HomeMy WebLinkAboutProduct Approval (2) e
• 9 M
�.s C
...:f .�
PEXYTI'OR
R E C E I VE D DCT 2y i0iRESEARCH & DESIGN, LLC.
Certificate of Authorization#9503
f 353 CHRISTIAN STREET, UNIT #13
TRINITY I ER _ OXFORD, CT 06478 E C,
is ��f l;} PHONE: (203) 262-9245
`
FAX: (203) 262-9243
EVALUATION REPORT OCT 2���a�
Soprema, Inc. Evaluation Report S18010.06.09-114
1640 rue Haggerty PER111f77l2N,'3. FL2569-R6
Drummondville, Quebec 32C 5P8 St. Lucie County, FL Date of Issuance: 06/15/2009
Canada Revision 4: 05/22/2013
SCOPE:
This Evaluation Report is issued under Rule 9N-3 and the applicable rules and regulations governing
the use of construction materials in the State of Florida. The documentation submitted has been
reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code and
Florida Building Code, Residential Volume. The products described herein have been designed to
comply with the 2010 Florida Building Code sections noted herein.
DESCRIPTION: Soprema Roof Underlayments
LABELING: Each unit shall bear labeling in accordance with the requirements the Accredited Quality
Assurance Agency noted herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s)
changes, the referenced Quality Assurance documentation changes, or provisions of the Code that
relate to the product change. Acceptance of this Evaluation Report by the named client constitutes
agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality
Assurance documentation changes. TrinitvJERD requires a complete review of this Evaluation
Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity)ERD Evaluated" may
be displayed in advertising literature. If any portion of the Evaluation Report is displayed, then it
shall be done in its entirety.
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by
the manufacturer or its distributors and shall be available for inspection at the job site at the
request of the Building Official.
This Evaluation Report consists of pages 1 through 8.
Prepared by:
` G s The facsimile seal appearing was authorized
by Robert Nieminen,P.E.on 05/22/2013
Ile ''�� � .: L,T � This does not serve as an electronically signed
Robert J.M. Nieminen P.E. ,,,t`FS st ytr`', document. Signed,sealed hardcopies have been
r ,�O aU
Florida Registration No. 59166,Florida DCA ANE1983 "'"".... to the transmitted
amed client
Product Approval Administrator and
I
CERTIFICATION OF INDEPENDENCE:
1. TrinitylERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. TrinitylERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nieminen, P.E. does not have nor will acquire,a financial interest in any company manufacturing or distributing products for which
the evaluation reports are being issued.
4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the
product.
TRINITY 1 ER®
I
ROOFING COMPONENT EVALUATION:
1. SCOPE:
Product Category: Roofing
Sub-Category: Underlayment
Compliance Statement: Roof Underlayments, as produced by Soprema, have demonstrated
compliance with the following sections of the Florida Building Code through testing in accordance with
the following Standards. Compliance is subject to the Installation Requirements and Limitations /
Conditions of Use set forth herein.
2. STANDARDS:
Section Property Standard Year
1504.3.1 Wind Resistance FM 4474 2004
1507.2.4, 1507.2.9.2, Physical Properties ASTM D1970 2001
1507.5.3
1507.11.2 Physical Properties ASTM D6163 2000
1507.11.2 Physical Properties ASTM D6164 2005
1523.6.5.2.1 Physical Properties TAS 103 1995
1523.6.5.2.17.3 Tensile Adhesion ASTM D1623 2009
TAS 110 Accelerated Weathering TAS 110 2000
1507.3.3 Installation Practice FRSA/TRI 07320 2005
3. REFERENCES:
Entity Examination Reference Date
ERD (TST6049) ASTM D1970/TAS 110 2968.05.04-2 05/14/2004
ERD (TST6049) Physical Properties 2757.02.05 02/03/2005
ERD (TST6049) ASTM D1970/TAS 110 2974.03.05-2 05/17/2005
ERD (TST6049) Wind Resistance 2778.07.05 07/15/2005
ERD (TST6049) Wind Resistance 2779.11.05-111 04/18/2007
ERD (TST6049) TAS 103/TAS 110 S7120.11.07-2 11/02/2007
ERD (TST6049) ASTM D1970/TAS 110 S13190.02.09-R1 04/01/2010
ERD (TST6049) ASTM D1970/TAS 110 S31370.03.10-1-R1 04/07/2010
ERD (TST6049) Physical Properties/Tensile Adhesion S11150.05.10-R1 09/09/2010
ERD (TST6049) Physical Properties/Tensile Adhesion 511150.05.09-R2 10/05/2010
ERD (TST6049) ASTM D1970 537210.11.11 11/09/2011
ERD (TST6049) ASTM D1970 S40540.02.13-1 02/19/2013
M-D (CER1592) HVHZ Compliance 09-1005.02 11/04/2010
M-D(CER1592) HVHZ Compliance 11-1206.04 03/15/2012
ICC-ES (EVL2396) 2012, 2009 and 2006 IBC Compliance ESR-1524 03/01/2013
UL, LLC (QUA9625) Quality Control Service Confirmation Exp. 11/30/2014
4. PRODUCT DESCRIPTION:
4.1 LASTOBOND TU is a self-adhering, non-woven polyester fabric surfaced, SBS modified bitumen
roof underlayment.
4.2 LASTOBOND SHIELD is a self-adhering, woven polyethylene surfaced, SBS modified bitumen roof
underlayment available in two widths; 36 and 45 inch.
4.3 LASTOBOND SHIELD HT is a self-adhering, woven polyethylene surfaced, high temperature, SBS
modified bitumen roof underlayment.
4.4 LASToeoND PRo HT-N is a self-adhering, woven polyethylene surfaced, SBS modified bitumen
roof underlayment available in two widths; 36 and 45 inch.
4.5 LASTOBOND PRo HT-S is a self-adhering, woven polyethylene surfaced, high temperature, SBS
modified bitumen roof underlayment.
Exterior Research and Design, LLC. Evaluation Report S18010.06.09-114
Certificate ofAuthorization#9503 FL2569-R6
Revision 4. 05/22/2013
Page 2 of 8
TRINITY ERD
4.6 LASTOBOND 195 is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen
roof underlayment.
4.7 LAsroBOND is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen roof
underlayment.
4.8 LAsTOBOND Eco is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen
roof underlayment.
4.9 LASTOBOND SMOOTH SEAL HT is a self-adhering, glass-mat reinforced, film-surfaced, SBS modified
bitumen roof underlayment.
4.10 RESISTO ECONO is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen
roof underlayment.
4.11 REslsro LB1236 is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen
roof underlayment, with a 36-inch sheet width.
4.12 PRIMESOURCE GRIP-RITE EAVE & VALLEY PROTECTOR is a self-adhering, glass-mat reinforced, sand-
surfaced, SBS modified bitumen roof underlayment, with a 36-inch sheet width.
4.13 EcoSTAR, LLC. GLACIER GUARD 100 is a self-adhering, glass-mat reinforced, sand-surfaced, SBS
modified bitumen roof underlayment, with a 36-inch sheet width.
4.14 REsIsTo LB1244 is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen
roof underlayment, with a 44-inch sheet width.
4.15 COLPHENE FR GR is a self-adhering, fiberglass reinforced, granule-surfaced, SBS modified
bitumen roof underlayment.
4.16 UNILAY (E) is a mechanically attached, polyester reinforced, granule-surfaced, SBS modified
bitumen roof underlayment.
S. LIMITATIONS:
5.1 This Evaluation Report is not for use in the HVHZ.
5.2 Fire Classification is not part of this report; refer to current Approved Roofing Materials
Directory for fire ratings of this product.
5.3 Soprema Roof Underlayments may be used with any prepared roof cover where the product is
specifically referenced within FBC approval documents. If not listed, a request may be made to
the AH] for approval based on this evaluation combined with supporting data for the prepared
roof covering.
5.4 Allowable roof covers applied atop the underlayments are follows:
Table 1: Roof Cover Options
Underlayment Asphalt Nail-On Foam-On Metal Wood Shakes Slate
Shingles Tile Tile &L Shingles
Lastobond TU Yes Yes No No Yes Yes
Lastobond Shield/Pro HT-N Yes No No No Yes Yes
Lastobond Shield HT/Pro HT-S Yes No No Yes Yes Yes
Lastobond/Lastobond 195 Yes No No No Yes Yes
Lastobond ECO/Resisto Econo/
Resisto LB1236,Grip-Rite Eave& Yes No No No Yes Yes
Valley Protector or Glacier Guard
100/Resisto LB1244
Lastobond Smooth Seal HT Yes No No Yes Yes Yes
Colphene FR GR Yes Yes Yes See 5.4.1 No es Yes
Y
Unilay(e) Yes Yes Yes No No No
Batten Only See 5.4.1
Exterior Research and Design,LLC. Evaluation Report S18010.06.09-114
Certificate ofAuthorization#9503 F1_2569-116
Revision 4: 05/22/2013
Page 3 of 8
rQ '
ER®
"'.
�fI�I�II
5.4.1 `Foam-On Tile" is limited to use of 3M 2-Component Foam Roof Tile Adhesive AH-160 unless
tensile adhesion/ long term aging data from an accredited testing laboratory is provided.
5.5 Allowable substrates are noted below:
5.5.1 Direct-Bond to Deck:
Lastobond Shield, Lastobond Pro HT-N, Lastobond Shield HT or Lastobond Pro HT-S applied
to:
➢ Plywood;
ASTM D41 primed plywood;
➢ OSB;
➢ ASTM D41 primed OSB;
Southern Yellow Pine;
ASTM D41 primed Southern Yellow Pine;
ASTM D41 primed structural concrete.
Lastobond TU, Lastobond, Lastobond 195, Lastobond ECO, Resisto Econo, Resisto LB1236,
Grip-Rite Eave & Valley Protector, Glacier Guard 100, Resisto LB1244 or Lastobond Smooth
Seal HT applied to:
➢ Plywood;
ASTM D41 primed plywood.
Colphene FR GR applied to:
➢ Plywood;
ASTM D41 primed plywood;
ASTM D41 primed structural concrete.
Note:
While not required over plywood, OSB or Southern Yellow Pine substrates, Soprema
recommends priming with Elastocol Stick or Elastocol 600c if the final roof cover is not
slated for installation within 24 hours.
Soprema requires tongue-and-groove board decking be covered with plywood or OSB prior
to installation of the self-adhering underlayment.
5.5.2 Bond-to-Insulation:
Lastobond Shield, Lastobond Pro HT-N, Lastobond Shield HT, Lastobond Pro HT-S or Colphene
FR GR applied to:
➢ DensDeck DuraGuard;
➢ DensDeck Prime;
➢ SECUROCK Gypsum-Fiber Roof Board.
For installation under mechanically attached prepared roof coverings, insulation shall be
attached per minimum requirements of the prepared roof covering manufacturer's Product
Approval. For installations under foam-on the systems, insulation attachment shall be
designed by a qualified design professional and installed based on testing of the
insulation/underlayment system in accordance with FM 4474, Appendix D or TAS 114,
Appendix 1.
5.5.3 Bond to Mechanically Attached Base Layer:
Lastobond Shield, Lastobond Pro HT-N, Lastobond Shield HT, Lastobond Pro HT-S or Colphene
FR GR applied to:
ASTM D226, Type I or II felt;
➢ Sopra-G;
Modified Sopra-G.
For installations under mechanically attached prepared roof coverings, base layer shall be
attached per minimum codified requirements. For installations under foam-on the systems,
base layer shall be attached per minimum requirements of FRSA/TRI 07320/8-05 or RAS 120.
Exterior Research and Design,LLC. Evaluation Report 518010.06.09-114
Certificate of Authorization#9503 FL2569-R6
Revision 4: 05/22/2013
Page 4 of 8
4.
TRIN11Y f.ERD
5.5.4 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: FRSA/TRI 07320
does not address wind uplift resistance of all underlayment systems beneath foam-on tile
systems, where the underlayment forms part of the load-path. The following wind uplift
limitations apply to underlayment systems that are not addressed in FRSA/TRI 07320 and are
used in foam-on tile applications. Maximum Design Pressure is the result of testing for wind
load resistance based on allowable wind loads. Refer to FBC 1609.1.5 for determination of
design wind pressures.
5.5.4.1 Maximum Design Pressure = -45.0 psf.
Deck: Min. 15/32-inch plywood to meet project requirements to satisfaction of AHJ.
Primer: (Optional) Elastocol Stick or Elastocol 600c
Underlayment: Colphene FR GR, self-adhered.
5.5.4.2 Maximum Design Pressure = -67.5 psf.
Deck: Structural concrete to meet project requirements to satisfaction of AHJ.
Primer: Elastocol 600c
Underlayment: .Colphene FR GR, self-adhered.
5.5.4.3 Maximum Design Pressure = -60.0 psf.
Deck: Min. 19/32-inch plywood to meet project requirements to satisfaction of AHJ.
Base Sheet: Sopra-G or Modified Sopra-G mechanically attached with. nails (FBC 1517.5.1)
and tin caps (FBC 1517.5.2) spaced 6-inch o.c. at the 4-inch laps and 6-inch
o.c. in three, equally spaced rows in the center of the sheet.
Underlayment: Colphene FR GR, self-adhered
5.5.4.4 Maximum Design Pressure = -90.0 psf.
Deck: Min. 19/32-inch plywood to meet project requirements to satisfaction of AHJ.
Underlayment: Unilay(e) mechanically attached with Soprafix Polymer Batten Bar (PBB) or
Soprafix Metal Batten Bar (MBB) with Soprema #15-EL fasteners spaced 6-
inch o.c. within the 5-inch wide, self-adhering side laps. End laps are 6-inch
wide and sealed using either heat-welding or hot-air welding techniques.
5.6 Exposure Limitations:
5.6.1 Lastobond TU, Lastobond Shield, Lastobond Pro HT-N, Lastobond, Lastobond 195,Lastobond
Eco, Lastobond Smooth Seal HT, Resisto Econo, Resisto LB1236, Grip-Rite Eave & Valley
Protector or Glacier Guard 100 or Resisto LB1244 shall not be left exposed for longer than 30-
days after installation.
5.6.2 Lastobond Shield HT or Lastobond Pro HT-S shall not be left exposed for longer than 90-days
after installation.
5.6.3 Colphene FR GR or Unilay(e) shall not be left exposed for longer than 180-days after
installation.
5.7 For tile roof installations governed by the FRSA/TRI 07320/8-05 Installation Manual, Fourth
Edition, use is limited to the following. Reference is made to the FRSA/TRI Technical Brief
titled "Florida High Wind Roof Tile Self-Adhered Underlayment Requirements as of
02/14/2011"for limitations for self-adhering underlayments used beneath tile roof systems.
Exterior Research and Design,LLC. Evaluation Report S18010.06.09-114
Certificate of Authorization#9503 FL2569-R6
Revision 4: 05/22/2013
Page 5 of 8
TRRINII-Yi ERD
Table 2:Tile S stem Options per FRSA/TRI 07320/8-05
System Underlay Section Reference Product(s)
Option
3.02A
1 Batten Modified Cap Sheet Unilay(e)
System One: onl
Mechanically Fastened 5 3.02E Self-Adhered Lastobond TU,Colphene FR GR
Tile, Unsealed or Underlayment
Sealed Underlayment Base Layer:ASTM D226,Type 1I;
System 6 3.02E No. 30/Self-Adhered Sopra-G; Modified Sopra-G
Underlayment Top Layer: Lastobond TU,Colphene FR
GR
4 3.02D Self-Adhered Lastobond TU,Colphene FR GR
System Two: Underlayment
Mechanically Fastened Base Layer: ASTM D226,Type II;
Tile,Sealed No. 30/Self-Adhered Sopra-G; Modified Sopra-G
Underlayment System 5 3.02E Underlayment Top Layer: Lastobond TU,Colphene FR
GR
1 3.02A Modified Cap Sheet Unila e
System Four"A"; Self-Adhered
Adhesive-Set Tile, 4 3.02D Underlayment
Colphene FR GR
Unsealed or Sealed Base Layer: ASTM D226,Type II;
Underlayment
Underlayment System 5 3.02E No. r /Self-Adhered Sopra-G; Modified Sopra-G
layment Top Layer: Colphene FR GR
System Four"B": 3 3.02C Self-Adhered Colphene FR GR
Adhesive-Set Tile, Underlayment
Sealed Underlayment No. 30/Self-Adhered Base Layer: ASTM D226,pra-Type Ii;
System 4 3.02D Underlayment Top
Modified Sopra-G
To Layer: Colphene FR GR
6. INSTALLATION:
6.1 Soprema Roof Underlayments shall be installed in accordance with Soprema published
installation requirements subject to the Limitations set forth in Section 5 herein and the
specifics noted below.
6.2 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the
substrate thoroughly to remove any dust and debris prior to application, and prime the
substrate with Elastocol Stick or Elastocol 600c (if applicable).
6.3 Lastobond TU Lastobond Shield Lastobond Pro HT-N. Lastobond Shield HT Lastobond Pro
HT-S, Lastobond Lastobond 195. Lastobond Eco, Lastobond Smooth Seal HT, Resisto Econo,
Resisto LB1236 Grip-Rite Eave & Valley Protector or Glacier Guard 100, Resisto LB1244 or
Colphene FR GR:
6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC
Sections 1507 for the type of prepared roof covering to be installed.
6.3.2 For non-tile applications:
6.3.2.1 While priming is optional, Soprema recommends priming with Elastocol Stick or Elastocol
600c if the final roof cover is not slated for installation within 24 hours.
6.3.2.2 Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel
back the first 3 ft of release film.
6.3.2.3 Adhere the exposed part to the substrate and unroll the remaining membrane as far as
possible.
6.3.2.4 Once the entire length of membrane is in place, peel-off the release film diagonally while
holding the membrane tight. Firmly roll the membrane into place to achieve a bond.
Exterior Research and Design, LLC. Evaluation Report S18010.06.09-R4
Certificate ofAuthorization#9503 FL2569-116
Revision 4: 05/22/2013
Page 6 of 8
'0
1 RI l (ERD
6.3.2.5 Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams
should be 6-inches and staggered not less than 2-ft from vertical seams in the course below.
All over-granule end-laps shall be sealed using either heat-welding or hot air welding
techniques.
6.3.2.6 When installing at slopes above 8:12, Soprema recommends back-nailing in the overlap area
at the top of the sheet at 12-inch o.c.
6.3.2.7 For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper
and center sheet over valley or ridge. Drape and press sheet into place, working from the
center of the valley or ridge in each direction. For valleys, apply the sheet starting at the
lowest point and work upward.
6.3.3 For tile applications:
6.3.3.1 Reference is made to FRSA/TRI 07320/8-05 Installation Manual, Fourth Edition, and Table 2
herein, using the instructions noted above as a guideline.
6.3.3.2 For Colphene FR GR in foam-on tile applications, reference is made to Section 5.5.4 herein
for wind resistance limitations.
6.3.3.3 Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the
underlayment.
6.4 Unilay(e):
6.4.1 For non-tile applications or nail-on, battened tile applications:
6.4.1.1 Reference is made to FRSA/TRI 07320/8-05 Installation Manual, Fourth Edition, and Table 2
herein.
6.4.1.2 Apply sheet parallel to the roof edge and, starting at the eave with the selvedge-edge
upslope, mechanically attach the 5-inch wide selvedge-edge to the wood deck with nails and
tin caps or round cap-nails spaced 36-inch o.c. Apply the second course in a water-shedding
manner with self-adhering side-laps. Vigorous hand or motorized roller pressure is applied to
the self-adhering laps to ensure a watertight application.
6.4.1.3 Vertical seams should be 6-inches and staggered not less than 2-ft from vertical seams in
the course below. All over-granule end-laps shall be sealed using either heat-welding or hot
air welding techniques.
6.4.1.4 Tile (if applicable) shall be loaded and staged in a manner that prevents tile slippage and/or
damage to the underlayment.
6.4.2: For foam-on tile applications:
6.4.2.1 Reference is made to FRSA/TRI 07320/8-05 Installation Manual, Fourth Edition, and Table 2
herein.
6.4.2.2 Apply sheet parallel to the roof edge and, starting at the eave with the selvedge-edge
upslope, mechanically attach the 5-inch wide selvedge-edge to the wood deck Soprafix
Polymer Batten Bar (PBB) or Soprafix Metal Batten Bar (MBB) with Soprema #15-EL
fasteners spaced 6-inch o.c. Apply the second course in a water-shedding manner with self-
adhering side-laps. Vigorous hand or motorized roller pressure is applied to the self-
adhering laps to ensure a watertight application.
6.4.2.3 Vertical seams should be 6-inches and staggered not less than 2-ft from vertical seams in
the course below. All over-granule end-laps shall be sealed using either heat-welding or hot
air welding techniques.
6.4.2.4 Tile (if applicable) shall be loaded and staged in a manner that prevents tile slippage and/or
damage to the underlayment.
Exterior Research and Design,LLC. Evaluation Report 518010.06.09-114
Certificate of Authorization#9503 FL2569-R6
Revision 4: 05/22/2013
Page 7 of 8
11111J
TRIi1Y
ER®
7. LABELING:
Each unit shall bear a permanent label with the manufacturer's name, logo, city, state and logo of the
Accredited Quality Assurance Agency noted herein.
S. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having 3urisdiction in order to properly evaluate the
installation of this product.
9. MANUFACTURING PLANTS:
Contact the manufacturer or the named QA entity for information on plants covered under Rule 9N-3
QA requirements.
10. QUALITY ASSURANCE ENTITY:
UL, LLC— QUA9625; (314) 578-3406; k.chancellor@us.ul.com
- END OF EVALUATION REPORT-
Exterior Research and Design, LLC. Evaluation Report S18010.06.09-114
Certificate of Authorization#9503 FL2569-R6
Revision 4: 05/22/2013
Page 8 of 8