Loading...
HomeMy WebLinkAboutpermit applicationEXTERIOR RESEARCH & DESIGN, LLC. Certificate of Authorization #95031/ TRINITY ERD OXFORD, CT 06478 353 CHRISTIAN STREET, UNIT #13 PHONE: (203) 262-9245 FAX: (203) 262-9243 EVALUATION REPORT Allied Building Products Corp.Evaluation Report A42960.10.12-R3 dba TRI-BUILT Roofing Products FL16048-R3 9050 Louisiana Street Date of Issuance: 10/25/2012 Merrillville, IN 46410 Revision 3: 10/08/2015 SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The thproducts described herein have been evaluated for compliance with the 5 Edition (2014) Florida Building Code sections noted herein. DESCRIPTION: TRI-BUILT Roof Underlayments LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced Quality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. Trinityl ERD requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity IERD Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety. INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site atthe request of the Building Official. This Evaluation Report consists of pages 1 through 5. Prepared by: Robert J.M. Nieminen, P.E. Florida Registration No. 59166, Florida DCA ANE1983 00*0, -- e e .._# I •.. 5427*xo s,i'Se- ·.,5 5 1.8.- srms c: . /1,1 =f:{lfs,-The facsimile seal appearing was authorized by Robert Nieminen, P.E. on 10/08/2015. This does notserveas an electronically signed document. Signed, sealed hardcopies have been transmitted to the Product Approval Administrator and to the named client CERTIFICATION OF |NDEPENDENCE: 1. TrinityIERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or distributing products it evaluates. 2. TrinityI ERD is not owned, operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither Trinityl ERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically forthat purpose. 2. 3. 4. 5. \J TRINITY ERD ROOFING COMPONENT EVALUATION: 1. SCOPE: Product Category:Roofing Sub-Category:Underlayment Compliance Statement: TRI-BUILT Roof Underlayments, as produced by TRI-BUILT, have demonstrated compliance with the following sections of the Florida Building Code through testing in accordance with the following Standards. Compliance is subject tothe Installation Requirements and Limitations/ Conditions of Use set forth herein. STANDARDS: Section 1507.2.4, 1507.2.8, 1507.2.9.2, 1507.4.5.1, 1507.5.3, 1507.7.3 1504.6 1507.3.3 1523.6.5.2.1 REFERENCES: Entitv ERD (TST6049) ERD (TST6049) ERD (TST6049) ERD (TST6049) ERD (TST6049) ERD (TST6049) ERD (TST6049) ERD (TST6049) ERD (TST6049) ERD (TST6049) ERD (TST6049) ERD (TST6049) UL, LLC. (QUA9625) UL, LLC. (QUA9625) Property Physical Properties Accelerated Weathering Installation Practice Physical Properties Examination Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Physical Properties Accelerated Weathering Quality Control Quality Control Standard ASTM D 1970 ASTM G 155 FRSA/TRI April 2012 (04-12) TAS 103 Reference 540540.02.13-1 540540.11.13 540540.03.14 544870.04.14-2 544870.04.14-3 544870.04.14-1 544870.04.14-4 543530.02.14-1-Rl 543530.05.14 540540.10.14 SC7645.02.15 SC8520.04.15 Multiple-Listing R16814 Service Confirmation Year 2009 2005 2012 1995 Date 02/19/2013 11/19/2013 03/26/2014 04/02/2014 04/02/2014 04/10/2014 04/10/2014 05/14/2014 05/28/2014 10/31/2014 02/13/2015 05/27/2015 09/04/2015 Exp. 10/16/2017 PRODUCT DESCRIPTION: 4.1 Self-Adhering Underlavments: 4.1.1 Tri-Built Sand-R SA Shingle Underlayment is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen roof underlayment, with a 36-inch sheet width. 4.1.2 Tri-Built S/A HT TU Underlayment is a self-adhering, non-woven polyester fabric surfaced, SBS modified bitumen roof underlayment 4.1.3 Tri-Built Smooth HT S/A Underlayment is a self-adhering, glass-mat reinforced, film-surfaced, SBS modified bitumen roof underlayment. LIMITATIONS: 5.1 This is a building code evaluation. Neither TrinityIERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in the HVHZ. 5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials Directory for fire ratings of this product. Exterior Research and Design, LLC. Certificate of Authorization #9503 Evaluation Report A42960.10.12-R3 FL16048-R3 Revision 3: 10/08/2015 Page 2 of 5 V TRINITY IERD 5.4 TRI-BUILT Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced within FBC approval documents. If not listed, a request may be made to the AHJ for approval based on this evaluation combined with supporting data for the prepared roof covering. 5.5 Allowable roof covers applied atop the underlayments are as follows: Underlayment Tri-Built Sand-R SA Shingle Underlayment Tri-Built S/A HT TU Underlayment Tri-Built Smooth HT S/A Underlayment Asphalt Shingles Yes Yes Yes TABLE 1: ROOF COVER OPTIONS Nail-On Tile No Yes No Foam-On Tile No Yes See 5.5.1 No Metal No Yes Yes Wood Shakes & Shingles Yes Yes Yes Slate Yes Yes Yes 5.5.1 "Foam-On Tile" is limited to use of the following Approved tile adhesives unless tensile adhesion / long term aging data from an accredited testing laboratory is provided. > Tri-Built S/A HT TU Underlayment with 3M™ 2-Component Roof Tile Adhesive AH-160 (FL6332) or Dow TileBond™ Roof Tile Adhesive (FL717) 5.6 Allowable substrates are noted below: 5.6.1 Direct-Bond to Deck: Tri-Built Sand-R SA Shingle Underlayment, Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A Underlayment applied to: > Plywood; ASTM D41 primed plywood; OSB; ASTM D41 primed OSB; ASTM D41 primed structural concrete. 5.6.2 5.6.3 While not required over plywood, OSB or Southern Yellow Pine substrates, TRI-BUILT recommends priming the deck if the final roof cover is not slated for installation within 24 hours. Note: TRI-BUILT requires tongue-and-groove board decking be covered with plywood or OSB prior to installation of the self- adhering underlayment. Bond-to-Insulation: Tri-Built S/A HT TU Underlayment applied to: > Dens Deck Prime; SECUROCK Gypsum-Fiber Roof Board. For installation under mechanically attached prepared roof coverings, insulation shall be attached per minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations under foam-on tile systems, insulation attachment shall be designed by a qualified design professional and installed based on testing of the insulation/underlayment system in accordance with FM 4474, Appendix D or TAS 114, Appendix J. Bond to Mechanically Attached Base Layer: > ASTM D226, Type I or 11 felt. For installations under mechanically attached prepared roof coverings, base layer shall be attached per minimum codified requirements. For installations under foam-on tile systems, base layer shall be attached per minimum requirements of FRSA/TRI April 2012 (04-12). Exterior Research and Design, LLC. Certificate of Authorization #9503 Evaluation Report A42960.10.12-R3 FL16048-R3 Revision 3: 10/08/2015 Page 3 of 5 \J TRINITY IERD 5.6.4 Wind Resistance for Underlavment Systems in Foam-On Tile Applications: FRSA/TRI April 2012 (04-12) does not address wind uplift resistance of all underlayment systems beneath foam-on tile systems, where the underlayment forms part of the load-path. The following wind uplift limitations apply to direct-deck underlayment systems that are not addressed in FRSA/TRI April 2012 (04-12) and are used in foam-on tile applications. Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads, and reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been applied). Refer to FBC 1609 for determination of design wind pressures. 5.6.4.1 Maximum Design Pressure = -45.0 psf. Deck:Min. 15/32-inch plywood to meet project requirements to satisfaction of AHJ. Primer:(Optional) ASTM D41 Underlayment:Tri-Built S/A HT TU Underlayment, self-adhered. 5.7 Exposure Limitations: 5.7.1 Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left exposed for longer than 30-days after installation 5.7.2 Tri-Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation. 6. INSTALLATION: 6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT published installation requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below. 6.2 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application, and prime the substrate (if applicable). 6.3 Tri-Built Sand-R SA Shingle Underlavment. Tri-Built S/A HT TU Underlavment or Tri-Built Smooth HT S/A Underlavment: 6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections 1507 for the type of prepared roof covering to be installed. 6.3.2 Non-Tile applications: While priming is optional, TRI-BUILT recommends priming the deck if the final roof cover is not slated for installation within 24 hours. Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3 ft of release film. Adhere the exposed part to the substrate and unroll the remaining membrane as faras possible. Once the entire length of membrane is in place, peel-off the release film diagonally while holding the membrane tight. Firmly roll the membrane into place to achieve a bond. Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6- inches and staggered not less than 2-ft from vertical seams in the course below. All over-granule end-laps shall be sealed using either heat-welding or hot air weldingtechniques. When installing at slopes above 8:12, Allied Building Products Corp recommends back-nailing in the overlap area atthe top of the sheet at 12-inch o.c. For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper and center sheet over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in each direction. For valleys, apply the sheet starting at the lowest point and work upward. 6.3.3 Tile Applications (Tri-Built S/A HT TU Underlavment only): Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the instructions noted above as a guideline. Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. Exterior Research and Design, LLC. Certificate of Authorization #9503 Evaluation Report A42960.10.12-R3 FL16048-R3 Revision 3: 10/08/2015 Page 4 of 5 \J TRINITY ERD 7. BuILDING PERMIT REQUIREMENTS: As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. 8. MANUFACTURING PLANTS: Contact the noted QA agency for information on product locations covered for F.A.C. Rule 9N-3 QA requirements. 9. QUALITY Assu RANCE ENTITY: UL, LLC-QUA9625; (314) 578-3406; k.chancellor@us.ul.com - END OF EVALUATION REPORT - Exterior Research and Design, LLC. Certificate of Authorization #9503 Evaluation Report A42960.10.12-R3 FL16048-R3 Revision 3: 10/08/2015 Page 5 of 5