Loading...
HomeMy WebLinkAboutENGINEER LETTERMarch 17, 2016 Mr. Allen Berger JB Garage Doors, Inc. 12195 NW 98th Avenue Hialeah Gardens, FL 33018 Re: Steel Sectional Garage Doors NOA # 15-0317.02,15-0317.03,15-0317.04, 15- )317.01,15-0317.05, 15-0304.02, 15-0317.06, 15-0302.01, 15-0304.01 Anchorage of Vertical Bracket for Top Track Connection Dear Mr. Berger, Please note that vertical bracket shown on the att iched detail R-1 is to be anchored in 3 locations as described on NOA drawings (see sheet R-2 for re erence). The additional hole locations for this bracket is to allow for adjusting the placement of the bracket due to varying substrate dimension per project condition. This condition appliesor the abc -ve referenced product approvals. If you have any questions, please feel free to cat us. Very truly yours, No 70592'. ri -53 8 T F dict,. .�c�• OR,pQ•'��� Jawad Ahmad, Pfs'oNAit ` Seated 3118116 Director of Engineering 9360 Sunset Dr., Ste 220 Miami, FL 33173 T: 305.24.8100 1 F 305.262.6978 1 www.afcenR.com I aifarooq@afcene.com