HomeMy WebLinkAboutProduct Approval Floiida Building Code Online Page 1 of 2
I`-..1i;3�1>I r�+4i�ilr I � '{1 t Ir1l 4., rl it r } tt:�� �.7�� �...' �1 Ltt o ll: ���( • "...
j •li �lll( t .r,Ir,l.j�tl�Pl�-����°�ll,��,�AS 1° jI1,�.��,°�l) N ���..iL ��^-e��l.l��i�.
Itq(I t(�:h�II t71 t,Iti;1 ac 15 home Lag In User Registration not Toni[$ Suhmlt Surcharge Slats 61'acts Publications FEC Slatr BCIS Site Map Links Search
Busines 'l')
' Product Approval
Professional USER:Public User
Regulation s
lq gduSV3ppruy,l_14g np> `1SdSh>L+17111 ICa1192LIgi>Application Detail +,
t i. a ' FL!! FL1604tJ-R3
a Application Type Revision
Code Version 2014 IC
Application Status Approved
ILACommentsV I�/f
Archived V
Product Manufacturer TRI-BUILT Roofing Products
Address/Phone/Email 9050 Louisiana Street
Merrillville, IN 46410
(201)842-2449
david.ruiz@tribuiltmateria isgroup.com
Authorized Signature David Ruiz
david.ruiz@tribuiitmateria lsgroup.com
Technical Representative David Ruiz
Address/Phone/Email 250 Route 17 North
East Rutherford,NJ 07073
(201)B42-2449
(lavid.ruiz@tribuiltnlaterials9roup.com'
Quality Assurance Representative
Address/Phone/Email
Category Roofing
Subcategory Underlayments
I
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed
Florida Professional Engineer
Evaluation Report-llarl(Icopy Received
Florida Engineer or Architect Name who developed Robert Nieminen
the Evaluation Report
Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Contract Expiration Date 10/16/2017
Validated By John W.Knezevich,PE
I,/I Validation Checklist-Hardcopy Received
Certificate of Independence I:1-16048 123 COI 2O15 Q COI PlienhiiiGh. if
Referenced Standard and Year(or Standard) Standard Y-ear.
ASTM D1970 2009
ASTM G155 2005
Fl6A/1'RI April 2012(04-12) 2012
'rAS 103 1995
I
Equivalence of Product Standards
Certified By
Sections from the Code
' I
i
http://www,llaridabuildint;.or /pr/pr app dtl.asl)X?l),ll'an1=wGEVXQWID(ltPPiiiclYINDWl-.., 1/19/2016
i
li
Florida BILlild111g Code Online Page 2 oP2
l �
Product Approval Method Method I Option D
Date Submitted 10/08/2015
Date Validated 10/19/2015
Date Pending FBC Approval 10/21/2015
i
Date Approved 12/15/2015
I
Surninary of Products
FL At Model,Number or Name Description
16048.1 TRI-BUILT Roof Underlaynlents Self-adhering,nitidified bitumen roof underlayntents
Limits of Use Installation Instructions
Approved for use in HVHZ:No LL1604Q R3 ll___zQ15 10 F]NAL FR TRI_
Approved for use outside HVHZ:Yes BUlQ' UNDERI-MMENTS F1.46048-R311df
Impact Resistant:N/A Verified By: Robert Nieminen PE-59166
Design Pressure:+N/A/-45 Created by Independent Third Party:Yes
Other: 1.)The design pressure noted herein pertains to use Evaluation Reports 1 1
of foam-on the systems overtop the self-adhering FL16048 R3 AE1 2015 10 FINAL f_R TRI-
underlayment for one particular application.See ER Section BUILT UNDf_RLAYMENTS FIA6048-R3.13011f
5.6 for details.2.)Refer to ER Section 5 for other Limits of Created by Independent Third Party;Yes
Use.
Back Ncxl
Contact Us::1940 North Monroe Street,Tallahassee FL 32399 Phone:850-487-1824
The Slate of Florida Is an AA/EGO employer.Coovriam 2007.2013 Slate of Florida,::privacy Stale ent::Accessibility Statement::Refund Statement
I
Under Florida law,email addresses are public records.If you do riot want your e-mail address releaseld in response td a public-records request,do riot send
electronic mad to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.'Pursuant to
Section 455.2 75
Florida Statutes.effective October 1,2012,licensees licensed under Chapter 455,FtS.must provide lire Department with an email address if
they have one.The emails provided may be used for official communication with the licensee.However email addressee are public record.If you do not wish to
supply a personal address,please provide the Department with an email address which can be made available to the public.To determine it you are a licensee under
Chapter 455,F.S.,please click here
Product Approval Accepts:
199'�SI l�'71 �Cnrcl
,c(u r it f'.(t iI lift
I
I
I
I I
I
I
i
littp://www.iloi-iciabLlil(iillg.01'g/p►•/pr_app_citl.,isl)x?param=wGE-VXQNwtD(ItI,Pui1dYiNDWr... 1/19/2016
^
'
RoofingCer-Ifficote of Authorizor tion 119503
ERD 353 CHRISTIAN STREET, UNIT H13
1"T�RINITY OXFORD,CT 06478
PHONE:(203) 262-9245
FAX:(203) 262-9243
EVALUATION REPORT
Allied Building Products Corp. Evaluati6,h Report A42960.10.12-R3
dba TRI-BUILT
Products
90WI-ouisiana Street Dat e' of Issuance:10/25/201.2
Merrillville,IN 46410 1 Revision 3: 10/08/2015
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules an I d regula,iions governing the use of
construction materialsin the State o, Florida.The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code and Florida Building Code,ilAesidential Volume. The
products described herein have been evaluated for compliance with the Silt Edition (20,14) Florida Building Code
sections noted herein.
DESCRIPTION: TRI-BUILT Roof Underlayments
LABELING: Labeling shall be in accordance with the requirements the Accredited Qualit,y Assurance Agency noted
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named� productli(:s)changes,the referenced
Quaiity Assurance documentation changes,or provisions of the Code that relate t 10 the pro�uct change. Acceptance of
this Evaluation Report by the narned client constitutes agreement to notify Robert Nierninen, P.E. if the product
changes or the referenced Quality Assurance documentation changes. TrInityl ERD requir6s-a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle
ADVERTISEMENT: The Evaluation Report number preceded by the words "rrinitylERD Evaluated" may be displayed in
advertising literature, If any portion of the Evaluation Report is displayed,then it shall be done in its entirety.
INSPECTION:Upon request,a copy of this entire Evaluation Report shall be provided to the ii'ser by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Buil,ding Official.
This Evaluation Report consists of pages I through 5.
Prepared by: J,
SX Z
Robert J.M.Niernin*en,P.E. I he faalnmile seat e,,Ing�aB..Otorbetl by Robett Ah-tine it,
nPP
P.E.on 10/081201 S!,Ifift]..s not wive is 11%Aprt rinkAlly tIgne(I
Florida Registration No.59166, Florida DCA ANE19B3 b—been I.......nte,f to OIL
CERTIFICAtION OF INDEPENDENCE:
1. Trinity I ERD does not have, nor does it intend to acquire or will it acquire, a financial interest in,any company manufacturing or
distributing products it evaluates.
2. TrinitylERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nierninen,P.E.does not have nor will acquire,a financial interest in any compan�manufaci�uring or distributing products for
which the evaluation reports are being issued.
4. Robert Nierninen,P.E.does not have,nor will acquire,a financial interest in any,other ie�tlty Involyed in the approval process of the
S. This is a building rode evaluation. Neither TrinitylERD nor Robert Nleminen, P.E.are,lin any w�y,the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,is/was used for pe rmitting I:design guidance unless retained
specifically for that Purpose.
]
|
| l!
� .�
I TRINITY ERD
5.6.4 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: ;FRSA/TRI April 2012 (04-12)
does not address wind uplift resistance of all underlayment systems beneath-foam-on the systems, where
the underlayment forms part of the load-path, The following wind uplift limitations apply to direct-deck
underlayment systems that are not addressed in FRSA/TRI April 2012 (04-12) and are used in foam-on tile
applications. Maximum Design Pressure is the result of testing for wind load resistance based on
allowable wind loads, and reflects the ultimate passing pressure divided by?-;(the 2 to 1 margin of safety
per FBC 1504.9 has already been applied), Refer to FBC 1609 for detiermination of design wind pressures.
5.6.4.1 Maximum Design Pressure=-45.0 psf.
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of AHJ.
Primer: (Optional)ASTM D41
Underlayment: Tri-Built S/A HTTU Underlayment,self-adhered.
5.7 Exposure Limitations:
5.7.1 Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left
exposed for longer than 30-days after installation
5.7.2 Tri-Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation.
6. INSTALLATION:
6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI=BUILT published installation
requirements subject to the Limitations set forth in Section 5 herein)and the specifics noted below.
6.2 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly
to remove any dust and debris prior to application,and prime the substrate(if applicable).
6.3 Tri-Built Sand-11 SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment;
i
6.3.1 Shall be installed in compliance with the requirements for ASTM' D1970 underlayment in FBC Sections
1507 for the type of prepared roof covering to be installed.
6.3.2 Non-Tile applications:
While priming is optional,TRI-BUILT recommends priming the deck if the final roof cover is not slated for
installation within 24 hours.
i
Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3
ft of release film.
Adhere the exposed part to the substrate and unroll the remaining I embrane as far as possible.
Once the entire length of membrane is in place, peel-off the release film;diagonally while holding the
membrane tight. Firmly roll the membrane into place to achieve a bond.
Horizontal seams should be minimum 3-inches, configured to shed water.; Vertical seams should be 6-
inches and staggered not less than 2-ft from vertical seams in the course below. All over-granule end-laps
shall be sealed using either heat-welding or hot air welding techniques.
When installing at slopes above 8:12, Allied Building Products Corp recommends back-nailing in the
overlap area at the top of the sheet at 12-inch o.c.
For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths.Peel the release paper and center sheet
over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in
each direction. For valleys,apply the sheet starting at the lowest point and work upward.
6.3.3 Tile Applications(Tri-Built S/A HT TU Underlayment only):
Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the
instructions noted above as a guideline.
Tile shall be loaded and staged in a manner that prevents;tile slippage and/or damage to the
underlayment.
i
Exterior Research and Design,LLC. Evaluation Report A42960.10.12•113
Cert4frote oJAuthorkntlon#9503 FL16048-113
I i
Revision 3:10/08/2015
Page 4 of 5
i I
TRINITY ERD
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properliy evaluate the installation of
this product. I.
8. MANUFACTURING PLANTS: 1,
Contact the noted QA agency for information on product locations covered fo RA.C.Rule 9N-3 QA requirements.
i'
9. QUALITY ASSURANCE ENTITY:
UL, LLC—QUA9625;(314)578-3406; k.chancellor@us.ul.com
j,
END OF EVALUATION REPORT-
I
i
I'
I�
i
Ij
I„
I
i,
I
I
I'
i
i
I
I,
i,
I
Exterior Research and Design,LLC, (Evaluation Report A42960.10.12-113
Certificate of Authorfrntlon#9503 F1.16048-113
Revision 3:10/08/2015
Page 5 of 5
I '
I,
I.
i I•
i
i
TRIN ERD
ROOFING COMPONENT EVALUATION:
1. SCOPE:
Product Category: Roofing j
Sub-Category: Underlayment
Compliance Statement: TRI-BUILT Roof Underlayments, as produced by TRI(BUILT, have demonstrated com pliance
with the following sections of the Florida Building Code through testing in accordance with the following Standards.
Compliance is subject to the Installation Requirements and Limitations/Conditions of Use set forth herein.
2. STANDARDS:
Section Property Standard i' Year
1507.2,4,1507.2.8,1507.2.9,2, Physical Properties ASTM D1970 2009
r
1507.4.5.1,1507.5.3,1507.7.3
1504.6 Accelerated Weathering ASTM G1551 2005
1507.3.3 Installation Practice FRSA/TRI April 2012(04=12) 2012
1523.6.5,2.1 Physical Properties TAS 103 1995
3. REFERENCES:
Entity Examination Reference Date
ERD(7576049) Physical Properties 540540.02.73-1 02/19/2013
ERD(TST6049) Physical Properties 540540.11.1,3 11/19/2013
ERD(TST6049) Physical Properties S40540.03.1�4 r 03/26/2014
ERD(TST6049) Physical Properties S44870.04.14-2 04/02/2014
ERD(TST6049) Physical Properties 544870.04.14-3 04/02/2014
ERD(TST6049) Physical Properties 544870.04.14-1 04/10/2014
ERD(TST6049) Physical Properties 544870.04.14-4 04/10/2014
ERD(TST6049) Physical Properties 543530.02.14-1-111 05/14/2014
ERD(TST6049) Physical Properties 543530.05.14 05/28/2014
ERD(7576049) Physical Properties 540540.10.14 10/31/2014
ERD(TST6049) Physical Properties SC7645.02.15 02/13/2015
ERD(TST6049) Accelerated Weathering SC8520.04.15 05/27/2015
UL,LLC.(QUA9625) Quality Control Multiple-Listing R16814 09/04/2015
UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.10/16/2017
4. PRODUCT DESCRIPTION:
4.1 -.Self-Adhering-Underlaym_ents:
04_1.1 Tri-Built Sand-R SA Shingle Underlayment Is a self-adhering, glass-mat reinforced, sand-surfaced, SBS
odified
mbitumen roof u--derfayment,with a 36-inch sheet width.
4.1.2 Tri-Built S/A HT TU Underlayment is a self-adhering, non-woven polyester,fabric surfaced, SBS modified
bitumen roof underlayment
4.1.3 Tri-Built Smooth HT S/A Underlayment is a self-adhering,glass-mat reinforced,film-surfaced,SBS modified
bitumen roof underlayment.
5. LIMITATIONS:
5.1 This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the
Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was
used for permitting or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in the HVH7-.
5.3 Fire Classification is not part of this Evaluation Report; refer to current',Approved Roofing Materials
Directory for fire ratings of this product.
Exterior Research and Design,LLC, j Evaluation Report A42960.10.12-R3
Certificate ofAuthorization#9503 FL16048-113
Revision 3:10/08/2015
Page 2 of 5
I
I
i
[TRIN11Y ERD
5.4 TRI-BUILT Roof Underlayments may be used with any prepared roof,cover where the product is specifically
referenced within FBC approval documents. If not listed, a request may be made to the AHJ for approval
based on this evaluation combined with supporting data for the prepared roof covering.
5.5 Allowable roof covers applied atop the underlayments are as follows:
TABLE 1: ROOF COVER OPTIONS':...
AsphaltWood.Shakes
Underlayment Shingles Nail-Ort Tile Foam-On Tile Metal &Shingles Slate
Tri-Built Sand-R SA Shingle Yes No No j No Yes Yes
Underlayment
Tri-Built S/A HT TU yes
Yes Yes Yes Yes Yes
Underlayment See S.5.1
Tri-Built Smooth HT S/A
Underlayment Yes No No Yes Yes Yes
5.5.1 "Foam-On Tile" is limited to use of the following Approved tile adhesives Ohless tensile adhesion / long
term aging data from an accredited testing laboratory is provided.
Y Tri-Built S/A HT TU Underlayment with 3M'"2-Component Roof Tile Adhesive AFI-160(FL6332) or Dow
TileBond'"Roof Tile Adhesive(FL717)
5.6 Allowable substrates are noted below:
I
5.6.1 Direct-Bond to Deck:
Tri-Built Sand-R SA Shingle Underlayment, Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment applied to:
r Plywood; ASTM D41 primed plywood; OSB; ASTM D41 primed OSB;;ASTM D41 primed structural
concrete.
While not required over plywood,OSB or Southern Yellow Pine substrates,TRI-BUILT recommends priming
the deck if the final roof cover is not slated for installation within 24 hours, Note: TRI-BUILT requires
tongue-and-groove board decking be covered with plywood ori OSB prior to installation of the self-
adhering underlayment.
5.6.2 Bond-to-Insulation:
i
Tri-Built S/A FIT TU Underlayment applied to:
Y Dens Deck Prime;SECUROCK Gypsum-Fiber Roof Board.
For installation under mechanically attached prepared roof coverings, insulation shall be attached per
minimum requirements of the prepared roof covering manufactu'er's Product Approval. For installations
under foam-on tile systems,insulation attachment shall be designed by a qualified design professional and
installed based on testing of the insulation/Underlayment system in accordance with FM 4474,Appendix D
or TAS 114,Appendix J.
5.6.3 Bond to Mechanically Attached Base Laver;
Y ASTM D226,Type I or II felt.
For installations under mechanically attached prepared roof coverings, base layer shall be attached per
minimum codified requirements. For installations under foam-on tile systems,base layer shall be attached
per minimum requirements of FRSA/TRI April 2012(04-12).
I,
I
Exterior Research and Design,L.I.C. Evaluation Report A42960.10.12-113
Certificate of Authorization#9503 F1.16048-113
Revision 3:10/08/201S
Page 3 of 5
I
I