HomeMy WebLinkAboutProduct Approval (2) Florida BuildingRC.LLo E-bii1iI 20 ,.h Page 1 oft
c
4
,.�,Y s,ri,+:9F�''LLk'�{0.'l."t�r''ar�lZC,jrt'{r"c• dia+4Y a �"° i"t'" aR41 7• YA•„2�1,�^X'e ..xr s*1.
S}-,la est r'"�' �r�'`�'�, A .L� � i � } s" ' 4•✓� � M�1yx
�%I-
s>t f�
t X01 —All 3. t
ra
N 1P;PT7:�'�t4)ryt��;^� g.
r 'u r rr ar, tf; r , r•{ h' it "r smti2 l�3aJri�?Y�TV y7T!(T1
-��iOJ;C�\91I'I1CI)t SCIS Home Log In User Registration Hot Topics Submit Surcharge Stats&Facts Publications I FBC Staff BCIS Site Map t Links Search -
BusinesProd
Professional O—g'mUSER:PubIiAPPrOVaI
er
Regulation new /
f:�71ttIUY4�tixl/t71iCIWY fYndu t Anlvoval o-jey>Product or Anulicabon search>Application Lis t>Application Detail
f{ffi� rv� FL# FL16048-R3 I
Application Type Revision {
Code Version 2014 ✓ I rn r
Application Status Approved (!/
Comments
Archived i.i
Product Manufacturer TRI-BUILT Roofing Products
Address/Phone/Email 9050 Louisiana Street
Merrillville,IN 46410
(201)842-2449
david.ruiz@tribuiltmateriaisgroup.com
Authorized Signature David Ruiz
david.ruiz@tribuiltmateriaisgroup.com
Technical Representative David Ruiz
Address/Phone/Email 250 Route 17 North
East Rutherford,NJ 07073
(201)842-2449
david.ruiz@tribuiltmaterialsgroup.coin
Quality Assurance Representative
Address/Phone/Email
Category Roofing
Subcategory Underlayments
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed
Florida Professional Engineer
Evaluation Report-Hardcopy Received
Florida Engineer or Architect Name who developed Robert Nieminen
the Evaluation Report
Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Contract Expiration Date 10/16/2017
Validated By John W. Knezevich,PE
! I Validation Checklist-Hardcopy Received
Certificate of Independence FL16048 R3 COI 2015 01 COI Nierrtinen•odf
Referenced Standard and Year(of Standard) Standard Year
ASTM D1970 2009
ASTM G155 2005
FRSA/TRI April 2012(04-12) 2012
TAS 103 1995
Equivalence of Product Standards
Certified By
Sections from the Code
a..t ------n-
Florida Building Code Online Page 2 of 2
Product Approval Method Method 1 Option D
Date Submitted 10/08/2015
Date Validated 10/19/2015
Date Pending FBC Approval 10/21/2015
Date Approved 12/15/2015
Summary of Products
FL# Model,Number or Name Description
16048.1 TRI-BUILT Roof Underlayments Self-adhering, modified bitumen roof underlayments
Limits of Use Installation Instructions
Approved for use in HVHZ:No FL16048 R3 11 2015 10 FINAL ER TRI-
Approved for use outside HVHZ:Yes BUILT UNDERLAYMENTS FL16048-R3.Ddf
Impact Resistant:N/A Verified By: Robert Nieminen PE-59166
Design Pressure: +N/A/-45 Created by Independent Third Party:Yes
Other: 1.)The design pressure noted herein pertains to use Evaluation Reports
of foam-on tile systems overtop the self-adhering FL16048 R3 AE 2015 10 FINAL ER TRI-
underiayment for one particular application.See ER Section BUILT UNDERLAYMENTS FL16048-R3.Ddf
5.6 for details. 2.)Refer to ER Section 5 for other Limits of Created by Independent Third Party:Yes
Use.
F.. Next
Contact Us::1940 North Monroe Street.Tallahassee Fl.32399 Phone:850-487-1824
The State of Florida Is an AA/EEO employer.Coovrioht 2007-2013 State of Florida.::Privacy Statement::Accessibility Statement::Refund Statement
Under Florida law,email addresses are public records.If you do not want your a-mail address released in response to a public-records request,do not send
electronic mail to this entity.instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.'Pursuant to
Section 455.275(1),Florida statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if
they have one.The emails provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to
supply a personal address,please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under
Chapter 455,F.S.,please click here.
Product Approval Accepts:
® [Llrcd. M
sccuritysi rltiv.
"D EXTERIOR RESEARCH& DESIG N, LLC.
Certificate of Authorization#9503
��I�I� ERD 353 CHRISTIAN STREET, UNIT 413
OXFORD,CT 06478
PHONE:(203) 262-9245
FAX:(203) 262-9243
EVALUATION REPORT
Allied Building Products Corp. Evaluation Report A42960.10.12-R3
dba TRI-BUILT Roofing Products FI-16048-R3
9050 Louisiana Street Date of Issuance:10/25/2012
Merrillville, IN 46410 Revision 3: 10/08/2015
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The
products described herein have been evaluated for compliance with the 5"' Edition (2014) Florida Building Code
sections noted herein.
DESCRIPTION: TRI-BUILT Roof Underlayments
LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes,the referenced
Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of
this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product
changes or the referenced Quality Assurance documentation changes. Trinity I ERD requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words "TrinitylERD Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety.
INSPECTION:Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages 1 through 5.
Prepared by:
Robert 1.M. Nieminen,P.E. I�7FS��J` Q,,+` The facsimile seal appearing was authorized by Robert Nierninen,
,,,+,,:+++ P.E.on 10108/2015.This does not serve as an electronically signed
Florida Registration No.59166, Florida DCA ANE1983 document.signed,sealed hardcopies have been transmitted to the
Product Approval Administrator and to the named client
CERTIFICATION OF INDEPENDENCE:
1. Trinity ERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. Trinityl ERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nieminen,P.E.does not have nor will acquire, a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained
specifically for that purpose.
l-R NITY) ERS
5.6.4 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: FRSA/TRI April 2012 (04-12)
does not address wind uplift resistance of all underlayment systems beneath foam-on tile systems, where
the underlayment forms part of the load-path. The following wind uplift limitations apply to direct-deck
underlayment systems that are not addressed in FRSA/TRI April 2012 (04-12) and are used in foam-on tile
applications. Maximum Design Pressure is the result of testing for wind load resistance based on
allowable wind loads, and reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety
per FBC 1504.9 has already been applied). Refer to FBC 1609 for determination of design wind pressures.
5.6.4.1 Maximum Design Pressure=-45.0 psf.
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of AHJ.
Primer: (Optional)ASTM D41
Underlayment: Tri-Built S/A HT TU Underlayment,self-adhered.
5.7 Exposure Limitations:
5.7.1 Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left
exposed for longer than 30-days after installation
5.7.2 Tri-Built S/A HTTU Underlayment shall not be left exposed for longer than 180-days after installation.
6. INSTALLATION:
6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT published installation
requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below.
6.2 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly
to remove any dust and debris prior to application,and prime the substrate(if applicable).
6.3 Tri-Built Sand-R SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment:
6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections
1507 for the type of prepared roof covering to be installed.
6.3.2 Non-Tile applications:
While priming is optional,TRI-BUILT recommends priming the deck if the final roof cover is not slated for
installation within 24 hours.
Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3
ft of release film.
Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible.
Once the entire length of membrane is in place, peel-off the release film diagonally while holding the
membrane tight. Firmly roll the membrane into place to achieve a bond.
Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6-
inches and staggered not less than 2-ft from vertical seams in the course below. All over-granule end-laps
shall be sealed using either heat-welding or hot air welding techniques.
When installing at slopes above 8:12, Allied Building Products Corp recommends back-nailing in the
overlap area at the top of the sheet at 12-inch o.c.
For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper and center sheet
over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in
each direction. For valleys,apply the sheet starting at the lowest point and work upward.
6.3.3 Tile Applications(Tri-Built S/A HT TU Underlayment only):
Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the
instructions noted above as a guideline.
Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the
underlayment.
Exterior Research and Design,LLC. Evaluation Report A42960.10.12-R3
Certificate of Authorizatlon#9503 FL16048-113
Revision 3:10/08/2015
Page 4 of 5
D
1111JTRINIT'(� ERD
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of
this product.
8. MANUFACTURING PLANTS:
Contact the noted QA agency for information on product locations covered for F.A.C. Rule 9N-3 QA requirernents.
9. QUALITY ASSURANCE ENTITY:
UL, LLC—QUA9625;(314)578-3406; k.chancellor@us.ul.com
END OF EVALUATION REPORT-
Exterior Research and Design,I.L.C. Evaluation Report A42960.10.12-R3
certificate of Authorization#9503 FL16048-R3
Revision 3:10/08/2015
Page 5 of 5
C `
'\J TRINITY I ER®
ROOFING COMPONENT EVALUATION:
1. SCOPE:
Product Category: Roofing
Sub-Category: Underlayment
Compliance Statement: TRI-BUILT Roof Underlayments, as produced by TRI-BUILT, have demonstrated com pliance
with the following sections of the Florida Building Code through testing in accordance with the following Standards.
Compliance is subject to the Installation Requirements and Limitations/Conditions of Use set forth herein.
2. STANDARDS:
Section Property Standard Year
1507.2.4,1507.2.8,1507.2.9.2, Physical Properties ASTM D1970 2009
1507.4.5.1,1507.5.3,1507.7.3
1504.6 Accelerated Weathering ASTM G155 2005
1507.3.3 Installation Practice FRSA/TRI April 2012(04-12) 2012
1523.6.5.2.1 Physical Properties TAS 103 1995
3. REFERENCES:
Entity Examination Reference Date
ERD(TST6049) Physical Properties 540540.02.13-1 02/19/2013
ERD(TST6049) Physical Properties 540540.11.13 11/19/2013
ERD(TST6049) Physical Properties 540540.03.14 03/26/2014
ERD(TST6049) Physical Properties 544870.04.14-2 04/02/2014
ERD(TST6049) Physical Properties S44870.04.14-3 04/02/2014
ERD(TST6049) Physical Properties 544870.04.14-1 04/10/2014
ERD(TST6049) Physical Properties 544870.04.14-4 04/10/2014
ERD(TST6049) Physical Properties 543530.02.14-1-R1 05/14/2014
ERD(TST6049) Physical Properties 543530.05.14 05/28/2014
ERD(TST6049) Physical Properties 540540.10.14 10/31/2014
ERD(TST6049) Physical Properties SC7645.02.15 02/13/2015
ERD(TST6049) Accelerated Weathering SC8520.04.15 05/27/2015
UL,LLC.(QUA9625) Quality Control Multiple-Listing R16814 09/04/2015
UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.10/16/2017
4. PRODUCT DESCRIPTION:
4.1_ .___ Self-Adhering-Underlayments:
�4 T 1— _Tri B�itlt Sand R SA'Shingle_Un v_der.lay_medls a self-adhering, glass-mat reinforced, sand-surfaced, SBS
mod men-—goof und�erlayment,with a 36-inch sheet width.
4.1.2 Tri-Built S/A HT TU Underlayment is a self-adhering, non-woven polyester fabric surfaced, SBS modified
bitumen roof underlayment
4.1.3 Tri-Built Smooth HT S/A Underlayment is a self-adhering,glass-mat reinforced,film-surfaced,SBS modified
bitumen roof underlayment.
5. LIMITATIONS:
5.1 This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the
Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was
used for permitting or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in the HVHZ.
5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials
Directory for fire ratings of this product.
Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-R3
Certificate Of Authorization#9503 FL16048-113
Revision 3:10/08/2015
Page 2 of 5
h /1f
�1 TlZllolHY ERD
5.4 TRI-BUILT Roof Underlayments may be used with any prepared roof cover where the product is specifically
referenced within FBC approval documents. If not listed, a request may be made to the AHJ for approval
based on this evaluation combined with supporting data for the prepared roof covering.
5.5 Allowable roof covers applied atop the underlayments are as follows:
�. TABLE 1 ROOF COVER OPTIONS
Asphalt Wood Shakes
Underlayment Shingles Nail-On Tile Foam-On Tile Metal &Shingles Slate
Tri-Built Sand-R SA Shingle Yes No No No Yes Yes
Underlayment
Tri-Built S/A HT TU Yes Yes Yes Yes Yes Yes
Underlayment See 5.5.1
Tri-Built Smooth HT S/A Yes No No Yes Yes Yes
Underlayment
5.5.1 "Foam-On Tile" is limited to use of the following Approved tile adhesives unless tensile adhesion / long
term aging data from an accredited testing laboratory is provided.
Y Tri-Built S/A HT TU Underlayment with 3M'"2-Component Roof Tile Adhesive AH-160(FL6332) or Dow
TileBond" Roof Tile Adhesive(FL717)
5.6 Allowable substrates are noted below:
5.6.1 Direct-Bond to Deck:
Tri-Built Sand-R SA Shingle Underlayment, Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment applied to:
Plywood; ASTM D41 primed plywood; OSB; ASTM D41 primed OSB; ASTM D41 primed structural
concrete.
While not required over plywood,OSB or Southern Yellow Pine substrates,TRI-BUILT recommends priming
the deck if the final roof cover is not slated for installation within 24 hours. Note: TRI-BUILT requires
tongue-and-groove board decking be covered with plywood or OSB prior to installation of the self-
adhering underlayment.
5.6.2 Bond-to-Insulation:
Tri-Built 5/A HT TU Underlayment applied to:
Dens Deck Prime;SECUROCK Gypsum-Fiber Roof Board.
For installation under mechanically attached prepared roof coverings, insulation shall be attached per
minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations
under foam-on tile systems,insulation attachment shall be designed by a qualified design professional and
installed based on testing of the insulation/underlayment system in accordance with FM 4474,Appendix D
or TAS 114,Appendix J.
5.6.3 Bond to Mechanically Attached Base Laver:
ASTM D226,Type I or II felt.
For installations under mechanically attached prepared roof coverings, base layer shall be attached per
minimum codified requirements. For installations under foam-on tile systems,base layer shall be attached
per minimum requirements of FRSA/TRI April 2012(04-12).
Exterior Research and Design,LLC. Evaluation Report A42960.10.12-R3
Certificate of Authorization#9503 FL16048-113
Revision 3:10/08/2015
Page 3 of 5