Loading...
HomeMy WebLinkAbout2021-5-11 Narrative (2) Engineering Design & Construction, Inc. 10250 SW Village Parkway, Suite 201, Port Saint Lucie, FL 34987 772-462-2455 www.EDC-Inc.com PROJECT NARRATIVE & COVER LETTER Southern Truss Development Application May 11, 2021 REQUEST On behalf of the Petitioner, Engineering Design & Construction, Inc. is requesting approval of a major adjustment to a major site plan for expansion of an existing development totaling 40.86 acres located in St. Lucie County, Florida. The subject parcels are noted below are located at 2590 Kings Highway in St. Lucie County, Florida. SITE CHARACTERISTICS & PROJECT HISTORY The subject parcels can be identified in the below table: Parcel ID: Address: Acreage: FLU: Zoning: 1336-231-0001-000-2 2590 Kings Highway 11.62 TVC IL 1336-240-0000-000-3 TBD Portion of 34.50 TVC AG-1 / IL TOTAL: 46.12 Parcel # 1336-231-0001-000-2 is currently developed and includes a 5,000-sf office building, a 1,280 covered storage area and a 63,780-sf manufacturing building. The petitioner is proposing the addition of a 33,600-sf manufacturing building with open storage and associated site improvements. The 11.62-acre parcel has a Future Land Use designation of Towns, Villages and Countrysides (TVC) and an underlying Zoning designation of Light Industrial (IL). The 29.24-acre parcel has a Future Land Use designation of Towns, Villages and Countrysides (TVC) and a split zoning designation. The western portion of the site has a Zoning designation of Agricultural (AG-1) and the eastern portion has a Zoning designation of Light Industrial (IL). An application to rezone the eastern portion of the site to Light Industrial was submitted to the County on April 22, 2021. To the north of the subject parcel are undeveloped parcels. North of the 11.65-acre parcel is a vacant 33.98-acre parcel which has a Future Land Use designation of Towns, Villages and Countrysides (TVC) and an underlying Zoning designation of Agricultural (AG)-1. North of the 34.50-acre parcel is an undeveloped 18.17-acre parcel that has a Future Land Use designation of Towns, Villages and Countrysides (TVC) and an underlying Zoning Designation of Agricultural (AG-1). Further east lies an undeveloped 18.17-acre parcel that has a Future Land Use designation of Towns, Villages and Countrysides (TVC) and an underlying Zoning designation of Light Industrial (IL). To the west of the 11.65-acre parcel lies the Right-of-Way of N. Kings Highway followed by an undeveloped parcel which has a Future Land Use designation of Towns, Villages and Countrysides (TVC) and an underlying Zoning designation of Agricultural (AG-1). Southern Truss Development App Page 2 of 2 May 11, 2021 West of the 34.50-acre parcel is an undeveloped parcel with a Future Land Use designation of Towns, Villages and Countrysides (TVC) and an underlying Zoning designation of Agricultural (AG-1). Southwest of the 11.65-acre parcel lies a developed parcel which includes an 8,160-sf building with associated site improvements. This parcel has a Future Land Use designation of Towns, Villages and Countrysides (TVC) and an underlying Zoning designation of Light Industrial (IL). Southeast of this parcel is an undeveloped agricultural parcel which has a Future Land Use designation of Towns, Villages and Countrysides (TVC) and an underlying Zoning designation of Agricultural (AG-1_. South of 34.50-acre parcel lies canal Right-of-Way owned and maintained by Fort Pierce Farms Water Control District (FPFWCD). South of the canal lies an undeveloped agricultural parcel. This parcel has a Future Land Use designation of Towns, Villages and Countrysides (TVC) and an underlying Zoning designation of Agricultural (AG-1). To the east of the subject properties lies the Right-of-Way of Taylor Dairy Road followed by an undeveloped parcel. This parcel has a Future Land Use designation of Towns, Villages and Countrysides (TVC) and an underlying Zoning designation of Light Industrial (IL). The subject parcel is currently being served for well and septic. Currently water and sewer service are not available to serve the subject property but expansions to utilities are included as part of the Kings Highway Improvement project. Based on the above and attached information, the applicant respectfully requests approval of this application. Z:\EDC-2020\20-381 - Southern Truss Expansions\ENGINEERING\Documents\Submittal Documents\Justification Statement\2021-05-11_Southern_Truss_Site_Plan_Expansion_Justification_20-381.docx