HomeMy WebLinkAboutProduct Approval (2) Florida Building Code Online Page 1 of 2
UFCjd
DepyqpqntCn BCIS Home Log In User Registration % Hot Topics Submit Surcharge Stats&Facts I Publications FBC Staff BCIS Site Map Links i Search
Busines u)
Professibbrral ° Product.Approval
Regulation
Product Approval Menu> du �4ffn sellim . st>Application Detail
FL# FL16048-113
Application Type Revision
Code Version 2014
Application Status Approved
Comments
Archived h3
Product Manufacturer TRI-BUILT Roofing Products
Address/Phone/Email 9050 Louisiana Street
Merrillville,IN 46410
(201) 842-2449
david.ruiz@tribuiltmaterialsgroup.com
Authorized Signature David Ruiz
david.ruiz@tribuiltmateriaisgroup.com
Technical Representative David Ruiz
Address/Phone/Email 250 Route 17 North
East Rutherford,NJ 07073
(201)842-2449
david.ruiz@tribuiltmaterialsgroup.com
Quality Assurance Representative
Address/Phone/Email
Category Roofing
Subcategory Underlayments -
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida
Professional Engineer
i Evaluation Report-Hardcopy Received
Florida Engineer or Architect Name who developed the Robert Nieminen
Evaluation Report
Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Contract Expiration Date 10/16/2017
Validated By John W. Knezevich,PE
Validation Checklist-Hardcopy Received
Certificate of Independence FL16048 R3 COI 2015 01 COI Nieminen.pdf
Referenced Standard and Year(of Standard) Standard Year
ASTM D1970 2009
ASTM G155 2005
FRSA/TRI April 2012(04-12) 2012
TAS 103 1995
Equivalence of Product Standards
Certified By
Sections from the Code
http://www.floridabuilding.org/pr/pr app_dtl.aspx?param=wGEVXQwtDgtFPmdYiNDWrwipmtAnR8jv... 5/13/2016
Florida Building Code Online Page 2 of 2
<: Product Approval Method Method 1 Option D
Date Submitted 10/08/2015
Date Validated 10/19/2015
Date Pending FBC Approval 10/21/2015
Date Approved 12/15/2015
gu ary of Products
FL# - _.- .;_--.. ry „ .Model,Number or Name Descrlpt!onw_:
16048.1 TRI-BUILT Roof Underlayments Self-adhering,modified bitumen roof underlayments
Limits of Use Installation Instructions
Approved for use in HVHZ: No FL16048 R3 11 2015 10 FINAL ER TRI-
Approved for use outside HVHZ:Yes BUILT UNDERLAYMENTS FL16048-R3.pdf
Impact Resistant: N/A Verified By: Robert Nieminen PE-59166
Design Pressure:+N/A/-45 Created by Independent Third Party:Yes
Other: 1.)The design pressure noted herein pertains to use of Evaluation Reports
foam-on the systems overtop the self-adhering underlayment for FL16048 R3 AE 2015 10 FINAL ER TRI-
one particular application. See ER Section 5.6 for details.2.) Refer BUILT UNDERLAYMENTS FL16048-R3.pdf
to ER Section 5 for other Limits of Use. Created by Independent Third Party:Yes
Contact Us::1940 North Monroe Street,Tallahassee FL 32399 Phone,850-487-1824
.•= The State of Florida is an AA/EEO employer.Cooyriaht 2007-2013 State of Florida.::Privacy Statement::Accessibility Statement::Refund Statement
Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic mail to this
• entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.*Pursuant to Section 455.275(1),Florida Statutes,
` = effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have one.The emails provided may be used for
official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,please provide the Department with an email
address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S.,please click here.
- Product Approval Accepts:
.. 1 Al•ecl e .
t-'�i sc�ztrilvsutrrcrCs`
�X
http://www.floridabuilding.org[pr/pr app dtl.aspx?param=wGEVXQwtDgtFPmdY NDWrwipmtAnR8jv... 5/13/2016
EXTERIOR RESEARCH gc DESIGN,LLC.
Certificate of Authorization#9503
K 353 CHRISTIAN STREET,UNIT#13
. fi
•-' OXFORD,CT 06478
PHONE: (203)262-9245
FAX:(203)262-9243
EVALUATION REPORT
Allied Building Products Corp. I)I Evaluation Report A42960.10,12-R3
dba TRI-BUILT Roofing Products I FL16048-113
9050 Louisiana Street Date of Issuance:10/2512012
Merrillville,IN 46410 Revision 3: 10/08/2015
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida_The documentation submitted has been reviewed by.Robert Nieminen,
P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The
products described herein have been evaluated for compliance with the 5u' Edition (2014) Florida Building Code
sections noted herein. j
l
DESCRIPTION: TRI-BUILT Roof Underlayments I
t
LABELING: Labeling shall be in accordance with the requirements,1 the Accredited Quality Assurance Agency noted
herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes,the referenced
Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of
this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product
changes or the referenced Quality Assurance documentation changes. Trinity)ERD requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle.
ADvER-nsEmEN;:The Evaluation Report number preceded by the words"Trinity{ERD Evaluated" may be displayed in
advertising literature. if any portion of the Evaluation Report is displayed,then it shall be done in its entirety.
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages 1 through 5.
Prepared by: ``4txyt.t�irrrra.y_
RobertJ.11/1.Nieminen P.E. .; .•" =,4 The facsimile seal appearing ivasauthorized byRobert Weminen,
^l'14........", P-E.on 1410&{20+5.This does not serve as an e!ectrontcally sigced
Florida Registration No.59166,Florida DCAANE1983 document.Signed,sealed hardcopieshavebeen transmitted to the
Product Approval Administrator and to the narned client
CUMFICATION OF INDEPENDENCE:
1. TrinitylERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. Trinity ERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E.are, in any way,the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained
specifically for that purpose.
x,. p NL
Rooir-NG COMPONENT EVAwmiom
1. SCOPE:
Product Category: Roofing
Sub-Category: Underlayment
Compliance Statement: TRI-BUILT Roof Underlayments,as produced by TRI-BUILT, have demonstrated compliance
with the following sections of the Florida Building Code through=testing in accordance with the following Standards.
Compliance is subject to the Installation Requirements and Limitations/Conditions of Use set forth herein.
2. STANDARDS:
Section Property Standard Year
1507.2.4,1507.2.8,1507.2.9.2, Physical Properties ASTM D1970 2000
1507.4.5.1,1507.5.3,1507.7.3
1504.6 Accelerated Weathering ASTM G155 2005
1507.3.3 Installation Practice FRSA/TRI April 2012(04-12) 2012
1523.6.5.2.1 Physical Properties TAS 103 1995
3. REFEREivCES:
Ent Examination Reference Date
ERD(TST6049) Physical Properties S40540.02.13-1 02/19/2013
ERD(TST6049) Physical Properties 540540.11.13 11/19/2013
ERD(TST6049) Physical Properties 540540.03.14 03/26/2014
ERD(TST6049) Physical Properties 544870.04.14-2 04/02/2014
ERD(TST6049) Physical Properties 544870.04.143 04/02/2014
ERD(TST6049) Physical Properties S44870.04.14-1 04/10/2014
ERD(TST6049) Physical Properties S44870.04.14-4 04/10/2014
ERD(TST6049) Physical Properties 543530.02.14-1-RI 05/14/2014
ERD(TST6049) Physical Properties 543530.05.14 05/28/2014
ERD tTSr6049) Physical Properties 540540.10.14 10/31/2014
ERD(TST6049) Physical Properties SC7645.02.15 02/13/2015
ERD(TSTGN9) Accelerated Weathering SC8520.04.15 05/27/2015
UL,LLC.(QUA9625) Quality Control Multiple-Listing R16814 09/04/2015
UL.LLC.(QUA9625) Quality Control Service Confirmation Exp.10/16/2017
4. PRODUCT DESCRIPTION:
4.1 Self-Adhering Underlayments:
4.1.1 Tri-Built Sand-R SA Shingle Underlayment is a self-adhering, glass-mat reinforced, sand-surfaced, SBS
modified bitumen roof underiayment,with a 36-inch sheet width.
4.1.2 Tri-Built S/A HT TV Underlayment is a self-adhering, non-woven polyester fabric surfaced, 585 modified
bitumen roof underiayment
4.1.3 Tri-Built Smooth ViT SIA Underlayment is a self-adhering,glass-mat reinforced,film-surfaced,SSS modified
bitumen roof underiayment.
5. LIMITATIONS:
5.1 This is a building code evaluation. Neither Trinity(ERD nor Robert Nieminen, P.E. are, in any way, the
Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was
used for permitting or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in the HVHZ.
5.3 Eire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials
Directory for fire ratings of this product.
Exterior Research and Design,LLC. Evaluation Report A42960.10.12-113
Certificate afAutharization#9503 FL16048-R3
Revision 3:10/08f2015
Page 2 of 5
5.4 TRI-BUILT Roof Underlayments may be used with any F repared roof cover where the product is specifically
referenced within FBC approval documents. If not list{ d,a request may be made to.the AH1 for approval
based on this evaluation combined with supporting data for the prepared roof covering.
5.5 Allowable roof covers applied atop the underlayments�re as follows:
TABU Z: Ro0F CovERPp noNS
Underlayment Asphalt Nail-On Tile Foam iOn Tile Metal Wood Shakes Slate
Shingles I &Shingles
Tri-Built Sand-R SA Shingle Yes No No No Yes Yes
Underlayment
Tri-Built S/A HT TU Yes
Underlayment Yes Yes See 5.5.1 Yes Yes Yes
Tri-Built Smooth HT S/A Yes No No Yes Yes Yes
Underlayment
5.5.1 "Foam-Ors Tile' is limited to use of the following Approved file adhesives unless tensile adhesion / long
term aging data from an accredited testing laboratory is provided.
Tri-Suitt S/A HT TU Underlayment with 3M12-Component Roof Tile Adhesive AH-160(FL6332)or Dow
TileBondn11 Roof Tile Adhesive(FL717)
5.6 Allowable substrates are noted below:
5.6.1 Direct-Bond to Deck:
Tri-Built Sand-R SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment applied to:
`r Plywood; ASTM D41 primed plywood; OSB; ASTM D41 primed OSB; ASTM D41 primed structural
concrete.
While not required over plywood,OSB or Southern Yellow Pine substrates,TRI-BUILT recommends priming
the deck if the final roof cover is not slated for installation within 24 hours. Note: TRI-BUILT requires
tongue-and-groove board decking be covered with plywood or OSB prior to installation of the self-
adhering underlayment.
5,6.2 Bond-to-Insulation:
Tri-Built SJR HT TU Underlayment applied to:
`r Dens Deck Prime;SECUROCK Gypsum-Fiber Roof Board..
For installation under mechanically attached prepared roof coverings, insulation shall be attached per
minimum requirements of the-'prepared roof covering manufacturer's Product Approval. For installations
under foam-on the systems,insulation attachment shall be designed by a qualified design professional and
installed based on testing of the insulation/underlayment system in accordance with FM 4474,Appendix D
or TAS 114,Appendix 1.
5.6.3 Bond to Mechanically Attached Base Layer:
> ASTM D226,Type I or 11 felt.
For installations under mechanically attached prepared roof coverings, base layer shall be attached per
minimum codified requirements. For installations under foam-on the systems,base layer shall be attached
per minimum requirements of FRSAITRI April 2012(04-1.2),
Exterior Research and Design,ILC. Evaluation Report A42960.10.12-R3
Certificate afAutharizatian#9503 FL16048-R3
Revision 3:10108/2015
Page 3 of 5
5.6.4 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: FRSA/TRI April 2012 (04-12)
does not address wind uplift resistance of all underlayr ient systems beneath foam-on the systems,where
the underlayment forms part of the load-path. The f [lowing wind uplift limitations apply to direct-deck
underlayment systems that are not addressed in FRS RI April 2012(04-12) and are used in foam-on tile
applications. Maximum Design Pressure is the result of testing for wind load resistance based on
allowable wind loads, and reflects the ultimate passing pressure divided by 2(the 2 to 1 margin of safety
per FBC 3.504.4 has already been applied). Refer to FBC 1609 for determination of design wind pressures.
5.6-4.1 Maximum Design Pressure=-45.0 ps#.
Deck: Min.1.5/32-inch plywood,to meet project requirements to satisfaction of AHJ.
Primer: (Optional)ASTM D41
Underlayment: Tri-Built S/A HT TU Underlayment;self-adhered.
5.7 Exposure Limitations:
5.7.1 Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left
exposed for longer than 30-days after installation
5.7.2 Tri-Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation.
6. INSTALLATION:
6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with' TRI-BUILT published installation,
requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below_
6.2 Re-fasten any loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly
to remove any dust and debris prior to application,and prime the substrate(if applicable).
6.3 Tri-Built Sand-R SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT SIA
Underlayment:
6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections
1507 for the type of prepared roof covering to be installed.
6.3.2 [Von-Tile applications:
While priming is optional,TRI-BUILT recommends priming the deck if the final roof cover is not slated for
installation within 24 hours_
Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel hack the first 3
ft of release film.
Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible.
Once the entire length of membrane is in place, peel-off the release film diagonally while holding the
membrane tight. Firmly roll the membrane into place to achieve a bond.
Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6-
inches and staggered not less than 2-ft from vertical seams in the course below. All over-granule end-laps
shall be sealed using either heat-welding or hot air welding techniques.
When installing at slopes above 8:12, Allied Building Products Corp recommends back-nailing in the
overlap area at the top of the sheet at 12-inch o.c.
For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths.Peel the release paper and center sheet
over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in
each direction. For valleys,apply the sheet starting at the lowest point and work upward.
6.3.3 Tile Aonlications(Tri-Built S/A HT TU Underlayment onlyl:
Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the
instructions noted above as a guideline.
Tile shall be loaded and staged in a manner that prevents the slippage and/or damage to the
underlayment.
Exterior Research and Design,LLC. Evaluation Report A42960.10.12-R3
Certificate q f Authorizatwn 799503 1`116048-113
Revision 3:10/08/2015
Page 4 of 5
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having.lurisdic Sion in order to properly evaluate the installation of
this product
8. MANUFACTURING PLANTS:
Contact the noted QA agency for information on product locatioi is covered for F.A.C.Rule 9N-3 CTA requirements.
9. QUALITY ASSURANCE ENTITY: _ i
UL,LLC—QUA9625;(314)578-3406;k.chancellor@us.ul.com
-EMD OF EVALUA'T'ION REPORT-
Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-R3
Certiftcate of Authorization#9503 FL16048-R3
Revision 3:10/08,(2015
Page 5 of 5