "MDP"=Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads,Refer to FBC 1609 for determination of design wind loads. Exterior Research and Design,U.C.d/b/a Trinity[ERD Evaluation Report 119290.02.08-1114 for FL1654-R16 Certificate of Authorization 49503 Revision 14:06/17/2015 Prepared by; Robert Nieminen,PE-59166 Appendix 1,Page 3 of 36 4, `i RINrrY. ERR TABLE 1E-2:WOOD DECKS—NEW CONSTRUCTION,REROOF(TEAR-OFF)ORRECOVER SYSTEM TYPE E: NON-INSULATED,MECHANICALLYATTACHED BASE SHEET(-,CREWS&PLATES),BONDED ROOF COVER System peck(See Base Sheet Roof Cover MDP{psf) No. Note 1) Base Fasten Attach Ply Cap OMG#12 Standard Roofgrip or OMG#14 Heavy W-43 Min.plywood Poiyglass APP Base Duty(min.1-5/8-inch long)with OMG 3"Round Chinch equally at 4-inch lap and 6-inch ceo.cnter r (Optional)APP-TA APP-TA -90.0 inch plywood Metal Plates or OMG Flat Bottom Metal Plates three,equally spaced,staggered center rows OMG#12 Standard Roofgrip or OMG#14 Heavy 6-inch o,c.at 4-inch lap and 6-inch o.c.in (Optional)BP-AA,SBS-AA, SBS-AA,SBS-TA W-44 Min.15/32- Elastobase(with sand top surface) Duty(min.1-5/8-inch long)with OMG 3"Round -90.0 inch plywood Meta!Plates or OMG Flat Bottom Metal Plates three,equally spaced,staggered center rows SBS-TA or APP-TA or APP-TA W-45 Min.15/32- Elastobase(with sand top surface) Trufast#12 DP or Trufast#14 HO(min.1-5/8-inch 6-inch o.c.at 4-inch lap and 6-inch o.c.in (Optional)BP-AA or SBS-AA SBS-AA -90.0 inch plywood long)with Trufast 3"Metal Insulation Plates three,equally spaced,staggered center rows Min.15/32- OMG#12 Standard Roofgrip or OMG#14 Heavy 6 Bch o.c.at 4-inch lap and 6-inch o.c.in five,W-46 inch plywood Polyglass APP Base Duty(min.2-5/8-inch long)with OMG r Round equally spaced,staggered center rows (Optional)APP-TA APP-TA -120.0 Metal Plates or OMG Flat Bottom Metal Plates Min.15/32- OMG#12 Standard Roofgrip or OMG#14 Heavy 6-inch o.c.at 4-inch tap and 6-inch o.c.in five, (Optional)BP-AA,SBS-AA, SBS-AA,SBS-TA W-47 inch plywood Elastobase(with sand top surface) Duty(min.1-5/8-inch long)with OMG 3"Round equally spaced,staggered center rows SBS-TA or APP-TA or APP-TA -120.0 Metal Plates or OMG Flat Bottom Metal Plates W-48 Min,15/32- Elastobase(with sand top surface) Trufast#12 DP or Trufast#14 HD(min.1-5/8-inch 6-inch o.c.at 4-inch tap and 6-inch o.c,in five, (Optional)BP-AA or SBS-AA SBS-AA -120.0 Inch plywood long)with Trufast 3"Metal Insulation Plates equally spaced,staggered center rows TABLE 1F:WOOD DECKS—NEW CONSTRUCTION OR REROOF(TEAR-OFF) SYSTEM TYPE F.NON-INSULATED,BONDED ROOF COVER System Deck(See MDP Roof Cover s Primer JoFntTreatment Base Pty Cap (pso Mm 15/32- (Optional)SBS-SA,SBS SSS-SA,APP-SA,SBS. VJ 49 (OptionalPG100 a SBS-SA 90:0 inch plywood ) TA,APP-TA TA;APP-TA PG100 None Polyflex SA Base (Optional)One or more APP-TA -90.0 Inch plywood Pt onal) APP TA Min.15/32- Plywood joints are covered with 4-inch wide strips of Elastoflex SA V Plus,rolled into Elastoflex SA V Base or (Optional)SBS-SA,SBS- S8S-SA,APF-SA,SBS- -97.5 W-51 inch plywood (Optional)PG100 place to create continuous bond. Elastoflex SA V FR Base TA,APP-TA TA,APP-TA Min.15/32- Plywood joints are covered with 4-inch wide strips of Elastoflex SA V Plus,rolled into Elastoflex SA V Plus or (Optional)SBS-SA,SBS- SBS-SA,APP-SA,SBS- -135.0 W-52 inch plywood (Optional)PG100 place to create continuous bond. Elastoflex SA VPlus FR TA,APP-TA TA,APP-TA W-53 Min,15/32- (Optional)PG100 Plywood joints are covered with 4-inch wide strips of Elastoflex SA V Plus,roiled into Polyflex SA Base (Optional)One or more App-TA -135.0 inch plywood place to create continuous bond. APP-TA Exterior Research and Design,LLC.d/b/a Trinity)ERD Evaluation Report P9290.02.08-1114 for F1.1654-1116 Certificate of Authorization#9503 Revision 14:06/17/2015 Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 9 of 36