Loading...
HomeMy WebLinkAboutProduct Approval Florida Building Code Online https://www.floridabuilding.org/pr/pr_app_dd.aspa?param=wGEVX... �jI 12 1016 Imo` BCIS Nome log In User Registration Not Topics • SubmitSun:harge Stets Q Facts DUWta[bns FBC Statt BC1S Site Map. links Search Business, a'4 Professib•nal ( )5'l':f`bbc Approval FILE ` J DynducY.App{oyal r•fgnu>ploauSr or nppicafkm_Seath>MnAcatiQ111Gt>ARP�tiort Dotal FL# FL16048-R3 Application Type Revision Code Version 2014 Application Status Approved Comments Archived Product Manufacturer TRI-BUILT Roofing Products Address/Phone/Email 9050.1-ouisiana Street Merrillville,IN 46410 (201)842-2449 david.ruiz@tribuiltmaterialsgroup.com Authorized Signature David Ruiz david.ruiz@tribuiltmateriaisg roup.com Technical Representative David Ruiz Address/Phone/Email 250 Route 17 North East Rutherford,NJ 07073 (201)842-2449 david.ruiz@tribuiltmaterlaisgroup.com Quality Assurance Representative Address/Phone/Email Category Roofing Subcategory Underiayments Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer Evaluation Report-Hardcopy Received Florida Engineer or Architect Name who developed Robert Nleminen the Evaluation Report Florida License PE-59166 Quality Assurance Entity UL LLC Quality Assurance Contract Expiration Date 10/16/2017 Validated By John W.Knezevich,PE Validation Checklist-Hardcopy Received Certificate of Independence FL16048 R3 CO1215 QS_C01_Nieminen.pdf Referenced Standard and Year(of Standard) Standard Year ASTM D1970 2009 ASTM G155 2005 FRSA/TRIApril 2012(04-12) 2012 TAS 103 1995 1 of 2 6/2/2016 10:03 AM Florida Building Code Online https://www.floridabuilding.org/pr/pr_app_dti.aspx?param=wGEVX... Equivalence of Product Standards Certified By Sections from the Code Product Approval Method Method 1 Option D Date Submitted 10/08/2015 Date Validated 10/19/2015 Date Pending FBC Approval 10/21/2015 Date Approved 12/15/2015 Summary of Products FL# 1 Model,Number or Name Description 16048.1 TRI-BUILT Roof Underlayments Self-adhering,modified bitumen roof underlayments _._--_---�.__—._....._.----------- _ _.._._, ._..-__.__-- Limits of Use Installation Instructions Approved for use in HVHZ:No -FL-1-6-0-4,.-8—R--3-- KE L16048 R3 1I 2015 QUAL NAL ER TRI- ; Approved for use outside HVHZ:Yes j BUILT,IINDERLAYMENTS__FL_1A 48_R3,_pdf Impact Resistant:N/A Verified By:Robert Nieminen PE-59166 Design Pressure: +N/A/-45 Created by Independent Third Party:Yes Other: 1.)The design pressure noted herein pertains to use ;Evaluation Reports of foam-on tile systems overtop the self-adhering FL16048 R3 AE 2015 10 FINAL ER TRI- i undedayment for one particular application.See ER Section BU1lT_UNOERLAYMENTS FL36046-RR3.pdf j 5.6 for details.2.)Refer to ER Section 5 for other Limits of I Created by Independent Third Party:Yes Use. flack heleat� Contact us::1940 North rtanme5tle L_RVahassce EL32392 Phan"59- 87J1024 The State of Florida is an AA/EEO employer.Copylipht 200ug13.5tate.aLflatlda,::fthtaQr-fitatament::PL4e55pitY,Slalement::Refund statement Under Florida law,emal addresses are public records.If you do not want your a-mal address released In response to a pubic-records request,do not send electronic mal to this entity.Instead,contact the office by phone or by traditional mal.li you have any questions,please contact 8 50.4 87.1395.-Pursuant to Section 455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an emad address If they have one.The emals provided may be used for official communication with the kensee.However emal addresses are public record.If you do not wish to supply a personal address,please provide the Department with an emal address which can be made available to the public.lb determine r you are a lienee under Chapter 455,F.S.,please dick haft.• Product Approval Accepts- f:tt:i 2 of 2 6/2/2016 10:03 AM EXTERIOR RESEARCH&DESIGN,I.I.C. Certificate of Authorization#9503 UNIT#13 B E � 353 CHRISTIAN OXFORD,�CT 06478 PHONE:(203)262-9245 FAX:(203)262-9243 EVALUATION REPORT Allied Building Products Corp. Evaluation Report A42960.10.12-R3 dba TRI-BUILT Roofing Products FL16048-R3 9050 Louisiana Street Date of Issuance:10/25/2012 Merrillville,IN 46410 Revision 3: 10/08/2015 SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The products described herein have been evaluated for compliance with the 5th Edition (2014) Florida Building Code sections noted herein. DESCRIPTION: TRI-BUILT Roof Underlayments LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as.the named product(s)changes,the referenced Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. Trinity)ERD requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity IERD Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety. INSPECTION: Upon request,a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 5. Prepared by: �t,,tttttrrr,,, - :.@i•=is"="<:'••, -r^°exp sv,ti - :T Robert J.M.Nieminen,P.E. ,;�o^a,,,, ' 4^.'.+'• The facsimile seal appearing was authorised by Robes Weminen,+�n � P1.on 3010312015.This does not serve as an electronically signed Florido Registration No.59166,Florida DCA ANE1983 document,Signed,sealed hardcopies have been transmitted to the Product Approval Administrator and to the named client CERTIFICATION OF INDEPENDENCE: 1. TrinityjERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or distributing products it evaluates. 2. Trinityl ERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained specifically for that purpose. TRIM ERD ROOFING COMPONENT EVALUATION: 1. SCOPE: Product Category: Roofing Sub-Category: Underlayment Compliance Statement: TRI-BUILT Roof Underlayments, as produced by TRI-BUILT, have demonstrated compliance with the following sections of the Florida Building Code through testing in accordance with the following Standards. Compliance is subject to the Installation Requirements and Limitations/Conditions of Use set forth herein. 2. STANDARDS: Section Property Standard Year 1507.2.4.1507-2.8,1507.2.9.2, Physical Properties ASTM D1970 2009 1507.4.5.1,1507.5.3,1507.7.3 1504.6 Accelerated Weathering ASTM G155 2005 1507.3.3 Installation Practice FRSA/TRI April 2012(04-12) 2012 1523.6.5.2.1 Physical Properties TAS 103 1995 3. REFERENCES: Entity Examination Reference Date ERD(TST6049) Physical Properties 540540.02.13-1 02/19/2013 ERD(TST6049) Physical Properties 540540.11.13 11/19/2013 ERD(TST6049) Physical Properties 540540.03.14 03/26/2014 ERD(TST6049) Physical Properties 544870.04.14-2 04/02/2014 ERD(TST6049) Physical Properties 544870.04.14-3 04/02/2014 ERD(TST6049) Physical Properties 544870.04.14-1 04/10/2014 ERD(TST6049) Physical Properties 544870.04.14-4 04/10/2014 ERD(TST6049) Physical Properties 543530.02.14-1-111 05/14/2014 ERD(TST6049) Physical Properties 543530.05.14 05/28/2014 ERD(TST6049) Physical Properties 540540.10.14 10/31/2014 ERD(TST6049) Physical Properties SC7645.02.15 02/13/2015 ERD(TST6049) Accelerated Weathering SC8520.04.15 05/27/2015 UL,I.I.C.(QUA9625) Quality Control Multiple-Listing R16814 09/04/2015 UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.10/16/2017 4. PRODUCT DESCRIPTION: 4.1 Self-Adhering Underlavments: 4.1.1 Tri-Built Sand-R SA Shingle Underlayment is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen roof underlayment,with a 36-inch sheet width. 4.1.2 Tri-Built S/A HT TU Underlayment is a self-adhering, non-woven polyester fabric surfaced, SBS modified bitumen roof underlayment 4.1.3 Tri-Built Smooth HT S/A Underlayment is a self-adhering,glass-mat reinforced,film-surfaced,SBS modified bitumen roof underlayment. 5. UMITA71ONS: 5.1 This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically.for that purpose. 5.2 This Evaluation Report is not for use in the HVHZ. 5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials Directory for fire ratings of this product. Exterior Research and Design,I.A.C. Evaluation Report A42960.10.12-R3 Certificate of Authorization#9503 (1.16048-113 Revision 3:10/08/2015 Page 2 of 5 TRINITY ER® 5.4 TRI-BUILT Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced within FBC approval documents. If not listed,a request may be made to the AHJ for approval based on this evaluation combined with supporting data for the prepared roof covering. 5.5 Allowable roof covers applied atop the underlayments are as follows: TABLE 1: ROOF COVER OPTIONS Underlayment Asphalt Nail-On Tile Foam-On Tile Metal Wood Shakes Slate I Shingles &Shingles Tri-Built Sand-R SA Shingle jYes No No No Yes Yes Underlayment Tri-Built S/A HT TU Yes Yes Yes Yes Yes Yes Underlayment See 5.5.1 Tri-Built Smooth HT S/A Yes No No Yes Yes Yes Underlayment 5.5.1 "Foam-On Tile" is limited to use of the following Approved tile adhesives unless tensile adhesion /long term aging data from an accredited testing laboratory is provided. Tri-Built S/A HT TU Underlayment with 3M`2-Component Roof Tile Adhesive AH-160(FL6332)or Dow TileBond"'Roof Tile Adhesive(FL717) 5.6 Allowable substrates are noted below: 5.6.1 Direct-Bond to Deck: Tri-Built Sand-R SA Shingle Underlayment, Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT 5/A Underlayment applied to: Plywood; ASTM D41 primed plywood; OSB; ASTM D41 primed OSB; ASTM D41 primed structural concrete. While not required over plywood,OSB or Southern Yellow Pine substrates,TRI-BUILT recommends priming the deck if the final roof cover is not slated for installation within 24 hours. Note: TRI-BUILT requires tongue-and-groove board decking be covered with plywood or OSB prior to installation of the self- adhering underlayment. 5.6.2 Bond-to-Insulations Tri-Built S/A HT TU Underlayment applied to: i Dens Deck Prime;SECUROCK Gypsum-Fiber Roof Board. For installation under mechanically attached prepared roof coverings, insulation shall be attached per minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations under foam-on tile systems,insulation attachment shall be designed by a qualified design professional and installed based on testing of the insulation/underlayment system in accordance with FM 4474,Appendix D or TAS 114,Appendix J. 5.6.3 Bond to Mechanically Attached Base Laver: i ASTM D226,Type I or II felt. For installations under mechanically attached prepared roof coverings, base layer shall be attached per minimum codified requirements. For installations under foam-on tile systems,base layer shall be attached per minimum requirements of FRSA/TRI April 2012(04-12). Exterior Research and Design,LLC Evaluation Report A42960.10.12-R3 Certdmte of Authatkatlon 09303 FL16048-R3 Revision 3:10/08/2015 Page 3 of 5 TRINITY ERR 5.6.4 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: FRSA/TRI April 2012 (04-12) does not address wind uplift resistance of all underlayment systems beneath foam-on the systems,where the underlayment forms part of the load-path. The following wind uplift limitations apply to direct-deck underlayment systems that are not addressed in FRSA/TRI April 2012 (04-12)and are used in foam-on the applications. Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads, and reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been applied). Refer to FBC 1609 for determination of design wind pressures. 5.6.4.1 Maximum Design Pressure=-45.0 psf. Deck: Min. 15/32-inch plywood to meet project requirements to satisfaction of AH). Primer: (Optional)ASTM D41 Underlayment: Tri-Built S/A HT TU Underlayment,self-adhered. 5.7 Exposure Limitations: 5.7.1 Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left exposed for longer than 30-days after installation 5.7.2 Tri-Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation. 6. INSTALLATION: 6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT published installation requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below. 6.2 Re-fasten any loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application,and prime the substrate(if applicable). 6.3 Tri Built Sand-R SA Shingle Underlayment Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A Underlayment: 6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections 1507 for the type of prepared roof covering to be installed. 6.3.2 Non-Tile applications: While priming is optional,TRI-BUILT recommends priming the deck if the final roof cover is not slated for installation within 24 hours. Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3 ft of release film. Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible. Once the entire length of membrane is in place, peel-off the release film diagonally while holding the membrane tight. Firmly roll the membrane into place to achieve a bond. Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6- inches and staggered not less than 2-ft from vertical seams in the course below. All over-granule end-laps shall be sealed using either heat-welding or hot air welding techniques. When installing at slopes above 8:12, Allied Building Products Corp recommends back-nailing in the overlap area at the top of the sheet at 12-inch o.c. Foe Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths.Peel the release paper and center sheet over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in each direction. For valleys,apply the sheet starting at the lowest point and work upward. 6.3.3 Tile Applications(Tri-Built S/A HT TU Underlayment only): Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the instructions noted above as a guideline. Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. Exterior Research and Design,LLC. Evaluation Report A42960.10.12-R3 CerWwte alAuthoritoNon IJ9503 FL16048-113 Revision 3:10/08/2015 Page 4 of 5 TRINITY ERD 7. BUILDING PERMIT REQUIREMENTS: As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. 8. MANUFACTURING PLANTS: Contact the noted CA agency for information on product locations covered for F.A.C.Rule 9N-3 QA requirements. 9. QUALITY ASSURANCE ENTITY: UL,LLC—QUA9625;(314)578-3406;k.chancellor@us.ul.com END OF EVALUATION REPORT- Exterior Research and Design,UC. Evaluation Report A42960.10.12-113 Certowcate of Authorization#9503 F116048-113 Revision 3:10/08/2015 Page 5 of 5