HomeMy WebLinkAboutProduct Approval (2) Florida Building Code Online Page 1 of 2
Business & Professional Regulation
+
&,fl'L rA
SCIS Home Lop In User Registration ! Hot Topics i Submit Surcharge Stats&Facts Publications ! FSC Staff i SCIS Site Map f Links ; Search t
F 'da
. r �jr Product Approval
USER:Public User
Product Approval Menu>P or Applicatbn Search>Application List>Application D"I i R E C E I i j`CLQ��D
FL# FL5259-R25 �/6i
Application Type Revision E� [e�nan
Code Version 2014 uu 10
Application Status Approved PERMITTING
St. Lucie County,FL
Comments
Archived
Product Manufacturer POLYGLASS USA
Address/Phone/Email 150 Lyon Drive
Fernley,NV 89408
(570)384-1230 Ext 242
jakins@ polyglass.com
Authorized Signature lames Akins
jakins@polyglass.com
Technical Representative Steve Wadding
Address/Phone/Email 150 Lyon Drive
Fernley,NV 98408
(602)363-7139
stevew@polygiass.com
Quality Assurance Representative lames Akins
Address/Phone/Email 555 Oakridge Road
Humboldt Industrial Pkwy
Hazleton,PA 18201
(800)894-4563
jalCins@polyglass.com
Category Roofing
Subcategory Underlayments
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed
Florida Professional Engineer
Di Evaluation Report-Hardcopy Received
Florida Engineer or Architect Name who developed Robert Nieminen
the Evaluation Report
Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Contract Expiration Date 04/24/2018
Validated By John W.Knezevich,PE
Validation Checklist-Hardcopy Received
Certificate of Independence FL-5259 R25 COI 2016 01 COI Nieminen.odf
Referenced Standard and Year(of Standard) Standard Year
ASTM D1970 2009
ASTM D226 2006
ASTM D6164 2005
ASTM D6222 2008
ASTM G154 2006
ASTM G155 2005
FM 4474 2004
https://floridabuilding.org/-or_app_dtl.aspx?param=wGEVXQwtDgvbS-AaZp3Crk2vS... 12/29/2016
Florida Building Code Online Page 2 of 2
FRSA/TRI April 2012 2012
TAS 103 1995
UL 1897 2004
Equivalence of Product Standards
Certified By
Sections from the Code
Product Approval Method Method 1 Option D
Date Submitted 10/17/2016
Date Validated 10/18/2016
Date Pending FBC Approval 10/19/2016
Date Approved 12/15/2016
Summary of Products
FL# Model,Number or Description
Name
5259.1 Polygiass Roof Roofing underiayments
Underlayments
Limits of Use Installation Instructions
Approved for use in HVHZ:No FL5,259 R25 II 2016 10 FINAL ER POLYGLASS UNDERLAYMENTS FL5259-
Approved for use outside HVHZ:Yes R25,odf
Impact Resistant:N/A Verified By:Robert Nieminen PE-59166
Design Pressure:+N/A/-6225 Created by Independent Third Party:Yes
Other: 1.)The design pressure in this Evaluation Reports
application relates to one particular FL5259 R25 AE 2016 10 FINAL ER POLYGLASS UNDERLAYMENTS FL5259-
underlayment system(over concrete R25.Ddf
deck)for use under foam-on tile systems Created by Independent Third Party:Yes
(where the underlayment forms part of
the load-path).Refer to ER Section 5.6.4
for other systems,other deck types and
associated maximum design pressures.
2.)Refer to ER Section 5 for other limits
of use.
Back Nett
Contact Us:;2601 Blair Stone Road_Tallahassee FL 32394 Phone:850-07-1824
The State of Florida is an WEED employer.Copyright 2007-2013 cUla of Florida.::Privacy Statement::Accessibility Statement::Refund cratemen
Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send
electronic mall to this entity.Instead,contact the office by phone or by traditional mail.If you have arty questions,please contact 850.487.1395.*Pursuant to
Section 455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if
they have one.The emaiis provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to
supply a personal address,please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under
Chapter 455,F.S.,please c8dc hM.
Product Approval Accepts:
HE 1�0
1110 LIM
Credit Card
Safe
https://floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVXQwtDgvbSgAaZp3 Crk2vS... 12/29/2016
EXTERIOR RESEARCH&DESIGN,LLC.
\ Certificate ofAuthorization#9503
3�3�HANSTMEE� UNIT#13���
I TRINITY,
'
OXFORD CT 06478
|
PHONE,(203)262-924S
FAX:(2O3)2G2-9243
EWAlWA71ON REPORT
Polyglass USA,Inc. Evaluation Report P12060.02.09-R21
1S0Lyon Drive FLS259-R25
Fernley, NVD84Dg Date mfIssuance:N2/24/2009
.
Revision 21:10/17/2016
'
SCOPE:
This Evaluation Report is issued under Mw|e 61G20-3 and the opdba6|e rules and regulations governing the use of
construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E.
for use ofthe product under the Florida Building Code and Florida Building Code, Residential Volume. The products
described herein have been evaluated for compliance with the 5th Edition (2014) Florida Building Code sections noted
herein.
0ssCmpTIom: Polyglaos Roof Underlaymmants
kAosuwG: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced
Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance mfthis
Evaluation Report by the named client constitutes agreement to notify Robert Nieminen,P.E. if the product changes or the
referenced Quality Assurance documentation changes. Trin|ty|EROrequires acomplete review ofthis Evaluation Report
relative toupdated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words °Trinhy|ERD Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety.
INSPECTION: Upon request,a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its
distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists ofpages 1through 13.
Prepared by:
The facsimile sea[appearing was authorized uvRobert mlemmwn,
� P.s.vnuV17/2uxsThis does not serve a,a"electronically
Robert J.M,N&emmlnan,P.E. signed document Signed,sealed xardcomieohave been
�o���to Product
' named client
CER'nncATIOmopINDEPENDENCE:
1. ThnityJGRDdoem not have, nor does itintend tuacquire orwill it acquire, a financial interest inany company manufacturing or
distributing products itevaluates.
Z. Trinity I ERD Is not owned,operated or controlled by any company manufacturing or distributing products It evaluates,
3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the
product.
S. This|sabuilding code evaluation. Neither Trinityl ERD nor Robert Nieminen, P.E. are,in any way,the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained
specifically for that purpose.
iERD
TRINITY
ROOFING COMPONENT EVALUATION:
1. SCOPE:
Product Category. Roofing
Sub-Category: Underlayment
Compliance Statement: Roof Underlayments, as produced by Polyglass USA, Inc., have demonstrated compliance with the
following sections of the Florida Building Code through testing in accordance with the following Standards. Compliance is
subject to the installation Requirements and Limitations/Conditions of Use set forth herein.
2. STANDARDS:
Section Prope Standard Year
1504.3.1 Wind Uplift FM 4474 2004
1504.3.1 Wind Uplift UL 1897 2004
1504.6 Accelerated Weathering ASTM G154 2006
1504.6 Accelerated Weathering ASTM G155 2005
1507.2.3,1507.3.3,1507.5.3,1507.7.3, Physical Properties ASTM D226 2006
1507.8.3,1507.9.3
1507.2.4,1507.2.9.2,1507.5.3,1507.7.3 Physical Properties ASTM D1970 2009
1507.11.2 Physical Properties ASTM D6164 2005
1507.11.2 Physical Properties ASTM D6222 2008
1507.3.3 Installation Practice FRSAITRI April 2012 2012
1523.6.5.2.1 Physical Properties TAS 103 1995
3. REFERENCES:
gattit Examination Reference Date
FM Approvals(TST 1867) Wind Uplift 3004091 01/12/2000
PRI(TST 5878) Physical Properties PRIO1111 04/08/2002
PRI(TST 5878) Physical Properties PUSA-005-02-01 01/31/2002
PRI(TST 5878) Physical Properties PUSA-013-02-01 12/23/2002
PRI(TST 5878) Physical Properties PUSA-013-02-02 12/23/2002
PRI(TST 5878) Physical Properties PUSA-013-02-03 12/23/2002
PRI(TST 5878) Physical Properties PUSA-018-02-01 07/14/2003
PRI(TST 5878) Physical Properties PUSA-028-02-01 07/13/2005
PRI(TST 5878) Physical Properties PUSA-033-02-01 01/12/2006
PRI(TST 5878) Physical Properties PUSA-035-02-01 09129/2006
PRI(TST 5878) Physical Properties PUSA-055-02-02 12/10/2007
PRI(TST 5878) Physical Properties PUSA-061-02-02 01/28/2008
PRI(TST 5878) Physical Properties PUSA-076-02-01 02/22/2008
PRI(TST 5878) Physical Properties PUSA-083-02-01 04/14/2008
PRI(TST 5878) Physical Properties PUSA-088-02-01 07/29/2009
MTI(TST 2508) Physical Properties JX20H7A 04/01/2008
MTI(TST 2508) Physical Properties RX14E8A 01/29/2009
ERD(TST 6049) Physical Properties 11752.09.99-1 02/09/2000
ERD(TST 6049) Wind Uplift 11757.08.01-1 08/13/2001
ERD(TST 6049) Wind Uplift 11776.06.02 01/16/2003
ERD(TST 6049) Physical Properties 02200.07.03 07/14/2003
ERD(TST 6049) Wind Uplift P1740.01.07 01/04/2007
ERD(TST 6049) Physical Properties P5110.04.07-1 04/11/2007
ERD(TST 6049) Wind Uplift P9260.03.08 03/21/2008
ERD(TST 6049) Physical Properties P134S0.08.09 08/13/2009
ERD(TST 6049) Wind Uplift P30540.11.09-R1 11/30/2009
ERD(TST 6049) Physical Properties P11030.11.09-1 11/30/2009
ERD(TST 6049) Wind Uplift P11030.11.09-2 11/30/2009
ERD(TST 6049) Physical Properties P11030.11.09-3 11/30/2009
ERD(TST 6049) Physical Properties P33360.06.10 06/25/2010
Exterior Research and Design,LLC. Evaluation Report P12060.02.09-R21
Certificate of Authorization#9503 F8C NON-HVHZ EVALUATION FLS2S9-R2S
Revision 21:10/17/2016
Page 2 of 13
"[TRINITYIERD
inti v Examination Reference at
ERD(TST 6049) Physical Properties P33370.03.11 03/02/2011
ERD(TST 6049) Physical Properties P33370.04.11 04/26/2011
ERD(TST 6049) Physical Properties P37300.10.11 10/19/2011
ERD(TST 6049) Physical Properties P40390.08.12-1 08/06/2012
ERD(TST 6049) Physical Properties P40390.08.12-2 08/07/2012
ERD(TST 6049) Physical Properties C41420.09,12-3 09/11/2012
ERD(TST 6049) Wind Uplift P39680.03.13 03/04/2013
ERD(TST 6049) Physical Properties P45370.04.13 04/26/2013
ERD(TST 6049) Wind Uplift P1738.02.07-R2 04/29/2013
ERD(TST 6049) Wind Uplift 11757.04.01-1-111 04/30/2013
ERD(TST 6049) Wind Uplift P41630.08.13 08/06/2013
ERD(TST 6049) Wind Uplift P11751.05.03-RI 11126/2013
ERD(TST 6049) Wind Uplift P11781.11.03-111 11/26/2013
ERD(TST 6049) Physical Properties P45270.05.14 05/12/2014
ERD(TST 6049) Physical Properties 6020.07.14-1 09/08/2014
ERD(TST 6049) Physical Properties 6020.09.14-2 09/08/2014
ERD(TST 6049) Physical Properties 6020,09.14-3 09/08/2014
ERD(TST 6049) Physical Properties 6020,09.14-4 09/08/2014
ERD(TST 6049) Physical Properties 6020,09.14-5 09/08/2014
ERD(TST 6049) Physical Properties 6020.09.14-6 09/08/2014
ERD(TST 6049) Physical Properties P46520.10.14 10/03/2014
ERD(TST 6049) Physical Properties P44360.10.14 10/07/2014
ERD(TST 6049) Physical Properties P43290.10.14 10/17/2014
ERD(TST 6049) Physical Properties PLYG-SC7550.03.15 03/24/2015
ERD(TST 6049) Physical Properties P40390.04.15 04/03/2015
ERD(TST 6049) Physical Properties PLYG-SC8080.05.15-1 05/20/2015
ERD(TST 6049) Wind Uplift PLYG-SC8905.05.16-1 05/17/2016
ERD(TST 6049) Physical Properties PLYG-SC8080.07.16 07/16/2016
ERD(TST 6049) Wind Uplift PLYG-SC12025.10.16 10/12/2016
ICC-ES(EVL 2396) 18C Compliance ESR-1697 11/01/2014
Miami-Dade(CER 1592) HVHZ Compliance NOA 14-0717.08 01/22/2015
Polyglass USA Manufacturing Affidavit Products Current 02/18/2009
Polyglass USA P/L Affidavit Mule-Hide Cross Ltg 03/01/2008
Polyglass USA Materials Affidavit Polystick SA Compound 08/18/2011
UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.04/24/2018
4. PRODUCT DESCRIPTION:
4.1 Mechanically Fastened Underlayments:
4.1.1 Elastobase is a fiberglass reinforced,SBS modified bitumen base sheet.
4.1.2 Elastobase P is a polyester-reinforced,SBS modified bitumen base sheet,
4.1.3 Polyglass G2 Base is a fiberglass-reinforced,asphaltic base sheet.
4.1.4 Polyglass APP Base is a fiberglass-reinforced,APP modified bitumen base sheet.
4.2 —Self-Adhering Underlayments:
4.2.1 Polystick MTS is a nominal 60-mil thick rubberized asphalt waterproofing membrane,glass fiber reinforced,surfaced
with polycilefinic film surface;meets ASTM D1970 and TAS 103.
4.2.2 Polystick MTS PLUS is a nominal 60-mil thick rubberized asphalt waterproofing membrane, glass fiber reinforced,
surfaced with poly-film surface;meets TAS 103.
4,23 Polystick IR-Xe is a nominal 60-mil thick rubberized asphalt waterproofing membrane,glass fiber reinforced,with an
aggregate surface;meets ASTM D1970.
Exterior Research and Design,LLC. Evaluation Report P12060.02.09-R21
Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION FL5259-R2S
Revision 21:10/17/2016
Page 3 of 13
b�
\, TR1N11 Y j ERD
4.2.4 Polystick TU Plus is a nominal 80-mil thick rubberized asphalt waterproofing membrane,glass fiber reinforced,with a
polyester fabric surface;meets ASTM D1970 and TAS 103.
4.2.5 Polystick TU P is a nominal 130-mil thick rubberized asphalt waterproofing membrane, glass-fiber/polyester
reinforced,with a granular surface;meets ASTM D1970 and TAS 103.
4.2.6 Polystick TU Max is a nominal 60-mil thick rubberized asphalt waterproofing membrane with a 190 g/m2 polyester
fabric surface;meets ASTM D1970 and TAS 103.
4.2.7 Polyflex SAP, Polyflex SAP FR, Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet (FR) are polyester
reinforced,APP modified bitumen cap sheets;meet ASTM D6222.
4.2.8 Polystick Dual Pro"" is a nominal 60-mil thick dual-layer rubberized asphalt waterproofing membrane, fiberglass
reinforced,with a polyester fabric surface;meets ASTM D1970.
4.2.9 Polystick Tile Pro'" is a nominal 60-mil thick dual-layer rubberized asphalt waterproofing membrane, fiberglass
reinforced,with a polyester fabric surface;meets ASTM D1970 and TAS 103.
4.2.10 Polystick MU-X is a nominal 54-mil thick dual-layer rubberized asphalt waterproofing membrane, fiberglass
reinforced,with a polypropylene film surface;meets AC188 and physical requirements of ASTM D1970.
4.3 Mechanically Fastened and/or Bonded Underiavments:
4.3.1 Elastoflex S6 G and Eiastoflex S6 G FR are polyester reinforced,SBS modified bitumen cap sheets;meet ASTM D6164.
4.3.2 Polyflex G and Polyflex G FR are polyester reinforced,APP modified bitumen cap sheets;meet ASTM D6222.
S. LIMITATIONS:
5.1 This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way,the Designer of
Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or
design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in the HVHZ.
5.3 Fire Classification is not part of this Evaluation Report;refer to current Approved Roofing Materials Directory for fire
ratings of this product.
5.4 Polyglass Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced
within FBC approval documents. If not listed, a request may be made to the Authority Having Jurisdiction for
approval based on this evaluation combined with supporting data for the prepared roof covering.
5.5 Allowable Roof Covers:
v"T�a121."RooF WVpt OPTi+iVs r
F
Underlayment Asphalt Shingles Nail-On Tile Foam-On Tile Metal wood Shakes 5&Shingles
Slate
Yes Yes
Elastobase Yes (base sheet in 2-pry (base sheet In 2-pry Yes Yes Yes
system) system)
Yes Yes
Elastobase P Yes (base sheet in 2-pry (base sheet in 2-pry Yes Yes Yes
system) system)
Yes Yes
Polyglass G2 Base No (base sheet in 2-pry (base sheet in 2-ply No No No
system) system)
Yes Yes
Polyglass APP Base No (base sheet to 2-0y (base sheet in 2-ply No No No
system) system)
Polystick MTS Yes Yes No Yes Yes Yes
Polystick MTS PLUS Yes Yes No Yes Yes Yes
Polystick IR-Xe Yes No No No Yes Yes
Polystick TU P Yes Yes Yes No Yes Yes
See 5.5.1
Polystick TU Plus Yes Yes Yes Yes Yes Yes
see 5.5.1
Exterior Research and Design,I.I.C. Evaluation Report P12060.02.09-R21
Certificate of Authorization 119503 FBC NON-HVHZ EVALUATION FL5259-R2S
Revision 21:10/17/2016
Page 4 of 13
TRINITY JERD
TABi.E'1;4 F,LOVEIt OFTfQNS
Underlayment Asphalt shingles Nail-On Tile Foam-On Tile Metal Wood Shakes& Slate
Shingles
Polystick TU Max No Yes Yes Yes No No
See 5.5.1
Polystick Dual Pro Yes Yes No Yes Yes Yes
Polystick Tile Pro Yes Yes Yes Yes Yes Yes
See 5.5.1
Polystick MU-X Yes No No Yes Yes Yes
Elastoflex S6 G Yes Yes Yes No Yes Yes
See 5.5.1
Elastoflex S6 G FR Yes Yes No No Yes Yes
Polyflex G Yes Yes Yes No Yes Yes
See 5.5.1
Polyflex G FR Yes Yes No No Yes Yes
Po"ex SAP or SAP FR Yes Yes Yes No Yes Yes
See 5.5.1
Mule-Hide SA-APP Cap Sheet yes Yes Yes No Yes Yes
or SA-APP Cap Sheet(FR) See 5.5.1
5.5.1 "Foam-On Tile" Is limited to use of the following Approved tile adhesives unless tensile adhesion i long term aging
data from an accredited testing laboratory is provided.
✓ 3M1 2-Component Roof Tile Adhesive AH-160 (FL6332): Polystick TU P, Polystick TU Plus, Polystick TU Max,
Elastoflex S6 G, Polyflex G, Polyflex SAP, Polyflex SA Cap FR, Mule-Hide SA-APP Cap Sheet or Mule-Hide SA-APP
Cap Sheet(FR)or Tile Pro.
✓ 3M'" Foam Roof Tile Adhesive RTA-1(F16276): Polystick TU P,Polystick TU Plus, Polystick TU Max,Elastoflex S6
G, Polyflex G, Polyflex SAP,Polyflex SA Cap FR,Mule-Hide SA-APP Cap Sheet or Mule-Hide SA-APP Cap Sheet(FR)
or Tile Pro
✓ Convenience Products'Touch'n Seal Storm Bond Roof Tile Adhesive(FL14506): Polystick TU Plus, Polystick TU
Max.
✓ Dow TileBond(FL717): Polystick TU P,Polystick TU Plus,Polyflex SAP or Tile Pro.
✓ Polyglass Polylok Roof Tile Adhesive(FL17855): Polystick TU Plus or Polystick TU Max.
5.6 Allowable Substrates:
5.6.1 Direct-Bond to Deck:
Polystick(all variations),Dual Pro,Tile Pro,Polyflex SAP or SAP FR,Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet
(FR)self-adhered to:
➢ New untreated plywood;ASTM D41 primed new untreated plywood; Existing plywood;ASTM D41 primed existing
plywood; New or existing, unprimed OSB; ASTM D41 primed OSB; Southern Yellow Pine; ASTM D41 primed
Southern Yellow Pine; ASTM D41 primed structural concrete; Huber Engineered Woods "ZIP System" Panels
(designed and Installed to meet wind loads for project).
Note:Polyglass does not require priming of new or existing plywood or OSB sheathing. New or existing plywood or
OSB sheathing should be cleaned of all dirt and debris prior to application of Polystick membranes.
Elastoflex S6 G or S6 G FR in hot asphalt to:
ASTM D41 primed structural concrete.
Polyflex G or G FR torch-applied to:
➢ ASTM D41 primed structural concrete.
Exterior Research and Design,I.I.C. Evaluation Report P12060.02.09-R21
Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION FL5259-R25
Revision 21:10/17/2016
Page 5 of 13
`J URNIU U ���|��x�'
5.6.2
Polysdck(all vahabons), PnlyOexSAP nrSAP FR, Mule-Hide SA-APP CapShaetnrSA'APPCapSheet(RR)seK-adhered
to:
> A5TMI C1289\ Type U, Class 1 po|y|so4mnurate orType V polyisocyanurmte-composite insulation; Deno Deck
DuraGuand;Dens Deck Prime;orSECVRDCKGypsum-Fiber Roof Board.
E|astoflexS6 GorS6GFminhot asphalt to:
> Dens Deck Prime or5ECUROCKGypsum-Fiber Roof Board.
PulyUexG orGFR tooh~appUedmo:
> ASTMI D41primed structural concrete;Dens Deck Prime orSECUROCKGypsum-Fiber Roof Board.
For installation under mechanically attached prepared roof coverings, insulation shall be attached per minimum
requirements of the prepared roof covering manufacturer's Product Approval. For installations under foam-on tile
systems,insulation attachment shall be designed by a qualified design professional and installed based on testing of
the insulation/underlayment system in accordance with FBC Section 1504.3.1.
5.63 hond to Mechanically Attached Base Laver:
Polystick(all variations), Polyflex SAP or SAP FR, Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet(FR) Dual Pro or
Tile Pro self-adhered to:
> ASTMI D226,Type I or 11 felt; Elastobase;Elastobase P or Mule-Hide Nail Base.
E|ammOexS6 Gor56 GFRinhot asphalt to:
> ASTM D226,Type I or 11 felt;Elastobase;Elastobase P,Mule-Hide Nail Base or Polyglass G2 Base.
PolyflexGorGFRtorch-applied to:
> Elastobase;Elastobase P,Mule-Hide Nail Base,Polyglass G2 Base or Polyglass APP Base.
For installations under mechanically attached prepared roof coverings, base layer shall be attached per minimum
codified requirements For installations un6*rfoam'on tile systems, base layer shall be attached per minimum
requirements of FRSA/TRI April 2012(04-12),Appendix A,Table 1,or as listed in Section 5.6.4 herein,or as tested in
accordance with FB[Section z5D4.3.1.
5.6.4 FRSA/rR| April 2012 (04-12) does not
address wind uplift resistance ofall under|aymerusystems beneath foam'onti|e systems, where the mndedayment
forms part of the load-path. The following wind uplift limitations apply to under|aymmentsystems that are not
addressed in FRSA/TRI April 2012(04-12)and are used in foam-on tile applications. Maximum Design Pressure isthe
result oftesting for wind load resistance based onallowable wind loads,and reflects the ultimate passing pressure
divided by 2(the 2 to 1 margin of safety per FBC 1504.9 has already been applied).Refer to FRSA/TRI April 2012(04-
12),AppendixA°Tab|e1AorFBC1609fo,Jeterm|nat|000fdesignvvind\oads.
s.5/4.1 Maximurn Design Pressure=-90 Ps :
Deck: Min,15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Primer: wvmn
Base Ply: (mptwna|)Pukstick MTS PLUS,self-adhered
umde,/avmenm-pokstickTuP,Po4smohrVPlus,nolvstickToMax,po|vfl,xSAP,Pdvflex SAP FR,Mule-Hide SA-APP Cap Sheet and
Mule-Hide SA-APP Cap Sheet(pn)'spnaumamm.
sA.4.2 Maximum Design Pressure=-97.S psf:
Deck: Min.IS/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Primer: Ps1onv,ASTM o4z
Base Ply: (opt/nnaVpnhstukMTS PLUS,se/r-aaxwmu
Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and
Mule-Hide SA-APP Cap Sheet(FR),self-adhered and back-nailed within the selvedge-edge side laps using 12 ga.x
znyring shank nails through s2ma.,z's/o diameter tin caps spaced za-inchuc.
Exterior Research and Design,LLC. Evaluation Report Pzzoano2.oe'xaz
Certificate n{Authorization»95o pacmmm-wVoZ EVALUATION pL525e-R25
Revision zz/10Vz7/zoz6
Page oof13
F)o
TRINITY!ERa
5.6.4.3 Maximum Design Pressure=-105 DO:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Primer: WB-3000
Base Ply: (Optional)Polystick MTS PLUS,self-adhered
Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and
Mule-Hide SA-APP Cap Sheet(FR),self-adhered and back-nailed within the selvedge-edge side laps using 12 ga.x
136"ring shank nails through 32 ga.,1-5/8"diameter tin caps spaced 12-inch o.c.
5.6.4.4 Maximum Design Pressure=-135 Dsf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Primer: (Optional)PG100 or ASTM D41
Joints: Min.4-inch wide strips of Elastoflex SA-V over all plywood joints.
Base Ply: (Optional)Polystick MTS PLUS,self-adhered
Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and
Mule-Hide SA-APP Cap Sheet(FR),self-adhered.
5.6.4.5 Maximum Design Pressure=-315 Dsf:
Deck: Structural concrete to meet project requirements to satisfaction of Authority Having Jurisdiction.
Primer: PG100 or ASTM D41
Base Ply: (Optional)Polystick MTS PLUS,self-adhered
Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Tile Pro,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap
Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered.
5.6.4.6 Maximum Design Pressure=-622 5 Dsf:
Deck: Structural concrete to meet project requirements to satisfaction of Authority Having Jurisdiction.
Primer: PG100 or ASTM D41
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied.
5.6.4.7 Maximum Design Pressure=-30.0 Dsf*:
Deck: Min.15/32-inch OSB to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase or Mule-Hide Nail Base(poly-film top surface)
Fasteners: 11 ga.x 1.25-inch long x 1-inch head diameter round metal cap nails
Spacing: 6-inch o.c.at the 3-Inch wide side laps and 6-inch o.c.at two(2)equally spaced staggered center rows.
Base Ply: (Optional)Polystick MTS PLUS,self-adhered
Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and
Mule-Hide SA-APP Cap Sheet(FR),self-adhered.
5.6.4.8 Maximum Design Pressure=-37.5 psf*:
Deck:. Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase or Mule-Hide Nail Base(poly-film top surface)
Fasteners: 11 ga.x 1.25-inch long x 1-inch head diameter round metal cap nails
Spacing: 6-inch o.c.at the 3-inch wide side laps and 6-inch o.c.at two(2)equally spaced staggered center rows.
Base Ply: (Optional)Polystick MTS PLUS,self-adhered
Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and
Mule-Hide SA-APP Cap Sheet(FR),self-adhered.
5.6.4.9 Maximum Design Pressure=-37.5 Dsf*:
Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: One(1)or two(2)layers ASTM D226,Type 11 felt
Fasteners: 11 ga.x 1.254nch long x 1-inch head diameter round metal cap nails
Spacing: 6-inch o.c.at the 3-inch wide side laps and 12-inch o.c.at two(2)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt.
Exterior Research and Design,U.C. Evaluation Report P32060.02.09-R21
Certifirote of Authorizotion#9503 FBC NON-HVHZ EVALUATION FL5259-1125
Revision 21:10/17/2016
Page 7 of 13
J TRINITY f ERD
5.6.4.10 Maximum Design Pressure=-05 psf*:
Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: One(1)layer ASTM D226,Type Il felt
Fasteners: 11 ga.x 1.25-inch x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-inch diameter tin caps
Spacing: 4-inch o.c.at the 2-inch wide side laps and 4-inch o.c.at two(2)equally spaced staggered center rows.
Base Ply: (Optional;for use with self-adhering underlayment only)Polystick MTS PLUS,self-adhered
Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and
Mule-Hide SA-APP Cap Sheet(FR),self-adhered or Elastoflex S6 G,applied in full mopping of hot asphalt.
5.6.4.11 Maximum Design Pressure=-45 osf*:
Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Two(2)layers ASTM D226,Type II felt
Fasteners: 11 ga.x 1.25-inch long x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-inch diameter tin caps
Spacing: 9-inch o.c.at the 2-inch wide side laps and 9-inch o.c.at two(2)equally spaced staggered center rows.
Base Ply: (Optional;for use with self-adhering underlayment only)Polystick MTS PLUS,self-adhered
Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and
Mule-Hide SA-APP Cap Sheet(FR),self-adhered or Elastoflex S6 G,applied in full mopping of hot asphalt.
5.6.4.12 Maximum Design Pressure=-45 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap)
Fasteners: Simplex MAXX Cap Fasteners
Spacing: 9-inch o.c.at the 2-inch wide side laps and 18-inch o.c.at two(2)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied.
5.6.4.13 Maximum Design Pressure=-52.5 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap)
Fasteners: Simplex MAXX Cap Fasteners
Spacing: 9-inch o.c.at the 2-inch wide side laps and 12-inch o.c.at two(2)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied.
5.6.4.14 Maximum Design Pressure=-52.5 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase or Mule-Hide Nail Base(poly-film top surface)
Fasteners: Simplex Original Cap Nails
Spacing: 6-inch o.c.at the 3-inch wide side laps and 6-inch o.c.at four(4)equally spaced staggered center rows.
Base Ply: (Optional)Polystick MTS PLUS,self-adhered
Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and
Mule-Hide SA-APP Cap Sheet(FR),self-adhered.
5.6.4.15 Maximum Design Pressure=-52.5 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap)
Fasteners: Simplex Original Cap Nails
Spacing: 6-inch o.c.at the 3-inch wide side laps and 6-inch o.c.at four(4)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied.
5.6.4.16 Maximum Design Pressure=-60 psf:
Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap)
Fasteners: 11 ga.x 1.25-inch long x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-inch diameter tin caps
Spacing: 8-inch o.c.at the 4-inch wide side laps and 8-inch o.c.at three(3)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied.
Exterior Research and Design,LLC. Evaluation Report P12060.02.09-R21
Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION FLS259-R2S
Revision 21:10/17/2016
Page 8 of 13
I i
"�.t TRINITY ERD
5.6.4.17 Maximum Design Pressure=-60 psf:
Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poiy-film surface for torch-applied cap)
Fasteners: OMG#12 Standard Roofgrip with OMG Flat Bottom Metal Plates
Spacing: 12-inch o.c.at the 4-inch wide side laps and 12-inch o.c.at two(2)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied.
5.6.4.18 Maximum Design Pressure=-67.5 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Polyglass G2 Base or Polyglass APF Base(requires use of torch-applied underlayment)
Fasteners: 12 ga.x 1.25-inch long x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-inch diameter tin caps
Spacing: 8-inch o.c.at the 4-inch wide side laps and 8-inch o.c.at four(4)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or torch-applied or Polyflex G,torch-applied.
5.6.4.19 Maximum Design Pressure=-75 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Polyglass G2 Base or Polyglass APP Base(requires use of torch-applied underlayment)
Fasteners: Dekfast#14 with Dekfast Hex plates,CMG#14 HD with OMG 3"Galvalume Steel Plates,OMG Roofgrip#14 with
OMG Flat Bottom Plates (AccuTrac), Trufast HD with Trufast 3-inch Insulation Plates or Simplex MAXX Cap
Fasteners
Spacing: 10-inch o.c.at the 4-inch wide side laps and 10-inch o.c.at three(3)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or torch-applied or Polyflex G,torch-applied.
5.6.4.20 Maximum Design Pressure=-90 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap)
Fasteners: Slmpiex MAXX Cap Fasteners
Spacing: 6-inch o.c.at the 2-inch wide side laps and 6-inch o.c.at two(2)equally spaced staggered center rows.
Underlayment:Elastoflex 56 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied.
5.6.4.21 Maximum Design Pressure=-90 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap)
Fasteners: OMG#12 Standard Roofgrip or OMG#14 Heavy Duty with OMG 3"Round Metal Plates or OMG Flat Bottom Metal
Plates
Spacing: 6-inch o.c.at the 4-Inch wide side laps and 6-inch o.c.at three(3)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied.
5.6.4.22 Maximum Design Pressure=-90 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase(sanded top surface)
Fasteners: Trufast#12 DP or Trufast#14 HD with Trufast 3"Metal Insulation Plates
Spacing: 6-inch o.c.at the 4-inch wide side laps and 6-inch o.c.at three(3)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G.applied in full mopping of hot asphalt.
5.6.4.23 Maximum Design Pressure=-90 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Polyglass G2 Base or Polyglass APP Base(requires use of torch-applied underlayment)
Fasteners: Dekfast#14 with Dekfast Hex plates,OMG#14 HD with OMG 3"Galvalume Steel Plates,OMG Roofgrip#14 with
OMG Flat Bottom Plates (AccuTrac), Trufast HD with Trufast 3-inch Insulation Plates or Simplex MAXX Cap
Fasteners
Spacing: 9-inch o.c.at the flinch wide side laps and 9-inch o.c.at four(4)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or torch-applied or Polyflex G,torch-applied.
Exterior Research and Design,LLC. Evaluation Report P12060.02.09-1121
Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION FL5259-R25
Revision 21:10/17/2016
Page 9 of 13
,J TRII'"+IITYERD
E
5.6.4.24 Maximum Design Pressure=-97.5 psf:
Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase or Mule-Hide Nail Base(poly-film top surface)
Fasteners: 11 ga.x 1.25-inch x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-inch diameter tin caps
Spacing: 4-inch o.c.at the 4-inch wide side laps and 4-inch o.c.at four(4)equally spaced staggered center rows.
Base Ply: (Optional)Polystick MTS PLUS,self-adhered
Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and
Mule-Hide SA-APP Cap Sheet(FR),self-adhered.
5.6.4.25 Maximum Design Pressure=-105 P :
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap)
Fasteners: Simplex MARX Cap Fasteners
Spacing: 6-inch o.c.at the 2-inch wide side laps and 6-inch o.c.at three(3)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied.
5.6.4.26 Maximum Design Pressure=-112.5 psf:
Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase or Mule-Hide Nail Base(poly-film top surface)
Fasteners: 11 ga.x 1.25-inch x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-Inch diameter tin caps
Spacing: 6-inch o.c.at the 4-inch wide side laps and 6-inch o.c.at four(4)equally spaced staggered center rows.
Primer: PG 100 or ASTM D41 primer at all tin-caps
Base Ply: Polystick MTS PLUS,self-adhered
Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and
Mule-Hide SA-APP Cap Sheet(FR),self-adhered.
5.6.4.27 Maximum Design Pressure=-120 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap)
Fasteners: OMG#12 Standard Roofgrip or OMG#14 Heavy Duty with OMG 3"Round Metal Plates or OMG Flat Bottom Metal
Plates
Spacing: 6-inch o.c.at the 4-inch wide side laps and 6-inch o.c.at five(5)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied.
5.6.4.28 Maximum Design Pressure=-120 psf:
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction.
Base Sheet: Eiastobase(sanded top surface)
Fasteners: Trufast#12 DP or Trufast#14 HD with Trufast 3"Metal Insulation Plates
Spacing: 6-inch o.c.at the 4-inch wide side laps and 6-inch o.c.at five(5)equally spaced staggered center rows.
Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt.
5.6.4.29 All other direct-deck, adhered Polyglass underiayment systems beneath foam-on tile systems carry a Maximum
Design Pressure of-45 psf.
5.6.4.30 For mechanically attached base sheet,the maximum design pressure for the selected assembly shall meet or exceed
the Zone 1 design pressure determined in accordance with FRSA/TRl April 2012(04-12),Appendix A,Table 1A or FBC
1609. Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the
elevated pressure criteria. Commonly used methods are RAS 117, FM LPDS 1-29 and ANSI/SPRI WD1. Assemblies
marked with an asterisk* carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29
(January 2016)for Zone 2/3 enhancements.
5.7 Exposure Limitations:
Elastobase, Elastobase P, Polyglass G2 Base or Polyglass APP Base shall not be left exposed for longer than 30-days
after installation.
Polystick iR-Xe or Polystick MU-X shall not be left exposed for longer than 90-days after installation.
Polystick MTS, MTS PLUS,TU P,TU Plus,TU Max, Dual Pro or Tile Pro shall not be left exposed for longer than 180-
days after installation.
Exterior Research and Design,I.I.C. Evaluation Report P12060.02.09-1121
Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION 1FL52S9-R25
Revision 21:10/17/2016
Page 10 of 13
\,,J TRIM Y I ERD
Polyflex SAP or SAP FR, or Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR) does not have an exposure
limitation, unless the prepared roof covering is to be adhesive-set tile, in which case the maximum exposure is 30
days.
Elastoflex S6 G or S6 G FR or Polyflex G or G FR does not have an exposure limitation, unless the prepared roof
covering is to be adhesive-set tile(Elastoflex S6 G or Polyflex G only), in which case the maximum exposure is 180
days.
6. INSTALLATION:
6.1 Polyglass Roof Underlayments shall be installed in accordance with Polyglass published installation requirements
subject to the Limitations set forth in Section 5 herein and the specifics noted below.
6.2 Re-fasten any loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly to remove
any dust and debris prior to application,and prime the substrate(if applicable).
6.3 Elastobase Elastobase P or Mule-Hide Nail Base:
6.3.1 Shall be installed in compliance with the codified requirements for ASTM D226,Type 11 underlayment in FBC Sections
1507 for the type of prepared roof covering to be installed.
6.3.2 Non-Tile Applications:
Reference is made to the current edition of the NBCA Steep-slope Roofing Manual and ARMA recommendations for
installing shingle underlayments and flashings
Elastobase, Elastobase P or Mule-Hide Nail Base may be covered with a layer of Polystick, Polyflex SAP or SAP FR,
Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet(FR),Dual Pro or Tile Pro,self-adhered,Elastoflex S6 G or S6 G FR in
hot asphalt or Polyflex G or G FR,torch applied.
6.3.3 Tile Applications:
Reference is made to FRSA/TRI April 2012(04-12)Installation Manual and Table 1 herein,using the instructions noted
above as a guideline.
664 Polystick MTS MTS PLUS IR-Xe,TU P TU Plus.TU Max.Dual Pro,Tile Pro or MU-X or Polyflex SAP,PoNflex SAP FR,
Mule-Hide SA-APP Cap Sheet or Mule-Hide SA-APP Cap Sheet(FR):
6.4.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Sections 1507
for the type of prepared roof covering to be installed.
6.4.2 Direct-to-Deck with Mechanically Fastened Roof Covers:
All self-adhering materials,with the exception of Polystick TU Plus,Polyflex SAP or SAP FR and Mule-Hide SA-APP Cap
Sheet or SA-APP Cap Sheet(FR)should be back-nailed in selvage edge seam in accordance with Polyglass/Mule-Hide
Back Nailing Guide. Nails shall be corrosion resistant, 11 gauge ring shank type with a minimum 1-inch diameter
metal disk or Simplex-type metal cap nail,at a minimum rate of 12"o.c. Polystick TU Plus should be back-nailed using
the above noted fasteners and spacing,in area marked "nail area, area para clavar"on the face of membrane. The
head lap membrane is to cover the area being back-nailed
All seal-lap seams (selvage laps) must be
firmly rolled with a minimum 28 Ib. hand
roller to ensure full contact and adhesion.
For Dual Pro and Tile Pro, align the edge of
the top sheet to the end of the glue pattern
(the sheet will overlap the fabric).
View of Ovelap Seam of Dual Pro and Tile Pro
Exterior Research and Design,LLC. Evaluation Report P12060.02.09-1121
Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION FLSZS9-RZS
Revision 21:10/17/2016
Page 11 of 13
�
V K�UK�IU U |"�"^^���
All over-fabric and over-granule end-laps shall have a 6-inch wide uniform layer ofPnlyphs 50 Premium Modified
Wet/Dry Cement or Polyglass PG500 Modified Cement applied in between the application of the lap.
Polystick TU Plus,Dual Pro and Tile Pro may not be used in any exposed application such as crickets,exposed valleys,
orexposed roof towall details
Repair of Polystick membranes is to be accomplished by applying Polyplus 50 Premium Modified Wet/Dry Cement or
Polyg|aso PG50] Modified Cement tnthe area in need of repair, followed by minimum 6 x inch patch of the
Polystiok material of like Wwd, set and hand rolled in place over the repair area. Patch laps, if needed, shall be
installed inowater shedding manner.
All Pn|ystich membranes shall be installed to ensure full contact with approved substrates. Po|yglass requires o
minimum of 40-lb weighted-roller or,on steep slopes, use of a stiff broom with approximately 40-lbs of load applied
for the field membrane. Hand rollers are acceptable for rolling of patches,laps(min.28 lb roller)or small areas of the
roof that are not accessible toalarge roller orbroom.
6.4] Tile Applications(not allowed for Polystick IR-Xe or Polotick mu-x):
Reference|smade tuFR5A/TR|April ZO1ZA]4'1% Installation Manual and Table 1herein,using the instructions noted
above asmguideline.
For mechanically fastened tile roofing over Z'p|ysysten\consisting of base sheet and self-adhering top sheet(s),base
sheet fastening shall benot less than FRWVTR|April 3O1J(O4-13),Table 1.
For adhesive-set tile applications,refer toSection G'6.4herein.
For nail-on tile systems over Polystick MTS,battens are required for loading/staging of the tile.
For nail-on tile systems over PolystickMTS PLUS:
> Battens are required for loading/staging oflugged tile regardless nfslope.
> Battens are required for loading/staging offlat tile u*slopes inexcess of 5:12.
6.4.4 Two(2)Ply Underlayment Systems:
Polystick MTS or MTS PLUS followed by Polystick MTS,MTS PLUS,0P,TU Plus,0Max,Tile Pro, MU-XmPolyflex
SAP isallowable for use under mechanically attached prepared roof systems. Limits ofuse are those associated with
the top-layer material. This is not a requirement,but is allowable if a 2-ply underlayment system is desired.
�
Polystick MTS PLUS followed by Polystick TU P,TU Plus,TU Max, Tile Pro or Polyflex SAP is allowable for use under
foam-on tile systems. Limits ufuse are those associated with the top-layer material. This isnot arequirement,but|s
allowable|fa2'p|yunder|aymentsystem|adesired.
8.5 Elastoflex S6 G or S6 G FR:
6.5.1 Elastoflex S6 G or S6 G FR shall be installed in compliance with current Polyglass published installation requirements,
For use in tile applications,reference is made to FRSA/TRI April 2012(04-12)Installation Manual and Table I herein.
6.5.2 Elastoflex S6 G or S6 G FR shall be fully asphalt-applied to the substrates noted in Section 5.6. Side laps shall be
minimum 3-inch and end-laps minimum 6-inch wide, off-set minimum 3 feet from course to course. Side and end
laps shall be fully adhered in o complete mopping of hot asphalt with asphalt extending approximately 3/8-inch
beyond the lap edge.
§.6
6.6.1 Polyflex G or G FR shall be installed in compliance with current Polyglass published installation requirements. For use
.
in tile applications,reference is made FRSA/TR1 April 2012(04-12)Installation Manual and Table 1 herein.
� 6.6.2 pohf|e«Go/G FR shall be fully torch-applied to the substrates noted in Section 5.6. Side laps shall be minimum 3-
inch and end-laps minimum 6-Inch wide,off-set minimum 3 feet from course to course. Side and end laps shall be
fully heat-welded and inspected to ensure minimum 3/8-inch flow of modified compound beyond the lap edge.
6.7 Tile Staalniv
6.7.1 Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. Refer to
� Polyg|ass published requirements for tile staging.
Exterior Research and Design,u.C' Evaluation Report Pzaoso,0a.09' 2z
Certificate wfAuthorization u9503 pmCmOm'en*aEVwWwnmm pL5259-mZS
Revision 21:uVzT/zo10
Page 12of1s
�
\] ���
�� U K���� U K |��~�'
6.7.2 Battens and/or Counter-battens,as required by the tile manufacturer and FRSA/TR1 April 2012(04-12)must be used
on all roof slopes greater than 7:12. Precautions should be taken as needed, such as the use of battens or nail-
boards,to prevent tile sliding and/or damage to the underlayment during the loading process.
ui|'bnards,topveventd|edidingand/ordamageuatheundedaymentduhnQthehzadingproness.
' 6.7.3 For nail-on tile systems over Polystick MTS,battens are required for loading/staging of the tile.
6.7.4 For nail-on tile systems over PolystickMTS PLUS:
> Battens are required for loading/staging uflugged tile regardless nfslope.
' > Battens are required for loading/staging offlat tile auslopes inexcess nf5:12.
'
6J.9 The minimum cure time after installation of self-adhering membranes and before loading of roofing tiles is forty-eight
(48)hours.
7, BUILDING PERMIT REQUIREMENTS:
.
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product.
8. MANUFACTURING PLANTS:
Contact the noted QA agency for information on product locations covered for F.A.C.Rule 611320-3 QA requirements.
0. QUALITY ASSURANCE ENTITY:
UL,LLC—QUA9G25;(314)578'34D6;k.chanceUor@us.uicum
-END OFEVaLUATIONmEPORT-
'
'
`
Exterior Research and Design,u� Evaluation Report
certiftcate of Authorization#9503 F8C NON-HVHZ EVALUATION eS2s9-R25
Revision z1:z0/17/2oz
Page 1svrz3