HomeMy WebLinkAboutProduct Approval (2) odda Building Code Online haps://www.floridabuilding.org/pr/pr_app ti-aspx?pamm=wGEVX.--
7-
r'
"T;''!li SCLS Home Log to User Regtstretbn 'Hot Topks Suomt Surcharge Stats&Facts Pubkatbns FBC Staff SCIS Site Map Unks Search
BUSlC1eSsf.' �,
Product Approval PY
Prafes$ional i} .t,USER:➢ublcUser
C'it;g,1k
ltiitdiilYYitiit ENARgl,&pro al ploy>?14A{c rAppFcion Sgah+G,h>9pp4c�.tlon�>APDiatioo Oetai
r FL# !916048-R3
Application Type Revision
Code Version 2014
Application Status Approved
Comments
Archived
Product Manufacturer TRI-BUILT Roofing Products
Address/Phone/Emall 9050 Louisiana Street
Merrillville,IN 46410
(201)842-2449
david.raiz@ tribuiltmaterialsg roup.com
Authorized Signature David Ruiz
david.ruiz@tribuiltmaterialsgroup.com
Technical Representative David Ruiz
Address/Phone/Email 250 Route 17 North
East Rutherford, N3 07073
(201)842-2449
david.ruiz@tribuiltmateriaisgroup.com
Quality Assurance Representative
Address/Phone/Email
Category Roofing
Subcategory Underlayments
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed
Florida Professional Engineer
Evaluation Report-Hardcopy Received
Florida Engineer or Architect Name who developed Robert Nieminen
the Evaluation Report
Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Contract Expiration Date 10/16/2017
Validated By Sohn W.Knezevich,PE
Validation Checklist-hardcopy Received
Certificate of Independence EL16048 R3 COI 2015 02 COi Nieminen,pdf
Referenced Standard and Year(of Standard) Stands Year
ASTM D1970 2009
ASTM G155 2005
FRSA/TRI April 2012(04-12) 2012
TAS 103 1995
1 of 2 5/24/2016 9:58 ANI
.orida BgildingCode Online https://www.flolidabuilding.org/pr/pr app dd.aspx?pamm=wGEVX...
Equivalence of Product Standards
Certified By
Sections from the Code
Product Approval Method Method 1 Option D
Date Submitted 10/08/201S
Date Validated 10/19/2015
Date Pending FBC Approval 10/21/2015
Date Approved 12/15/2015
Summary of Products
.-_.._
1 FL# Model,Number or Name Description
16048.1 I TRI-BUILT Roof Underlayments�;Self-adhering,modified bitumen roof underlayments —j
j Umits of use Installation Instructions
Approved for use in HVHZ:No i FL5 10 FILgALER „-TRI-
? Approved for use outside HVHZI Yes !8UtLT UNDERLAYMENT__-.S FLIT 048-93,pdf
! impact Resistant:N/A j Verified By:Robert Nieminen PE-59166
Design Pressure:+N/A/-45 { Created by Independent Third Party:Yes
Other: 1.)The design pressure noted herein pertains to use I Evaluation Reports
of foam-on tide systems overtop the self-adhering FL16048 R3 AE 2015Jt9 FINAL ER TRI-
;underlayment for one particular application.See ER Section BUILT UNDERLAYMENTSF216046 8-R3.pdf
5.6 for details. 2.)Refer to ER Section 5 for other Limits of Created by Independent Third Party:Yes i
Use. ;
aaad
=acLI)s::1940 North Monroe 5(reet Tal4�hacceP,.fi 32 ?P.ltos�BSO-dal 1624
The State of Florida Is an AA/EEO employer.�pyll9ht 82 U7-zpl�4tate of fbrYfa ::giyary statement:;A=saftKy%atement::Refuntl State ,m
Under Florida law,emal addresses are public records,if you do not want yours-mag address released In response to a puburrecords request,do not send electronlc
mar to this entity,instead,contact the office by phone or by traditional mag.7 you have any questions,please contact 850.487.1395."Pursuant to Section
455.275(1),Florida Statutes,effective october 1,2012,kensees licensed under Chapter 455,F.S.must provide the Department with an emall address f they have
one.The emacs provided may be used for offtiai communication wth the kensee,,However emall addresses are public record.N you do not wish to supply a
personal address,please provide the Department with an emat address which can be made available to the public.Tb determine K you are a kensee under Chapter
455,F.S.,please click JWM.
Ptoduct Approval ACcopts:
C
2 of 2 5/24/2016 9:58 AM
EXTERIOR RESEARCH&DESIGN,I.I.C.
Certificate of Authorization#19503
� � � 353 CHRISTIAN STREET,UNIT#13
ERD OXFORD,CT 06478
PHONE:(203)262-9245
FAX:(203)262-9243
EVALUATION REPORT
Allied Building Products Corp. Evaluation Report A42960.10.12-R3
dba TRI-BUILT Roofing Products F11.16048-113
9050 Louisiana Street Date of Issuance:10/25/2012
Merrillville, IN 46410 Revision 3: 10/08/2015
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The
products described herein have been evaluated for compliance with the 5`" Edition (2014) Florida Building Code
sections noted herein.
DESCRIPTION: TRI-BUILT Roof Underlayments
LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
herein.
CONTINUEOCOMPUANCE: This Evaluation Report is valid until such time as the named product(s)changes,the referenced
Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of
this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product
changes or the referenced Quality Assurance documentation changes. Trinity ERD requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity)ERD Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety.
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages 1 through 5.
Prepared by:
''• s�....... ,'' The facsimile seal appearing was authontedbyRobert Nieminen.
Robert J.M.Nieminen,P.E.
.l1„7 �,,.. P.E.on 10/08/2015.This does not serve as an electronically signed
Florida Registration No.59166,Florida DC4ANE1983 document.Signed,sealed hardcopleshave been transminedtothe
Product Approval Administrator and to the named client
CERTIFICATION OF INDEPENDENCE:
1. Trinity IERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. Trinity I ERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way,the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained
specifically for that purpose.
TRINITY .ERD
ROOFING COMPONENT EVALUATION:
1. SCOPE:
Product Category: Roofing
Sub-Category: Underlayment
Compliance Statement: TRI-BUILT Roof Underlayments, as produced by TRI-BUILT, have demonstrated compliance
with the following sections of the Florida Building Code through testing in accordance with the following Standards.
Compliance is subject to the Installation Requirements and Limitations/Conditions of Use set forth herein.
2. STANDARDS:
Section Property Standard Year
1507.2.4,1507.2.8,1507.2.9.2, Physical Properties ASTM D1970 2009
1507.4.5.1,1507.5.3,1507.7.3
1504.6 Accelerated Weathering ASTM G155 2005
1507.3.3 Installation Practice FRSA/TRI April 2012(04-12) 2012
1523.6.5.2.1 Physical Properties TAS 103 1995
3. REFERENCES:
Eniily Examination Reference Date
ERD(TST6049) Physical Properties 540540.02.13-1 02/19/2013
ERD(TST6049) Physical Properties 540540.11.13 11/19/2013
ERD(TST6049) Physical Properties 540540.03.14 03/26/2014
ERD(TST6049) Physical Properties 544870.04,14-2 04/02/2014
ERD(TST6049) Physical Properties 544870.04.14-3 04/02/2014
ERD(TST6049) Physical Properties 544870.04.14-1 04/10/2014
ERD(TST6049) Physical Properties 544870.04.14-4 04/10/2014
ERD(TST6049) Physical Properties 543530.02.14-1-R3 05/14/2014
ERD(TST6049) Physical Properties 543530.05.14 05/28/2014
ERD(TST6049) Physical Properties 540540.10.14 10/31/2014
ERD(TST6049) Physical Properties SC7645.02.15 02/13/2015
ERD(TST6049) Accelerated Weathering SC8520.04.15 05/27/2015
UL,LLC.(QUA9625) Quality Control Multiple-Listing R16814 09/04/2015
UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.10/16/2017
4. PRODUCT DESCRIPTION:
4.1 Self-Adherina Underlayments:
4.1.1 Tri-Built Sand-11 SA Shingle Underlayment is a self-adhering, glass-mat reinforced, sand-surfaced, SBS
modified bitumen roof underlayment,with a 36-inch sheet width.
4.1.2 Tri-Built S/A HT TU.Underlayment is a self-adhering, non-woven polyester fabric surfaced, SBS modified
bitumen roof underlayment
4.1.3 Tri-Built Smooth HT S/A Underlayment is a self-adhering,glass-mat reinforced,film-surfaced,SBS modified
bitumen roof underlayment.
S. LIMITATIONS:
5.1 This is a building code evaluation. Neither Trinity I ERD nor Robert Nieminen, P.E. are, in any way, the
Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was
used for permitting or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in the HVHZ.
5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials
Directory for fire ratings of this product.
Exterior Research and Design,I.M. Evaluation Report A42960.10.12-R3
Certifkate of Authorisation#9503 F1.76048-113
Revision 3:10/08/2015
Page 2 of 5
TRIM ER®
5.4 . TRI-BUILT Roof Underlayments may be used with any prepared roof cover where the product is specifically
referenced within FBC approval documents. If not listed, a request may be made to the AHJ for approval
based on this evaluation combined with supporting data for the prepared roof covering.
5.5 Allowable roof covers applied atop the underlayments are as follows:
TABLE 1: ROOF COVER OPTtoNs
Underlayment Asphalt Nall-On Tile Foam-On Tile Metal Wood Shakes Slate
Shingles &Shingles
Tri-Built Sand-R SA Shingle Yes No No No Yes Yes
Underlayment
Tri-Built S/A HT TU Yes Yes Yes Yes Yes Yes
Underlayment See 5.5.1
Tri-Built Smooth HT S/A Yes No No Yes Yes Yes
Underlayment
5.5.1 "Foam-On Tile" Is limited to use of the following Approved tile adhesives unless tensile adhesion/ long
term aging data from an accredited testing laboratory is provided.
y Tri-Built S/A HT TU Underlayment with 3M12-Component Roof Tile Adhesive AH-160(FL6332)or Dow
TileBondTM'Roof Tile Adhesive(FL717)
5.6 Allowable substrates are noted below:
5.6.1 Direct-Bond to Deck:
Tri-Built Sand-R SA Shingle Underlayment, Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment applied to:
Y Plywood; ASTM D41 primed plywood; OSB; ASTM D41 primed OSB; ASTM D41 primed structural
concrete.
While not required over plywood,OSB or Southern Yellow Pine substrates,TRI-BUILT recommends priming
the deck if the final roof cover is not slated for installation within 24 hours. Note: TRI-BUILT requires
tongue-and-groove board decking be covered with plywood or OSB prior to installation of the self-
adhering underlayment.
5.6.2 Bond-to-Insulation:
Tri-Built S/A HT TU Underlayment applied to:
Dens Deck Prime;SECUROCK Gypsum-Fiber Roof Board.
For installation under mechanically attached prepared roof coverings, insulation shall be attached per
minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations
under foam-on tile systems,insulation attachment shall be designed by a qualified design professional and
installed based on testing of the insulation/underlayment system in accordance with FM 4474,Appendix D
or TAS 114,Appendix J.
5.6.3 Bond to Mechanically Attached Base Layer:
)�- ASTM 0226,Type I or II felt.
For installations under mechanically attached prepared roof coverings, base layer shall be attached per
minimum codified requirements. For installations under foam-on the systems,base layer shall be attached
per minimum requirements of FRSA/TRI April 2012(04-12).
Exterior Research and Design,U.C. Evaluation Report A42960.10.12-R3
certivicaee of Authorization#9503 FL16048-113
Revision 3:10/08/2015
Page 3 of 5
5.6.4 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: FRSA/TRI April 2012 (04-12)
does not address wind uplift resistance of all underlayment systems beneath foam-on tile systems,where
the underlayment forms part of the load-path. The following wind uplift limitations apply to direct-deck
underlayment systems that are not addressed in FRSA/TRI April 2012(04-12)and are used in foam-on tile
applications. Maximum Design Pressure is the result of testing for wind load resistance based on
allowable wind loads, and reflects the ultimate passing pressure divided by 2(the 2 to 1 margin of safety
per FBC 1504.9 has already been applied). Refer to FBC 1609 for determination of design wind pressures.
5.6.4.1 Maximum Design Pressure=-45.0 psf.
Deck: Min. 15/32-inch plywood to meet project requirements to satisfaction of AHJ.
Primer: (Optional)ASTM D41
Underlayment: Tri-Built S/A HT TU Underlayment,self-adhered.
5.7 Exposure Limitations:
5.7.1 Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left
exposed for longer than 30-days after installation
5.7.2 Tri-Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation.
6. INSTALLATION:
6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT published installation
requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below.
6.2 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly
to remove any dust and debris prior to application,and prime the substrate(if applicable).
6.3 Tri-Built Sand-R SA Shingle Underlavment,Tri-Built SIA HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment:
6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections
1507 for the type of prepared roof covering to be installed.
6.3.2 Non-Tile applications:
While priming is optional, TRI-BUILT recommends priming the deck if the final roof cover is not slated for
installation within 24 hours.
Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3
ft of release film.
Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible.
Once the entire length of membrane is in place, peel-off the release film diagonally while holding the
membrane tight. Firmly roll the membrane into place to achieve a bond.
Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6-
inches and staggered not less than 2-ft from vertical seams in the course below. All over-granule end-laps
shall be sealed using either heat-welding or hot air welding techniques.
When installing at slopes above 8:12, Allied Building Products Corp recommends back-nailing in the
overlap area at the top of the sheet at 12-inch o.c.
For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper and center sheet
over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in
each direction. For valleys,apply the sheet starting at the lowest point and work upward.
6.3.3 Tile Applications(Tri-Built S/A HTTU Underlayment only):
Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the
instructions noted above as a guideline.
Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the
underlayment.
Exterior Research and Design,LLC_ Evaluation Report A42960.10.12-R3
[eallkate of Authorkadon#9503 FL16048-R3
Revision 3:10/08/2015
Page 4 of 5
TRIM ERD
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of
this product.
S. MANUFACTURING PLANTS:
Contact the noted QA agency for information on product locations covered for F.A.C.Rule 9N-3 QA requirements.
9. QUALITY ASSURANCE ENTITY:
UL,LLC—QUA9625;(314)578-3406;k.chancellor@us.ul.com
-END OF EVALUATION REPORT-
Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-R3
Certilkate oJAathorkodan OS03 FL16048-R3
Revision 3:10/08/2015
Page 5 of 5