Loading...
HomeMy WebLinkAboutInspection Docs 6c) Q0 � Planning &Development Services G* Building&Code Regulation Division • 2300 Virginia Ave • Fort Pierce,FL 34932 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT 2(59 PERMIT #: rksK JOB ADDRESS: n Ritbor BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR: hfxilo I S I►')cu x1 elw'1,TAc. PEST CONTROL LICENSE #: Ij'C)5g31 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if'area treated: lao Chemicals used: pomiylay�L Percentage of solution: 0105 Total gallons used: otC/ Date of Treatment: 0,5 �oci ho(6 Time of Treatment: Footing Slab 1't Treatment 1st Treatment Re-Treat Re-Treat Driveway Pools 1st Treatment 1st Treatment Re-Treat Re-Treat Other W hese d r;yG E!w m e c l's Perimeter for Final Inspection INC. 1st Treatment I vlwus— Re-Treat 116, Signature of Exterminator Date (Vote: There must be a completed form for each required treatment or re-treatment and this form must be on the job site to be picked up by the inspector at time of each Inspection or the scheduled inspection will fail and a re-inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit fl/es The Treatment Certificate shall provide the product used,identity of the applicator, time and date of the treatment,site location, area treated,chemical used,percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used,final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014