Loading...
HomeMy WebLinkAboutProduct Approval (2) Florida Building Code Online Page 1 of 2 Business & Professional Regulation + &,fl'L rA SCIS Home Lop In User Registration ! Hot Topics i Submit Surcharge Stats&Facts Publications ! FSC Staff i SCIS Site Map f Links ; Search t F 'da . r �jr Product Approval USER:Public User Product Approval Menu>P or Applicatbn Search>Application List>Application D"I i R E C E I i j`CLQ��D FL# FL5259-R25 �/6i Application Type Revision E� [e�nan Code Version 2014 uu 10 Application Status Approved PERMITTING St. Lucie County,FL Comments Archived Product Manufacturer POLYGLASS USA Address/Phone/Email 150 Lyon Drive Fernley,NV 89408 (570)384-1230 Ext 242 jakins@ polyglass.com Authorized Signature lames Akins jakins@polyglass.com Technical Representative Steve Wadding Address/Phone/Email 150 Lyon Drive Fernley,NV 98408 (602)363-7139 stevew@polygiass.com Quality Assurance Representative lames Akins Address/Phone/Email 555 Oakridge Road Humboldt Industrial Pkwy Hazleton,PA 18201 (800)894-4563 jalCins@polyglass.com Category Roofing Subcategory Underlayments Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer Di Evaluation Report-Hardcopy Received Florida Engineer or Architect Name who developed Robert Nieminen the Evaluation Report Florida License PE-59166 Quality Assurance Entity UL LLC Quality Assurance Contract Expiration Date 04/24/2018 Validated By John W.Knezevich,PE Validation Checklist-Hardcopy Received Certificate of Independence FL-5259 R25 COI 2016 01 COI Nieminen.odf Referenced Standard and Year(of Standard) Standard Year ASTM D1970 2009 ASTM D226 2006 ASTM D6164 2005 ASTM D6222 2008 ASTM G154 2006 ASTM G155 2005 FM 4474 2004 https://floridabuilding.org/-or_app_dtl.aspx?param=wGEVXQwtDgvbS-AaZp3Crk2vS... 12/29/2016 Florida Building Code Online Page 2 of 2 FRSA/TRI April 2012 2012 TAS 103 1995 UL 1897 2004 Equivalence of Product Standards Certified By Sections from the Code Product Approval Method Method 1 Option D Date Submitted 10/17/2016 Date Validated 10/18/2016 Date Pending FBC Approval 10/19/2016 Date Approved 12/15/2016 Summary of Products FL# Model,Number or Description Name 5259.1 Polygiass Roof Roofing underiayments Underlayments Limits of Use Installation Instructions Approved for use in HVHZ:No FL5,259 R25 II 2016 10 FINAL ER POLYGLASS UNDERLAYMENTS FL5259- Approved for use outside HVHZ:Yes R25,odf Impact Resistant:N/A Verified By:Robert Nieminen PE-59166 Design Pressure:+N/A/-6225 Created by Independent Third Party:Yes Other: 1.)The design pressure in this Evaluation Reports application relates to one particular FL5259 R25 AE 2016 10 FINAL ER POLYGLASS UNDERLAYMENTS FL5259- underlayment system(over concrete R25.Ddf deck)for use under foam-on tile systems Created by Independent Third Party:Yes (where the underlayment forms part of the load-path).Refer to ER Section 5.6.4 for other systems,other deck types and associated maximum design pressures. 2.)Refer to ER Section 5 for other limits of use. Back Nett Contact Us:;2601 Blair Stone Road_Tallahassee FL 32394 Phone:850-07-1824 The State of Florida is an WEED employer.Copyright 2007-2013 cUla of Florida.::Privacy Statement::Accessibility Statement::Refund cratemen Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic mall to this entity.Instead,contact the office by phone or by traditional mail.If you have arty questions,please contact 850.487.1395.*Pursuant to Section 455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have one.The emaiis provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S.,please c8dc hM. Product Approval Accepts: HE 1�0 1110 LIM Credit Card Safe https://floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVXQwtDgvbSgAaZp3 Crk2vS... 12/29/2016 EXTERIOR RESEARCH&DESIGN,LLC. \ Certificate ofAuthorization#9503 3�3�HANSTMEE� UNIT#13��� I TRINITY, ' OXFORD CT 06478 | PHONE,(203)262-924S FAX:(2O3)2G2-9243 EWAlWA71ON REPORT Polyglass USA,Inc. Evaluation Report P12060.02.09-R21 1S0Lyon Drive FLS259-R25 Fernley, NVD84Dg Date mfIssuance:N2/24/2009 . Revision 21:10/17/2016 ' SCOPE: This Evaluation Report is issued under Mw|e 61G20-3 and the opdba6|e rules and regulations governing the use of construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E. for use ofthe product under the Florida Building Code and Florida Building Code, Residential Volume. The products described herein have been evaluated for compliance with the 5th Edition (2014) Florida Building Code sections noted herein. 0ssCmpTIom: Polyglaos Roof Underlaymmants kAosuwG: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance mfthis Evaluation Report by the named client constitutes agreement to notify Robert Nieminen,P.E. if the product changes or the referenced Quality Assurance documentation changes. Trin|ty|EROrequires acomplete review ofthis Evaluation Report relative toupdated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words °Trinhy|ERD Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety. INSPECTION: Upon request,a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists ofpages 1through 13. Prepared by: The facsimile sea[appearing was authorized uvRobert mlemmwn, � P.s.vnuV17/2uxsThis does not serve a,a"electronically Robert J.M,N&emmlnan,P.E. signed document Signed,sealed xardcomieohave been �o���to Product ' named client CER'nncATIOmopINDEPENDENCE: 1. ThnityJGRDdoem not have, nor does itintend tuacquire orwill it acquire, a financial interest inany company manufacturing or distributing products itevaluates. Z. Trinity I ERD Is not owned,operated or controlled by any company manufacturing or distributing products It evaluates, 3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the product. S. This|sabuilding code evaluation. Neither Trinityl ERD nor Robert Nieminen, P.E. are,in any way,the Designer of Record for any project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained specifically for that purpose. iERD TRINITY ROOFING COMPONENT EVALUATION: 1. SCOPE: Product Category. Roofing Sub-Category: Underlayment Compliance Statement: Roof Underlayments, as produced by Polyglass USA, Inc., have demonstrated compliance with the following sections of the Florida Building Code through testing in accordance with the following Standards. Compliance is subject to the installation Requirements and Limitations/Conditions of Use set forth herein. 2. STANDARDS: Section Prope Standard Year 1504.3.1 Wind Uplift FM 4474 2004 1504.3.1 Wind Uplift UL 1897 2004 1504.6 Accelerated Weathering ASTM G154 2006 1504.6 Accelerated Weathering ASTM G155 2005 1507.2.3,1507.3.3,1507.5.3,1507.7.3, Physical Properties ASTM D226 2006 1507.8.3,1507.9.3 1507.2.4,1507.2.9.2,1507.5.3,1507.7.3 Physical Properties ASTM D1970 2009 1507.11.2 Physical Properties ASTM D6164 2005 1507.11.2 Physical Properties ASTM D6222 2008 1507.3.3 Installation Practice FRSAITRI April 2012 2012 1523.6.5.2.1 Physical Properties TAS 103 1995 3. REFERENCES: gattit Examination Reference Date FM Approvals(TST 1867) Wind Uplift 3004091 01/12/2000 PRI(TST 5878) Physical Properties PRIO1111 04/08/2002 PRI(TST 5878) Physical Properties PUSA-005-02-01 01/31/2002 PRI(TST 5878) Physical Properties PUSA-013-02-01 12/23/2002 PRI(TST 5878) Physical Properties PUSA-013-02-02 12/23/2002 PRI(TST 5878) Physical Properties PUSA-013-02-03 12/23/2002 PRI(TST 5878) Physical Properties PUSA-018-02-01 07/14/2003 PRI(TST 5878) Physical Properties PUSA-028-02-01 07/13/2005 PRI(TST 5878) Physical Properties PUSA-033-02-01 01/12/2006 PRI(TST 5878) Physical Properties PUSA-035-02-01 09129/2006 PRI(TST 5878) Physical Properties PUSA-055-02-02 12/10/2007 PRI(TST 5878) Physical Properties PUSA-061-02-02 01/28/2008 PRI(TST 5878) Physical Properties PUSA-076-02-01 02/22/2008 PRI(TST 5878) Physical Properties PUSA-083-02-01 04/14/2008 PRI(TST 5878) Physical Properties PUSA-088-02-01 07/29/2009 MTI(TST 2508) Physical Properties JX20H7A 04/01/2008 MTI(TST 2508) Physical Properties RX14E8A 01/29/2009 ERD(TST 6049) Physical Properties 11752.09.99-1 02/09/2000 ERD(TST 6049) Wind Uplift 11757.08.01-1 08/13/2001 ERD(TST 6049) Wind Uplift 11776.06.02 01/16/2003 ERD(TST 6049) Physical Properties 02200.07.03 07/14/2003 ERD(TST 6049) Wind Uplift P1740.01.07 01/04/2007 ERD(TST 6049) Physical Properties P5110.04.07-1 04/11/2007 ERD(TST 6049) Wind Uplift P9260.03.08 03/21/2008 ERD(TST 6049) Physical Properties P134S0.08.09 08/13/2009 ERD(TST 6049) Wind Uplift P30540.11.09-R1 11/30/2009 ERD(TST 6049) Physical Properties P11030.11.09-1 11/30/2009 ERD(TST 6049) Wind Uplift P11030.11.09-2 11/30/2009 ERD(TST 6049) Physical Properties P11030.11.09-3 11/30/2009 ERD(TST 6049) Physical Properties P33360.06.10 06/25/2010 Exterior Research and Design,LLC. Evaluation Report P12060.02.09-R21 Certificate of Authorization#9503 F8C NON-HVHZ EVALUATION FLS2S9-R2S Revision 21:10/17/2016 Page 2 of 13 "[TRINITYIERD inti v Examination Reference at ERD(TST 6049) Physical Properties P33370.03.11 03/02/2011 ERD(TST 6049) Physical Properties P33370.04.11 04/26/2011 ERD(TST 6049) Physical Properties P37300.10.11 10/19/2011 ERD(TST 6049) Physical Properties P40390.08.12-1 08/06/2012 ERD(TST 6049) Physical Properties P40390.08.12-2 08/07/2012 ERD(TST 6049) Physical Properties C41420.09,12-3 09/11/2012 ERD(TST 6049) Wind Uplift P39680.03.13 03/04/2013 ERD(TST 6049) Physical Properties P45370.04.13 04/26/2013 ERD(TST 6049) Wind Uplift P1738.02.07-R2 04/29/2013 ERD(TST 6049) Wind Uplift 11757.04.01-1-111 04/30/2013 ERD(TST 6049) Wind Uplift P41630.08.13 08/06/2013 ERD(TST 6049) Wind Uplift P11751.05.03-RI 11126/2013 ERD(TST 6049) Wind Uplift P11781.11.03-111 11/26/2013 ERD(TST 6049) Physical Properties P45270.05.14 05/12/2014 ERD(TST 6049) Physical Properties 6020.07.14-1 09/08/2014 ERD(TST 6049) Physical Properties 6020.09.14-2 09/08/2014 ERD(TST 6049) Physical Properties 6020,09.14-3 09/08/2014 ERD(TST 6049) Physical Properties 6020,09.14-4 09/08/2014 ERD(TST 6049) Physical Properties 6020,09.14-5 09/08/2014 ERD(TST 6049) Physical Properties 6020.09.14-6 09/08/2014 ERD(TST 6049) Physical Properties P46520.10.14 10/03/2014 ERD(TST 6049) Physical Properties P44360.10.14 10/07/2014 ERD(TST 6049) Physical Properties P43290.10.14 10/17/2014 ERD(TST 6049) Physical Properties PLYG-SC7550.03.15 03/24/2015 ERD(TST 6049) Physical Properties P40390.04.15 04/03/2015 ERD(TST 6049) Physical Properties PLYG-SC8080.05.15-1 05/20/2015 ERD(TST 6049) Wind Uplift PLYG-SC8905.05.16-1 05/17/2016 ERD(TST 6049) Physical Properties PLYG-SC8080.07.16 07/16/2016 ERD(TST 6049) Wind Uplift PLYG-SC12025.10.16 10/12/2016 ICC-ES(EVL 2396) 18C Compliance ESR-1697 11/01/2014 Miami-Dade(CER 1592) HVHZ Compliance NOA 14-0717.08 01/22/2015 Polyglass USA Manufacturing Affidavit Products Current 02/18/2009 Polyglass USA P/L Affidavit Mule-Hide Cross Ltg 03/01/2008 Polyglass USA Materials Affidavit Polystick SA Compound 08/18/2011 UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.04/24/2018 4. PRODUCT DESCRIPTION: 4.1 Mechanically Fastened Underlayments: 4.1.1 Elastobase is a fiberglass reinforced,SBS modified bitumen base sheet. 4.1.2 Elastobase P is a polyester-reinforced,SBS modified bitumen base sheet, 4.1.3 Polyglass G2 Base is a fiberglass-reinforced,asphaltic base sheet. 4.1.4 Polyglass APP Base is a fiberglass-reinforced,APP modified bitumen base sheet. 4.2 —Self-Adhering Underlayments: 4.2.1 Polystick MTS is a nominal 60-mil thick rubberized asphalt waterproofing membrane,glass fiber reinforced,surfaced with polycilefinic film surface;meets ASTM D1970 and TAS 103. 4.2.2 Polystick MTS PLUS is a nominal 60-mil thick rubberized asphalt waterproofing membrane, glass fiber reinforced, surfaced with poly-film surface;meets TAS 103. 4,23 Polystick IR-Xe is a nominal 60-mil thick rubberized asphalt waterproofing membrane,glass fiber reinforced,with an aggregate surface;meets ASTM D1970. Exterior Research and Design,LLC. Evaluation Report P12060.02.09-R21 Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION FL5259-R2S Revision 21:10/17/2016 Page 3 of 13 b� \, TR1N11 Y j ERD 4.2.4 Polystick TU Plus is a nominal 80-mil thick rubberized asphalt waterproofing membrane,glass fiber reinforced,with a polyester fabric surface;meets ASTM D1970 and TAS 103. 4.2.5 Polystick TU P is a nominal 130-mil thick rubberized asphalt waterproofing membrane, glass-fiber/polyester reinforced,with a granular surface;meets ASTM D1970 and TAS 103. 4.2.6 Polystick TU Max is a nominal 60-mil thick rubberized asphalt waterproofing membrane with a 190 g/m2 polyester fabric surface;meets ASTM D1970 and TAS 103. 4.2.7 Polyflex SAP, Polyflex SAP FR, Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet (FR) are polyester reinforced,APP modified bitumen cap sheets;meet ASTM D6222. 4.2.8 Polystick Dual Pro"" is a nominal 60-mil thick dual-layer rubberized asphalt waterproofing membrane, fiberglass reinforced,with a polyester fabric surface;meets ASTM D1970. 4.2.9 Polystick Tile Pro'" is a nominal 60-mil thick dual-layer rubberized asphalt waterproofing membrane, fiberglass reinforced,with a polyester fabric surface;meets ASTM D1970 and TAS 103. 4.2.10 Polystick MU-X is a nominal 54-mil thick dual-layer rubberized asphalt waterproofing membrane, fiberglass reinforced,with a polypropylene film surface;meets AC188 and physical requirements of ASTM D1970. 4.3 Mechanically Fastened and/or Bonded Underiavments: 4.3.1 Elastoflex S6 G and Eiastoflex S6 G FR are polyester reinforced,SBS modified bitumen cap sheets;meet ASTM D6164. 4.3.2 Polyflex G and Polyflex G FR are polyester reinforced,APP modified bitumen cap sheets;meet ASTM D6222. S. LIMITATIONS: 5.1 This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way,the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in the HVHZ. 5.3 Fire Classification is not part of this Evaluation Report;refer to current Approved Roofing Materials Directory for fire ratings of this product. 5.4 Polyglass Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced within FBC approval documents. If not listed, a request may be made to the Authority Having Jurisdiction for approval based on this evaluation combined with supporting data for the prepared roof covering. 5.5 Allowable Roof Covers: v"T�a121."RooF WVpt OPTi+iVs r F Underlayment Asphalt Shingles Nail-On Tile Foam-On Tile Metal wood Shakes 5&Shingles Slate Yes Yes Elastobase Yes (base sheet in 2-pry (base sheet In 2-pry Yes Yes Yes system) system) Yes Yes Elastobase P Yes (base sheet in 2-pry (base sheet in 2-pry Yes Yes Yes system) system) Yes Yes Polyglass G2 Base No (base sheet in 2-pry (base sheet in 2-ply No No No system) system) Yes Yes Polyglass APP Base No (base sheet to 2-0y (base sheet in 2-ply No No No system) system) Polystick MTS Yes Yes No Yes Yes Yes Polystick MTS PLUS Yes Yes No Yes Yes Yes Polystick IR-Xe Yes No No No Yes Yes Polystick TU P Yes Yes Yes No Yes Yes See 5.5.1 Polystick TU Plus Yes Yes Yes Yes Yes Yes see 5.5.1 Exterior Research and Design,I.I.C. Evaluation Report P12060.02.09-R21 Certificate of Authorization 119503 FBC NON-HVHZ EVALUATION FL5259-R2S Revision 21:10/17/2016 Page 4 of 13 TRINITY JERD TABi.E'1;4 F,LOVEIt OFTfQNS Underlayment Asphalt shingles Nail-On Tile Foam-On Tile Metal Wood Shakes& Slate Shingles Polystick TU Max No Yes Yes Yes No No See 5.5.1 Polystick Dual Pro Yes Yes No Yes Yes Yes Polystick Tile Pro Yes Yes Yes Yes Yes Yes See 5.5.1 Polystick MU-X Yes No No Yes Yes Yes Elastoflex S6 G Yes Yes Yes No Yes Yes See 5.5.1 Elastoflex S6 G FR Yes Yes No No Yes Yes Polyflex G Yes Yes Yes No Yes Yes See 5.5.1 Polyflex G FR Yes Yes No No Yes Yes Po"ex SAP or SAP FR Yes Yes Yes No Yes Yes See 5.5.1 Mule-Hide SA-APP Cap Sheet yes Yes Yes No Yes Yes or SA-APP Cap Sheet(FR) See 5.5.1 5.5.1 "Foam-On Tile" Is limited to use of the following Approved tile adhesives unless tensile adhesion i long term aging data from an accredited testing laboratory is provided. ✓ 3M1 2-Component Roof Tile Adhesive AH-160 (FL6332): Polystick TU P, Polystick TU Plus, Polystick TU Max, Elastoflex S6 G, Polyflex G, Polyflex SAP, Polyflex SA Cap FR, Mule-Hide SA-APP Cap Sheet or Mule-Hide SA-APP Cap Sheet(FR)or Tile Pro. ✓ 3M'" Foam Roof Tile Adhesive RTA-1(F16276): Polystick TU P,Polystick TU Plus, Polystick TU Max,Elastoflex S6 G, Polyflex G, Polyflex SAP,Polyflex SA Cap FR,Mule-Hide SA-APP Cap Sheet or Mule-Hide SA-APP Cap Sheet(FR) or Tile Pro ✓ Convenience Products'Touch'n Seal Storm Bond Roof Tile Adhesive(FL14506): Polystick TU Plus, Polystick TU Max. ✓ Dow TileBond(FL717): Polystick TU P,Polystick TU Plus,Polyflex SAP or Tile Pro. ✓ Polyglass Polylok Roof Tile Adhesive(FL17855): Polystick TU Plus or Polystick TU Max. 5.6 Allowable Substrates: 5.6.1 Direct-Bond to Deck: Polystick(all variations),Dual Pro,Tile Pro,Polyflex SAP or SAP FR,Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR)self-adhered to: ➢ New untreated plywood;ASTM D41 primed new untreated plywood; Existing plywood;ASTM D41 primed existing plywood; New or existing, unprimed OSB; ASTM D41 primed OSB; Southern Yellow Pine; ASTM D41 primed Southern Yellow Pine; ASTM D41 primed structural concrete; Huber Engineered Woods "ZIP System" Panels (designed and Installed to meet wind loads for project). Note:Polyglass does not require priming of new or existing plywood or OSB sheathing. New or existing plywood or OSB sheathing should be cleaned of all dirt and debris prior to application of Polystick membranes. Elastoflex S6 G or S6 G FR in hot asphalt to: ASTM D41 primed structural concrete. Polyflex G or G FR torch-applied to: ➢ ASTM D41 primed structural concrete. Exterior Research and Design,I.I.C. Evaluation Report P12060.02.09-R21 Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION FL5259-R25 Revision 21:10/17/2016 Page 5 of 13 `J URNIU U ���|��x�' 5.6.2 Polysdck(all vahabons), PnlyOexSAP nrSAP FR, Mule-Hide SA-APP CapShaetnrSA'APPCapSheet(RR)seK-adhered to: > A5TMI C1289\ Type U, Class 1 po|y|so4mnurate orType V polyisocyanurmte-composite insulation; Deno Deck DuraGuand;Dens Deck Prime;orSECVRDCKGypsum-Fiber Roof Board. E|astoflexS6 GorS6GFminhot asphalt to: > Dens Deck Prime or5ECUROCKGypsum-Fiber Roof Board. PulyUexG orGFR tooh~appUedmo: > ASTMI D41primed structural concrete;Dens Deck Prime orSECUROCKGypsum-Fiber Roof Board. For installation under mechanically attached prepared roof coverings, insulation shall be attached per minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations under foam-on tile systems,insulation attachment shall be designed by a qualified design professional and installed based on testing of the insulation/underlayment system in accordance with FBC Section 1504.3.1. 5.63 hond to Mechanically Attached Base Laver: Polystick(all variations), Polyflex SAP or SAP FR, Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet(FR) Dual Pro or Tile Pro self-adhered to: > ASTMI D226,Type I or 11 felt; Elastobase;Elastobase P or Mule-Hide Nail Base. E|ammOexS6 Gor56 GFRinhot asphalt to: > ASTM D226,Type I or 11 felt;Elastobase;Elastobase P,Mule-Hide Nail Base or Polyglass G2 Base. PolyflexGorGFRtorch-applied to: > Elastobase;Elastobase P,Mule-Hide Nail Base,Polyglass G2 Base or Polyglass APP Base. For installations under mechanically attached prepared roof coverings, base layer shall be attached per minimum codified requirements For installations un6*rfoam'on tile systems, base layer shall be attached per minimum requirements of FRSA/TRI April 2012(04-12),Appendix A,Table 1,or as listed in Section 5.6.4 herein,or as tested in accordance with FB[Section z5D4.3.1. 5.6.4 FRSA/rR| April 2012 (04-12) does not address wind uplift resistance ofall under|aymerusystems beneath foam'onti|e systems, where the mndedayment forms part of the load-path. The following wind uplift limitations apply to under|aymmentsystems that are not addressed in FRSA/TRI April 2012(04-12)and are used in foam-on tile applications. Maximum Design Pressure isthe result oftesting for wind load resistance based onallowable wind loads,and reflects the ultimate passing pressure divided by 2(the 2 to 1 margin of safety per FBC 1504.9 has already been applied).Refer to FRSA/TRI April 2012(04- 12),AppendixA°Tab|e1AorFBC1609fo,Jeterm|nat|000fdesignvvind\oads. s.5/4.1 Maximurn Design Pressure=-90 Ps : Deck: Min,15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Primer: wvmn Base Ply: (mptwna|)Pukstick MTS PLUS,self-adhered umde,/avmenm-pokstickTuP,Po4smohrVPlus,nolvstickToMax,po|vfl,xSAP,Pdvflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(pn)'spnaumamm. sA.4.2 Maximum Design Pressure=-97.S psf: Deck: Min.IS/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Primer: Ps1onv,ASTM o4z Base Ply: (opt/nnaVpnhstukMTS PLUS,se/r-aaxwmu Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered and back-nailed within the selvedge-edge side laps using 12 ga.x znyring shank nails through s2ma.,z's/o diameter tin caps spaced za-inchuc. Exterior Research and Design,LLC. Evaluation Report Pzzoano2.oe'xaz Certificate n{Authorization»95o pacmmm-wVoZ EVALUATION pL525e-R25 Revision zz/10Vz7/zoz6 Page oof13 F)o TRINITY!ERa 5.6.4.3 Maximum Design Pressure=-105 DO: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Primer: WB-3000 Base Ply: (Optional)Polystick MTS PLUS,self-adhered Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered and back-nailed within the selvedge-edge side laps using 12 ga.x 136"ring shank nails through 32 ga.,1-5/8"diameter tin caps spaced 12-inch o.c. 5.6.4.4 Maximum Design Pressure=-135 Dsf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Primer: (Optional)PG100 or ASTM D41 Joints: Min.4-inch wide strips of Elastoflex SA-V over all plywood joints. Base Ply: (Optional)Polystick MTS PLUS,self-adhered Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered. 5.6.4.5 Maximum Design Pressure=-315 Dsf: Deck: Structural concrete to meet project requirements to satisfaction of Authority Having Jurisdiction. Primer: PG100 or ASTM D41 Base Ply: (Optional)Polystick MTS PLUS,self-adhered Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Tile Pro,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered. 5.6.4.6 Maximum Design Pressure=-622 5 Dsf: Deck: Structural concrete to meet project requirements to satisfaction of Authority Having Jurisdiction. Primer: PG100 or ASTM D41 Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied. 5.6.4.7 Maximum Design Pressure=-30.0 Dsf*: Deck: Min.15/32-inch OSB to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase or Mule-Hide Nail Base(poly-film top surface) Fasteners: 11 ga.x 1.25-inch long x 1-inch head diameter round metal cap nails Spacing: 6-inch o.c.at the 3-Inch wide side laps and 6-inch o.c.at two(2)equally spaced staggered center rows. Base Ply: (Optional)Polystick MTS PLUS,self-adhered Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered. 5.6.4.8 Maximum Design Pressure=-37.5 psf*: Deck:. Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase or Mule-Hide Nail Base(poly-film top surface) Fasteners: 11 ga.x 1.25-inch long x 1-inch head diameter round metal cap nails Spacing: 6-inch o.c.at the 3-inch wide side laps and 6-inch o.c.at two(2)equally spaced staggered center rows. Base Ply: (Optional)Polystick MTS PLUS,self-adhered Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered. 5.6.4.9 Maximum Design Pressure=-37.5 Dsf*: Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: One(1)or two(2)layers ASTM D226,Type 11 felt Fasteners: 11 ga.x 1.254nch long x 1-inch head diameter round metal cap nails Spacing: 6-inch o.c.at the 3-inch wide side laps and 12-inch o.c.at two(2)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt. Exterior Research and Design,U.C. Evaluation Report P32060.02.09-R21 Certifirote of Authorizotion#9503 FBC NON-HVHZ EVALUATION FL5259-1125 Revision 21:10/17/2016 Page 7 of 13 J TRINITY f ERD 5.6.4.10 Maximum Design Pressure=-05 psf*: Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: One(1)layer ASTM D226,Type Il felt Fasteners: 11 ga.x 1.25-inch x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-inch diameter tin caps Spacing: 4-inch o.c.at the 2-inch wide side laps and 4-inch o.c.at two(2)equally spaced staggered center rows. Base Ply: (Optional;for use with self-adhering underlayment only)Polystick MTS PLUS,self-adhered Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered or Elastoflex S6 G,applied in full mopping of hot asphalt. 5.6.4.11 Maximum Design Pressure=-45 osf*: Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Two(2)layers ASTM D226,Type II felt Fasteners: 11 ga.x 1.25-inch long x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-inch diameter tin caps Spacing: 9-inch o.c.at the 2-inch wide side laps and 9-inch o.c.at two(2)equally spaced staggered center rows. Base Ply: (Optional;for use with self-adhering underlayment only)Polystick MTS PLUS,self-adhered Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered or Elastoflex S6 G,applied in full mopping of hot asphalt. 5.6.4.12 Maximum Design Pressure=-45 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap) Fasteners: Simplex MAXX Cap Fasteners Spacing: 9-inch o.c.at the 2-inch wide side laps and 18-inch o.c.at two(2)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied. 5.6.4.13 Maximum Design Pressure=-52.5 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap) Fasteners: Simplex MAXX Cap Fasteners Spacing: 9-inch o.c.at the 2-inch wide side laps and 12-inch o.c.at two(2)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied. 5.6.4.14 Maximum Design Pressure=-52.5 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase or Mule-Hide Nail Base(poly-film top surface) Fasteners: Simplex Original Cap Nails Spacing: 6-inch o.c.at the 3-inch wide side laps and 6-inch o.c.at four(4)equally spaced staggered center rows. Base Ply: (Optional)Polystick MTS PLUS,self-adhered Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered. 5.6.4.15 Maximum Design Pressure=-52.5 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap) Fasteners: Simplex Original Cap Nails Spacing: 6-inch o.c.at the 3-inch wide side laps and 6-inch o.c.at four(4)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied. 5.6.4.16 Maximum Design Pressure=-60 psf: Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap) Fasteners: 11 ga.x 1.25-inch long x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-inch diameter tin caps Spacing: 8-inch o.c.at the 4-inch wide side laps and 8-inch o.c.at three(3)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied. Exterior Research and Design,LLC. Evaluation Report P12060.02.09-R21 Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION FLS259-R2S Revision 21:10/17/2016 Page 8 of 13 I i "�.t TRINITY ERD 5.6.4.17 Maximum Design Pressure=-60 psf: Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poiy-film surface for torch-applied cap) Fasteners: OMG#12 Standard Roofgrip with OMG Flat Bottom Metal Plates Spacing: 12-inch o.c.at the 4-inch wide side laps and 12-inch o.c.at two(2)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied. 5.6.4.18 Maximum Design Pressure=-67.5 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Polyglass G2 Base or Polyglass APF Base(requires use of torch-applied underlayment) Fasteners: 12 ga.x 1.25-inch long x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-inch diameter tin caps Spacing: 8-inch o.c.at the 4-inch wide side laps and 8-inch o.c.at four(4)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or torch-applied or Polyflex G,torch-applied. 5.6.4.19 Maximum Design Pressure=-75 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Polyglass G2 Base or Polyglass APP Base(requires use of torch-applied underlayment) Fasteners: Dekfast#14 with Dekfast Hex plates,CMG#14 HD with OMG 3"Galvalume Steel Plates,OMG Roofgrip#14 with OMG Flat Bottom Plates (AccuTrac), Trufast HD with Trufast 3-inch Insulation Plates or Simplex MAXX Cap Fasteners Spacing: 10-inch o.c.at the 4-inch wide side laps and 10-inch o.c.at three(3)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or torch-applied or Polyflex G,torch-applied. 5.6.4.20 Maximum Design Pressure=-90 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap) Fasteners: Slmpiex MAXX Cap Fasteners Spacing: 6-inch o.c.at the 2-inch wide side laps and 6-inch o.c.at two(2)equally spaced staggered center rows. Underlayment:Elastoflex 56 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied. 5.6.4.21 Maximum Design Pressure=-90 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap) Fasteners: OMG#12 Standard Roofgrip or OMG#14 Heavy Duty with OMG 3"Round Metal Plates or OMG Flat Bottom Metal Plates Spacing: 6-inch o.c.at the 4-Inch wide side laps and 6-inch o.c.at three(3)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied. 5.6.4.22 Maximum Design Pressure=-90 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase(sanded top surface) Fasteners: Trufast#12 DP or Trufast#14 HD with Trufast 3"Metal Insulation Plates Spacing: 6-inch o.c.at the 4-inch wide side laps and 6-inch o.c.at three(3)equally spaced staggered center rows. Underlayment:Elastoflex S6 G.applied in full mopping of hot asphalt. 5.6.4.23 Maximum Design Pressure=-90 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Polyglass G2 Base or Polyglass APP Base(requires use of torch-applied underlayment) Fasteners: Dekfast#14 with Dekfast Hex plates,OMG#14 HD with OMG 3"Galvalume Steel Plates,OMG Roofgrip#14 with OMG Flat Bottom Plates (AccuTrac), Trufast HD with Trufast 3-inch Insulation Plates or Simplex MAXX Cap Fasteners Spacing: 9-inch o.c.at the flinch wide side laps and 9-inch o.c.at four(4)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or torch-applied or Polyflex G,torch-applied. Exterior Research and Design,LLC. Evaluation Report P12060.02.09-1121 Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION FL5259-R25 Revision 21:10/17/2016 Page 9 of 13 ,J TRII'"+IITYERD E 5.6.4.24 Maximum Design Pressure=-97.5 psf: Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase or Mule-Hide Nail Base(poly-film top surface) Fasteners: 11 ga.x 1.25-inch x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-inch diameter tin caps Spacing: 4-inch o.c.at the 4-inch wide side laps and 4-inch o.c.at four(4)equally spaced staggered center rows. Base Ply: (Optional)Polystick MTS PLUS,self-adhered Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered. 5.6.4.25 Maximum Design Pressure=-105 P : Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap) Fasteners: Simplex MARX Cap Fasteners Spacing: 6-inch o.c.at the 2-inch wide side laps and 6-inch o.c.at three(3)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied. 5.6.4.26 Maximum Design Pressure=-112.5 psf: Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase or Mule-Hide Nail Base(poly-film top surface) Fasteners: 11 ga.x 1.25-inch x 3/8-inch head diameter annular ring shank roofing nails at 1-5/8-Inch diameter tin caps Spacing: 6-inch o.c.at the 4-inch wide side laps and 6-inch o.c.at four(4)equally spaced staggered center rows. Primer: PG 100 or ASTM D41 primer at all tin-caps Base Ply: Polystick MTS PLUS,self-adhered Underlayment:Polystick TU P,Polystick TU Plus,Polystick TU Max,Polyflex SAP,Polyflex SAP FR,Mule-Hide SA-APP Cap Sheet and Mule-Hide SA-APP Cap Sheet(FR),self-adhered. 5.6.4.27 Maximum Design Pressure=-120 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Elastobase(sanded top surface for hot-asphalt or torch-applied cap or poly-film surface for torch-applied cap) Fasteners: OMG#12 Standard Roofgrip or OMG#14 Heavy Duty with OMG 3"Round Metal Plates or OMG Flat Bottom Metal Plates Spacing: 6-inch o.c.at the 4-inch wide side laps and 6-inch o.c.at five(5)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt or Polyflex G,torch-applied. 5.6.4.28 Maximum Design Pressure=-120 psf: Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Eiastobase(sanded top surface) Fasteners: Trufast#12 DP or Trufast#14 HD with Trufast 3"Metal Insulation Plates Spacing: 6-inch o.c.at the 4-inch wide side laps and 6-inch o.c.at five(5)equally spaced staggered center rows. Underlayment:Elastoflex S6 G,applied in full mopping of hot asphalt. 5.6.4.29 All other direct-deck, adhered Polyglass underiayment systems beneath foam-on tile systems carry a Maximum Design Pressure of-45 psf. 5.6.4.30 For mechanically attached base sheet,the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FRSA/TRl April 2012(04-12),Appendix A,Table 1A or FBC 1609. Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are RAS 117, FM LPDS 1-29 and ANSI/SPRI WD1. Assemblies marked with an asterisk* carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29 (January 2016)for Zone 2/3 enhancements. 5.7 Exposure Limitations: Elastobase, Elastobase P, Polyglass G2 Base or Polyglass APP Base shall not be left exposed for longer than 30-days after installation. Polystick iR-Xe or Polystick MU-X shall not be left exposed for longer than 90-days after installation. Polystick MTS, MTS PLUS,TU P,TU Plus,TU Max, Dual Pro or Tile Pro shall not be left exposed for longer than 180- days after installation. Exterior Research and Design,I.I.C. Evaluation Report P12060.02.09-1121 Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION 1FL52S9-R25 Revision 21:10/17/2016 Page 10 of 13 \,,J TRIM Y I ERD Polyflex SAP or SAP FR, or Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR) does not have an exposure limitation, unless the prepared roof covering is to be adhesive-set tile, in which case the maximum exposure is 30 days. Elastoflex S6 G or S6 G FR or Polyflex G or G FR does not have an exposure limitation, unless the prepared roof covering is to be adhesive-set tile(Elastoflex S6 G or Polyflex G only), in which case the maximum exposure is 180 days. 6. INSTALLATION: 6.1 Polyglass Roof Underlayments shall be installed in accordance with Polyglass published installation requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below. 6.2 Re-fasten any loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application,and prime the substrate(if applicable). 6.3 Elastobase Elastobase P or Mule-Hide Nail Base: 6.3.1 Shall be installed in compliance with the codified requirements for ASTM D226,Type 11 underlayment in FBC Sections 1507 for the type of prepared roof covering to be installed. 6.3.2 Non-Tile Applications: Reference is made to the current edition of the NBCA Steep-slope Roofing Manual and ARMA recommendations for installing shingle underlayments and flashings Elastobase, Elastobase P or Mule-Hide Nail Base may be covered with a layer of Polystick, Polyflex SAP or SAP FR, Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet(FR),Dual Pro or Tile Pro,self-adhered,Elastoflex S6 G or S6 G FR in hot asphalt or Polyflex G or G FR,torch applied. 6.3.3 Tile Applications: Reference is made to FRSA/TRI April 2012(04-12)Installation Manual and Table 1 herein,using the instructions noted above as a guideline. 664 Polystick MTS MTS PLUS IR-Xe,TU P TU Plus.TU Max.Dual Pro,Tile Pro or MU-X or Polyflex SAP,PoNflex SAP FR, Mule-Hide SA-APP Cap Sheet or Mule-Hide SA-APP Cap Sheet(FR): 6.4.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Sections 1507 for the type of prepared roof covering to be installed. 6.4.2 Direct-to-Deck with Mechanically Fastened Roof Covers: All self-adhering materials,with the exception of Polystick TU Plus,Polyflex SAP or SAP FR and Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet(FR)should be back-nailed in selvage edge seam in accordance with Polyglass/Mule-Hide Back Nailing Guide. Nails shall be corrosion resistant, 11 gauge ring shank type with a minimum 1-inch diameter metal disk or Simplex-type metal cap nail,at a minimum rate of 12"o.c. Polystick TU Plus should be back-nailed using the above noted fasteners and spacing,in area marked "nail area, area para clavar"on the face of membrane. The head lap membrane is to cover the area being back-nailed All seal-lap seams (selvage laps) must be firmly rolled with a minimum 28 Ib. hand roller to ensure full contact and adhesion. For Dual Pro and Tile Pro, align the edge of the top sheet to the end of the glue pattern (the sheet will overlap the fabric). View of Ovelap Seam of Dual Pro and Tile Pro Exterior Research and Design,LLC. Evaluation Report P12060.02.09-1121 Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION FLSZS9-RZS Revision 21:10/17/2016 Page 11 of 13 � V K�UK�IU U |"�"^^��� All over-fabric and over-granule end-laps shall have a 6-inch wide uniform layer ofPnlyphs 50 Premium Modified Wet/Dry Cement or Polyglass PG500 Modified Cement applied in between the application of the lap. Polystick TU Plus,Dual Pro and Tile Pro may not be used in any exposed application such as crickets,exposed valleys, orexposed roof towall details Repair of Polystick membranes is to be accomplished by applying Polyplus 50 Premium Modified Wet/Dry Cement or Polyg|aso PG50] Modified Cement tnthe area in need of repair, followed by minimum 6 x inch patch of the Polystiok material of like Wwd, set and hand rolled in place over the repair area. Patch laps, if needed, shall be installed inowater shedding manner. All Pn|ystich membranes shall be installed to ensure full contact with approved substrates. Po|yglass requires o minimum of 40-lb weighted-roller or,on steep slopes, use of a stiff broom with approximately 40-lbs of load applied for the field membrane. Hand rollers are acceptable for rolling of patches,laps(min.28 lb roller)or small areas of the roof that are not accessible toalarge roller orbroom. 6.4] Tile Applications(not allowed for Polystick IR-Xe or Polotick mu-x): Reference|smade tuFR5A/TR|April ZO1ZA]4'1% Installation Manual and Table 1herein,using the instructions noted above asmguideline. For mechanically fastened tile roofing over Z'p|ysysten\consisting of base sheet and self-adhering top sheet(s),base sheet fastening shall benot less than FRWVTR|April 3O1J(O4-13),Table 1. For adhesive-set tile applications,refer toSection G'6.4herein. For nail-on tile systems over Polystick MTS,battens are required for loading/staging of the tile. For nail-on tile systems over PolystickMTS PLUS: > Battens are required for loading/staging oflugged tile regardless nfslope. > Battens are required for loading/staging offlat tile u*slopes inexcess of 5:12. 6.4.4 Two(2)Ply Underlayment Systems: Polystick MTS or MTS PLUS followed by Polystick MTS,MTS PLUS,0P,TU Plus,0Max,Tile Pro, MU-XmPolyflex SAP isallowable for use under mechanically attached prepared roof systems. Limits ofuse are those associated with the top-layer material. This is not a requirement,but is allowable if a 2-ply underlayment system is desired. � Polystick MTS PLUS followed by Polystick TU P,TU Plus,TU Max, Tile Pro or Polyflex SAP is allowable for use under foam-on tile systems. Limits ufuse are those associated with the top-layer material. This isnot arequirement,but|s allowable|fa2'p|yunder|aymentsystem|adesired. 8.5 Elastoflex S6 G or S6 G FR: 6.5.1 Elastoflex S6 G or S6 G FR shall be installed in compliance with current Polyglass published installation requirements, For use in tile applications,reference is made to FRSA/TRI April 2012(04-12)Installation Manual and Table I herein. 6.5.2 Elastoflex S6 G or S6 G FR shall be fully asphalt-applied to the substrates noted in Section 5.6. Side laps shall be minimum 3-inch and end-laps minimum 6-inch wide, off-set minimum 3 feet from course to course. Side and end laps shall be fully adhered in o complete mopping of hot asphalt with asphalt extending approximately 3/8-inch beyond the lap edge. §.6 6.6.1 Polyflex G or G FR shall be installed in compliance with current Polyglass published installation requirements. For use . in tile applications,reference is made FRSA/TR1 April 2012(04-12)Installation Manual and Table 1 herein. � 6.6.2 pohf|e«Go/G FR shall be fully torch-applied to the substrates noted in Section 5.6. Side laps shall be minimum 3- inch and end-laps minimum 6-Inch wide,off-set minimum 3 feet from course to course. Side and end laps shall be fully heat-welded and inspected to ensure minimum 3/8-inch flow of modified compound beyond the lap edge. 6.7 Tile Staalniv 6.7.1 Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. Refer to � Polyg|ass published requirements for tile staging. Exterior Research and Design,u.C' Evaluation Report Pzaoso,0a.09' 2z Certificate wfAuthorization u9503 pmCmOm'en*aEVwWwnmm pL5259-mZS Revision 21:uVzT/zo10 Page 12of1s � \] ��� �� U K���� U K |��~�' 6.7.2 Battens and/or Counter-battens,as required by the tile manufacturer and FRSA/TR1 April 2012(04-12)must be used on all roof slopes greater than 7:12. Precautions should be taken as needed, such as the use of battens or nail- boards,to prevent tile sliding and/or damage to the underlayment during the loading process. ui|'bnards,topveventd|edidingand/ordamageuatheundedaymentduhnQthehzadingproness. ' 6.7.3 For nail-on tile systems over Polystick MTS,battens are required for loading/staging of the tile. 6.7.4 For nail-on tile systems over PolystickMTS PLUS: > Battens are required for loading/staging uflugged tile regardless nfslope. ' > Battens are required for loading/staging offlat tile auslopes inexcess nf5:12. ' 6J.9 The minimum cure time after installation of self-adhering membranes and before loading of roofing tiles is forty-eight (48)hours. 7, BUILDING PERMIT REQUIREMENTS: . As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. 8. MANUFACTURING PLANTS: Contact the noted QA agency for information on product locations covered for F.A.C.Rule 611320-3 QA requirements. 0. QUALITY ASSURANCE ENTITY: UL,LLC—QUA9G25;(314)578'34D6;k.chanceUor@us.uicum -END OFEVaLUATIONmEPORT- ' ' ` Exterior Research and Design,u� Evaluation Report certiftcate of Authorization#9503 F8C NON-HVHZ EVALUATION eS2s9-R25 Revision z1:z0/17/2oz Page 1svrz3