HomeMy WebLinkAboutProduct Approval (2) RECEP,`-D JUN 13 2016
CopXL Ar EXTERIOR RESEARCH&DESIGN,LLC.
y Certificate of Authorization#9503
STREETUNIT#13
TRII-ff ERD 353 CHRISTIAN OXFORD,,CT 06478
N
PHONE:(203)262-9245
FAX:(203)262-9243
EVALUATION REPORT
Allied Building Products Corp. Evaluation Report A42960.10.12-R3
dba TRI-BUILT Roofing Products FL16048-R3
9050 Louisiana Street Date of issuance:10/25/2012
Merrillville,IN 46410 Revision 3: 10/08/2015
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nleminen,
P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The
products described herein have been evaluated for compliance with the 5th Edition (2014) Florida Building Code
sections noted herein.
DESCRIPTION: TRI-BUILT Roof Underlayments
LABELING: Labeling shall be In accordance with the requirements the Accredited Quality Assurance Agency noted
herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s)changes,the referenced
Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of
this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. If the product
changes or the referenced Quality Assurance documentation changes. Trinityl ERD requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT:The Evaluation Report number preceded by the words "Trinity l ERD Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed,then It shall be done in Its entirety.
INSPECTION:Upon request,a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages I through 5.
Prepared by:
.............................—
STA,..........
it,
Robert J.M.Nlemlnen,P.E. ai WThe facsimile seal appearing was authorized by Robert Nleminen,
VN0 a 4 i I t%0 P.E.on 10/08/2015.This does not serve as an electronically signed
Florida Registration No.59166,Florida DCA ANE1983 document Signed,seated hardcoples have been transmitted to the
Product Approval Administrator and to the named client
CERTIFICATION OF INDEPENDENCE:
1. TrinitylERD does not have, nor does It intend to acquire or will it acquire, a financial Interest in any company manufacturing or
distributing products It evaluates.
2. Trinity I ERD Is not owned,operated or controlled by any company manufacturing or distributing products It evaluates.
3. Robert Nleminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nlemlnen,P.E.does not have, nor will acquire,a financial Interest In any other entity Involved in the approval process of the
product.
5. This Is a building code evaluation. Neither Trinity I ERD nor Robert Nlemlnen, P.E. are,in any way,the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,Is/was used for permitting or design guidance unless retained
specifically for that purpose.
TRIi JW ERI®
5.4 TRI-BUILT Roof Underlayments may be used with any prepared roof cover where the product is specifically
referenced within FBC approval documents. If not listed, a request may be made to the AHJ for approval
based on this evaluation combined with supporting data for the prepared roof covering.
5.5 Allowable roof covers applied atop the underlayments are as follows:
TABLE 1: ROOF COVER OPTIONS
Underlayment Asphalt Nall-On Tile Foam-On Tile Metal Wood Shakes Slate
Shingles &Shingles
Tri-Built Sand-R SA Shingle Yes No No No Yes Yes
Underlayment
Tri-Built S/A HT TU Yes Yes Yes Yes Yes Yes
Underlayment See 5.5.1
Trl-Built Smooth HT S/A Yes No No Yes Yes Yes
Underlayment
5.5.1 "Foam-On Tile" is limited to use of the following Approved tile adhesives unless tensile adhesion / long
term aging data from an accredited testing laboratory is provided.
Y Tri-Built S/A HT TU Underlayment with 3M"'2-Component Roof Tile Adhesive AH-160(FL6332)or Dow
TileBond'm Roof Tile Adhesive(FL717)
5.6 Allowable substrates are noted below:
5.6.1 Direct-Bond to Deck:
Tri-Built Sand-R SA Shingle Underlayment, Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment applied to:
Y Plywood; ASTM D41 primed plywood; OSB; ASTM D41 primed OSB; ASTM D41 primed structural
concrete.
While not required over plywood,OSB or Southern Yellow Pine substrates,TRI-BUILT recommends priming
the deck if the final roof cover is not slated for installation within 24 hours. Note: TRI-BUILT requires
tongue-and-groove board decking be covered with plywood or OSB prior to installation of the self-
adhering underlayment.
5.6.2 Bond-to-Insulation:
Tri-Built S/A HT TU Underlayment applied to:
r Dens Deck Prime;SECU ROCK Gypsum-Fiber Roof Board.
For installation under mechanically attached prepared roof coverings, insulation shall be attached per
minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations
under foam-on tile systems,insulation attachment shall be designed by a qualified design professional and
installed based on testing of the insulation/underlayment system in accordance with FM 4474,Appendix D
or TAS 114,Appendix J.
5.6.3 Bond to Mechanically Attached Base Laver:
r ASTM D226,Type I or II felt.
For installations under mechanically attached prepared roof coverings, base layer shall be attached per
minimum codified requirements. For installations under foam-on tile systems,base layer shall be attached
per minimum requirements of FRSA/TRI April 2012(04-12).
Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-113
Certificate of Authorization#9503 F1.36048-113
Revision 3:10/08/2015
Page 3 of 5
TRINITY ERD
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of
this product.
S. MANUFACTURING PLANTS:
Contact the noted QA agency for information on product locations covered for F.A.C.Rule 9N-3 QA requirements.
9. QUALITY ASSURANCE ENTITY:
UL,LLC—QUA9625;{314}578-3406;k.chancellor@us.ui.com
-END OF EVALUATION REPORT-
Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-R3
CertiJleate ofAuthorleatlon#9503 FL16048-R3
Revision 3:10/08/2015
Page 5 of 5