Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Engineering
Identification Schedule for Opening Protective Device or System PERr2APR 2�i 1 16 1 201 201 ING (The following mininrunr information shall be provided to facilitate plan reviemi and inspection of the proposed installation, opening,protective device 9COWC:o unty, FL Address:_ 2117 NW Greenbriar Lane, Palm City, F134990 Type of Structure: PERMIT#: Dev. Device Device ApprovalOpening Opening Shutter Shutter #Storni Anchor Header # Type Manufacturer Width Height Width Height Bars Req. Spacing Reinf.Req 1. Accordian ASSA FBC 81 93 81 93 9 No 2. Accordian ASSA FBC 139 93 153.75 93 9 No 3. Accordian ASSA FBC 139 93 153.75 93 9 No 4. Accordian ASSA FBC 112 72 124.5 72 9 No 5. Accordian ASSA FBC 44 72 53 72 9 No 6. Accordian ASSA FBC 46 72 53 72 9 No 7. Accordian ASSA FBC 45 72 53 72 9 No 8. Accordian ASSA FBC 28 72 33.5 72 9 No 9. Accordian ASSA FBC 76 90 85.5 90 9 No 10. Accordian ASSA FBC 28 72 33.5 72 9 No 11. Accordian ASSA FBC 64 60 64 66 9 No 12. Accordian ASSA FBC 64 60 64 66 9 No 13. Accordian ASSA FBC 34 62 34 62 9 No 14. Accordian ASSA FBC 48 24 56.25 24 9 No 15. Accordian ASSA FBC 39 72 46.5 72 9 No 16. Accordian ASSA FBC 39 72 46.5 72 9 No 17. Accordian ASSA FBC 30 72 36.75 72 9 No 18. Accordian ASSA FBC 30 72 36.75 72 9 No Ope�timg 1 ;BertharHi9 Velocity Accordion {BACK SLIDER)., 2 Bertha High Velocity Accordion rr + ' (BACK SLIDER) 3 Bertha,High Velo`cityAccordion (BACK SUE E 4 ?Bertha High Velocity Accordi'h ;`(BACK w)NDow) ' I 5 Bertha.High Velocity Accordion 4 3 2 °(BACK,WINDOWrs) 1 6 Bertha High Vetocity Accordion t �� 7'�Bertha High Velocity Accordion (front lett)` -3 5 18 8 Berfha High Velocity Accordion (pont) 9 ,Bertha KV Accordion (coni door) 17 10-?Bertha,HighVelocityAccoriion '' '(frons) 11 Bertha High Velocity Accordion, 6 (front court yard) 12 ',Bertha High Velocity Accordion 16 (from court yard) 8 9 10 13 ,;Bertha,High Velocity Accordion (front ng,'t 14>>Bertha HighVelocity Accordion 16 (right'side) 11 15 'Bertha High Velocity Accordion (nght side) 16'"'Be'Bertha HigVelocity Accordion it (nght side) 12 14 17 Bertha Hi h Velocit Accordion (nght side)g y 7 13 L J 0 18 ;Berfha High Velocity Accordion fnght s�de1 'L � G1 (� Vcc _I •M C LL Z cm n- „� N � L� �) a . , L B SCAIB CL IGNT E-TEMPE6T.CAM + , } NOT TO SCALE �� DATE: + �{ Apr 19,2016 fPAGE DESCRIPTION: Site Plan PAGE: OF 1 i ACE ilURRiCAN1 .S t1TTERs-. .INC. PANELS •ACCORDIONS.:- BAHAMAS,' GQLQNlALS • ROLL 11PS _ Property Information Building Information Owner: Davies Tainter Wind Zone: 170 MPH. Address: 2117 NW Greenbriar Lane Exposure Category: B Palm City,Fl 34990 Minimum Building Dimension: 5 ft. Mean Roof Height: 15 ft. it Risk Category: II F Design Pressure Calculations Opening Location Device Device Device Max Positive Max Negative Number Zone Width(in) Height(in) Elevation(ft) Pressure(psf) Pressure(psf) 1 11::: I Int 81 93 7 25.5 -27.9 _.._ ---- - - _._. -._. -- - --- _. . .._.. - --- -.._._.--------- 2 Int 153.75 93 7 24.3 26.7 - - - - --- - ----- ------- ---- - ------------- ------- -- - -- -- - --- ---------- 3 Int 153.75 93 7 24.3 -26.7 -- -- - .._..--- - ----- .. --------- 4 Int 124.5 72 7 25.2 -27.6 -------_... ----- 5 Int 53 72 7 26.7 -29.1 --- - ---------- 6 -- -6 Int 53 72 7 26.7 29.1 7 Int 53 72 7 26.7 -29.1 8 Int 33.5 72 7 27.6 30.0 9 Int 85.5 90 7 25.5 -27.8 - - - --- -- - - - - --- - --------------------------------------------------- ------ ___._._ -- - ---- - -- - -... - --------------------- 10 Int 33.5 72 7 27.6 -30.0 11 Int 64 66 7 26.6 -28.9 -- ----- ---.. ---. - --- -------------- .----------------------------- - --._.. -- - ------._..... --._...- - - ........._ --------------_........------- 12 Int 64 66 7 26.6 -28.9 13 Int 34 62 7 27.8 -30.2 14 Int 56.25 24 7 28.5 -30.9 15 Int 46.5 72 7 27.0 -29.4 16 Int 46.5 72 7 27.0 -29.4 -- -- ------------------------------------------------------------- ----- --------------------- ------------------------ ---- ---- 17 Int 36.75 72 7 27.4 -29.8 - -- - --- -- -- ._...- -- ------------..... - ----- --- - -- - --- - - - -- --- - - ---- _------------.-....-- -- 18 Int 36.75 72 7 27.4 -29.8 (7,C-:fVE[)I APR 2 12016 PEFtf&I Tfi,1C St. Lucie County, FL Prepared in accordance with:ASCE 7-10,Chapter 30.6Vind Loads-Components and Cladding.5th Edition(2014)Florida Building Code. Page 1 of 1