Loading...
HomeMy WebLinkAbout2021-5-11 Response Letter (1) Engineering Design & Construction, Inc. 10250 SW Village Parkway, Suite 201, Port Saint Lucie, FL 34987 772-462-2455 www.EDC-Inc.com May 11, 2021 Via: Electronic Mail Tahir Curry St. Lucie County Planning & Development 2300 Virginia Avenue Fort Pierce, FL 34982 Re: Southern Truss Pre-Application Meeting Response to Comments Pre-App-1220202590 Dear Tahir: On behalf of our client, please find the attached response to comments received on February 5, 2021 for a project known as Southern Truss. Each comment is identified below followed by a response in bold italics. B. Determination of Compliance with Land Development Code and Comprehensive Plan Requirement – Planning & Development Services Approval History: • Existing Facility (Parcel ID: 1336-231-0001-000-2 / 2590 N. Kings Highway): o On January 13, 2004, the Board of County Commissioners approved Resolution No. 04-004, granting a Major Site Plan for a 63,780-sf manufacturing building and a 5,000-sf office building known as Atlantic Truss. • Approved and Unbuilt Facility (St. Lucie Blvd. & Taylor Dairy): o On July 28, 2020, the Planning & Development Services Director approved PDS Order 2020-042, granting lot split approval for the vacant 34.51 acre property (Parcel ID: 1336-240-0000-000-3) to the east of Southern Truss’ current facility. The split intended to add 5.268-acres to their initial expansion site to the north on St. Lucie Boulevard (Parcel ID: 1336-211- 0000-000-3) as detailed in the BOCC approvals below. o On August 4, 2020, the Board of County Commissioners approved Resolution No. 2020-156, granting an Amendment to the Official Zoning Atlas from AG-1 (Agricultural – 1) to IL (Industrial, Light) for the 5.268-acre portion of Parcel 1336-240-0000-000-3. This land is part of Southern Truss’ Major Site Plan approved for 6509 St. Lucie Blvd via Resolution No. 2020- 213. Staff Findings: 1. The proposed conceptual site plan conflicts with PDS Order 2020-042 (Lot Split) and Resolution No. 2020-213 Southern Truss – Pre-App Rsp2Cmts Page 2 of 9 May 11, 2021 - Major Site Plan approval for Southern Truss at 6509 St. Lucie Blvd. The approved site plan identified the 5.268-acre portion of Parcel 1336-240-0000- 000-3 as a wet retention area (shown below) to support their proposed manufacturing plant. The approved Site Plan (Resolution No. 2020-213) shall be modified or vacated prior to advancing a new Major Site Plan Adjustment to expand the existing facility (N. Kings Highway) into land covered under the active site plan (identified in yellow above). RESPONSE: Acknowledged. 2. The Lot Split approved by PDS Order 2020-042 has unresolved conditions of approval outlined below: • Within 30 days of Lot Split approval, the applicant and/or property owners shall record two (2) warranty deeds in the St. Lucie County Public Records, reflecting the legal descriptions in accordance with the survey submitted by Culpepper & Terpening, Inc., referenced hereinabove. • Within 30 days of Lot Split approval, the applicant and/or property owner(s) shall record a Unity of Title, or similar legal instrument, combining the property described as ‘less & except parcel’ with Parcel ID 1336-211- 0000- 000-3. ➢ This Lot Split shall be vacated, if the Southern Truss Major Site Plan (Resolution No. 2020-213) is abandoned but, prior to including Parcel 1336-240-0000-000-3 within a new Site Plan. RESPONSE: Acknowledged. 3. Please note: There is an active Code Violation on the St. Lucie Blvd property for the outdoor storage of materials. If the new proposal seeks to integrate this parcel, the violation shall be addressed prior to DRC certification. RESPONSE: Acknowledged. Application(s) Requirements: 1. The 33,600-sf manufacturing building addition, open storage area and associated site improvements require a Major Adjustment to a Major Site Plan adhering to LDC Sections 11.02.04.D and 11.02.09. The Adjustment requires approval by the Board of County Commissioners in accordance with the LDC Section 11.02.04.D. RESPONSE: Acknowledged. 2. The displayed expansion onto Parcel ID: 1336-240-0000-000-3 shall require a Rezone to the IL (Industrial Light) Zoning District, in accordance with the standards of review in the LDC Section 11.06.04. The property currently has a split AG-1 / IL zoning designation. RESPONSE: A application to rezone Parcel ID 1336-240-0000-000-3 was submitted under separate cover on April 22, 2021. Southern Truss – Pre-App Rsp2Cmts Page 3 of 9 May 11, 2021 3. The applicant and/or property owner(s) shall record a Unity of Title, or similar legal instrument to combine the 11.65-acre parcel (Parcel ID: 1336-231-0001- 000-2) with the 34.51-acre parcel (Parcel ID: 1336-240-0000-000-3) or portion thereof concurrent with a modification to PDS Order 2020-042 (Lot Split in conflict with the presented plan). The applications, checklist, and fee schedule may be found on the St. Lucie County Planning and Development Services website at http://www.stlucieco.gov/planning/applications. Combination of request form can be found on the St. Lucie County Property Appraiser website at https://www.paslc.org/index.php/real-estate/real-estate- forms/ RESPONSE: Acknowledged. Review of Conceptual Site Plan & Submittal Requirements: 1. The conceptual plan does not identify a loading zone for the proposed building. Please identify a loading zone in accordance with the LDC Section 7.06.02. RESPONSE: Please see site plan which includes a loading zone. 2. The existing/proposed lumber storage areas are not proposed as an all- weather surface meeting the requirements of St. Lucie County’s Public Works Department. Please identify the vehicular use areas, which shall be constructed with an all-weather surface material such as concrete or asphalt. RESPONSE: Please see attached site plan. 3. Please reference the 5th edition of the Institute of Traffic Engineers (ITE) Parking Generation for minimum requirements. The current parking calculation currently does not reference the ITE. RESPONSE: The site plan has been revised to reference the 5th Edition of the Institute of Traffic Engineers Parking Generation. 4. Please ensure the proposed parking area and vehicular use area labeling is accurate. There are errors with the dimensions and parking space counts. RESPONSE: Please see attached site plan. 5. A transportation impact study will be required as well as a circulation plan in accordance with the LDC Section 11.02.09.3.I. RESPONSE: Please see attached traffic impact study. General Notes: • The existing 40 X 45 (1.800 sq. ft.) storage building was not included in any prior site plan adjustments, per County Records. Please include in this adjustment, further complying with the Permitting/Building Department for securing a building permit for the covered storage area. RESPONSE: Acknowledged. Southern Truss – Pre-App Rsp2Cmts Page 4 of 9 May 11, 2021 • If applicable, please identify if any shared access with Southern Truss property to the north will provide for access or storage. RESPONSE: Not applicable. • Staff encourages the developers to coordinate with Fort Pierce Utilities Authority for accessing water and sewer services to the site. RESPONSE: Acknowledged. E. Determination of Compliance with Environmental Requirements – Environmental Resources Department The Environmental Resources Department (ERD) is responsible for protecting and preserving the County’s natural resources through compliance with the County’s Comprehensive Plan (CP) and Land Development Code (LDC). The following information is preliminary based upon the information provided for your pre-application meeting and is intended to assist you in submitting a complete site plan application. Additional comments may be provided at time of site plan submittal based upon additional information received. We encourage you to communicate the project constraints, timelines, etc. to ERD so we may better understand your needs and work together to meet the intent of the Land Development Code and Comprehensive Plan and ensure a sustainable environment for all citizens of St. Lucie County. The following items will be required at time of site plan submittal: 1. A non-binding wetland jurisdictional determination and/or permits from the South Florida Water Management District, contact: (863)-462-5260; RESPONSE: Please see attached Environmental Assessment. 2. If a wetland is determined onsite, a Category (I, II, III), Wetland Waiver Application (attached) may be required for any impacts to onsite wetlands and required associated buffer per CP 6.1.14.3; a. Incorporate components into the site plan to protect and/or maintain wetlands, such as reduced paving, cluster site planning, etc. per CP 6.1.4.6. b. The County shall require a minimum 50-ft. buffer between Category I or II wetlands or a 25-ft. buffer between Category III wetlands and new development activity in order to protect water quality, preserve natural functions, and preserve wildlife habitat. The buffer, as measured landward from the approved jurisdictional line, shall be maintained in a natural vegetative state and be free of invasive and nuisance species as defined by the Florida Exotic Pest Plant Council per CP 6.1.14.5; c. The County shall assess the specific and cumulative impacts of all proposed new development or redevelopment activities, including single-family building permits, on all wetlands that may be located on the property in order to ensure that the natural functions of the wetlands are protected and conserved through the implementation of wetland protection standards which shall include consideration of the types, Southern Truss – Pre-App Rsp2Cmts Page 5 of 9 May 11, 2021 values, functions, sizes, conditions, and locations of wetlands per CP 6.1.14.7; d. FYI: Category I and II Wetlands Waivers require Board of County Commission (BOCC) approval, while Category III Wetlands Waivers are approved administratively through the ERD Director; RESPONSE: Please see attached environmental assessment. 3. An Environmental Impact Report (EIR) consistent with LDC 11.02.09.A.5 and Chapter 6 of the CP Policy 6.1.12.4 shall include but not limited to the following: a. An assessment of the impacts upon onsite habitat (i.e., upland, wetland, etc.), vegetation, and wildlife, etc. b. A plant and animal survey for any onsite Federal and State protected species, specifically the Federally-listed Crested Caracara and possibly the State-protected gopher tortoise. The Crested Caracara survey must be no older than the previous caracara nesting season (January – April), contact: 772-462-3909; c. If applicable, identify all onsite wetlands by category (i.e., Category I, II, III) following the general classification system for the purposes of protecting wetland functions and values within the County per CP Policy 6.1.14.1; i. Provide discussion of how avoidance and minimization is being met, i.e., no reasonable alternative exists, and avoidance and minimization of impacts cannot be achieved; ii. UMAM scores may be required for any impacts to wetlands; RESPONSE: Please see attached environmental assessment as requested. 4. If applicable, a Preserve Area Management and Monitoring Plan (PAMMP) for all onsite preservation/conservation areas (i.e., wetlands and required associated buffers, preservation/restoration upland area, etc.) per CP 6.1.8.10. A condition of approval will require recording of the PAMMP and a protective Conservation Easement in the Official Public Records for all preservation areas; RESPONSE: Please see attached environmental assessment. 5. A boundary survey, which shall depict the approved State and Federal jurisdictional wetland line(s) and required associated upland buffer per LDC 11.02.09.A.2.d; RESPONSE: Please see attached environmental assessment. A site visit with SFWMD was conducted on April 23, 2021 and confirmed that there are no wetlands within the project boundary. 6. A site plan consistent with LDC 11.02.09.A RESPONSE: Please see attached site plan. 7. A landscape plan consistent with LDC 7.09.00, including but not limited to: a. A 15 ft. wide landscape buffer along all road rights-of-way consisting one Southern Truss – Pre-App Rsp2Cmts Page 6 of 9 May 11, 2021 (1) native shade tree every 30 linear feet and a 24” continuous native hedge per LDC 7.09.04.A; RESPONSE: Please see attached site and landscape plans. b. A 10 ft. wide landscape buffer consisting of one (1) native shade tree every 30 linear feet and a 48” continuous native hedge shall be required when an off-street parking area or other vehicular use area will not be entirely screened by an intervening building or structure from abutting properties per LDC 7.09.04.B; RESPONSE: Please see attached landscape plans. c. Surface parking and other vehicular use areas shall have at least one (1) square foot of interior landscaping for every eighteen (18) SF of off- street parking and vehicular use area and appropriate landscaping per LDC 7.09.04.C; RESPONSE: Please attached landscape plans. 8. A tree survey (if applicable) consistent with LDC 11.02.09.A.2.i; RESPONSE: Please see attached tree survey. 9. A tree mitigation plan (if applicable) consistent with LDC 6.00.05.D. RESPONSE: Please see attached site plan which includes a tree table. F. Determination of Compliance with Engineering & Water Quality Requirements – Water Quality Division, Public Works Department The following comments are offered based on plans dated December 10, 2020. 1. King’s Highway is an FDOT Right-of-Way. Please coordinate with FDOT for permitting improvements within the Right-of-Way or any required Right-of-Way dedications. The contact for FDOT Right-of-Way dedication is Nesa Harden at 954-777-4437, nesa.harden@dot.state.fl.us. RESPONSE: Acknowledged. 2. Provide a tabular breakdown of existing and proposed impervious areas by type. RESPONSE: Please see attached site plan. 3. Provide the flood zone and FIRM panel for this location on the Site Plan. RESPONSE: Please see attached site plan. 4. Dimension the driveway width, radius of return, and setback from side property lines and adjacent driveways. Section 7.05.06 of the Land Development Code includes minimum setback requirements for driveways. RESPONSE: Please see attached site plan. 5. Provide additional survey for the ditch that connects the detention pond to the Southern Truss – Pre-App Rsp2Cmts Page 7 of 9 May 11, 2021 canal. Is an easement existing over this ditch? RESPONSE: Please see attached survey. 6. Provide a truck circulation plan depicting how the dumpster collection, fire department, and delivery trucks will safely maneuver onsite. RESPONSE: Please see attached truck circulation plan as requested. 7. Dimension the drive aisles and radius of returns on all curbed islands. RESPONSE: Please see attached site plan. 8. Provide typical pavement sections for all vehicular use areas. Vehicular use or storage areas are required to be paved with asphalt or concrete. RESPONSE: Please see attached site plan. 9. Provide property line cross sections showing that adjacent properties will not be adversely impacted. RESPONSE: Please see attached site plan. 10. Provide a detail for the ADA accessible parking stall complying with current FDOT standards. RESPONSE: Please see attached site plan. 11. Provide details for curbing and sidewalk complying with current FDOT standards. RESPONSE: Please see attached site plan. 12. Trees placed within 10 FT of drainage structures or pipe shall include a root barrier product to protect the drainage system. RESPONSE: Acknowledged. 13. Landscaping shall not be placed in the bottom of swales or retention areas where they will block stormwater conveyance. RESPONSE: Acknowledged. 14. A Site Development Permit is required prior to performing site improvement activities. Subsequent to DRC approval, the applicant may submit the required documents to Grant Chambers, P.E. in the Engineering Division. Documents include, a Site Development Permit application, two sets of plans, one copy of the stormwater report and other appropriate information. The Site Development Permit application can be found on the County’s website under the Water Quality Division. In accordance with the permit and Land Development Regulations, the applicant shall retain the EOR for site inspections and final certification. RESPONSE: Acknowledged. 15. For discussion regarding these comments, please contact myself at 772-462- Southern Truss – Pre-App Rsp2Cmts Page 8 of 9 May 11, 2021 2741 or chambersg@stlucieco.org. RESPONSE: Acknowledged. G. Determination of Compliance with Property Acquisitions Requirements – Property Acquisition Division, Legal Department In reviewing Southern Truss Pre-App, we have the following comment: The parcel has the following frontage: • Kings Highway a State owned and maintained right-of-way. RESPONSE: Acknowledged. • Parcel 1336-240-000-000-3 was approved for a Lot Split in PDS Order 2020- 042. A condition of that approval was that within 30 days of the approval the owners shall record (2) warranty deeds in the St. Lucie County Public Records and the owners shall record a Unity of Title combining the parcel with parcel 1336-211-0000-000-3. There is no record for these transactions in the Public Records. RESPONSE: Acknowledged. H. Determination of Compliance with Utilities Requirements – Fort Pierce Utilities Authority Below are FPUA comments regarding the submission for Southern Truss – 2590 N Kings Hwy. W/WW Engineering: At present, FPUA Water and Sewer services are not available to serve this development. Water and Sewer utilities for this area are tied to the Kings Highway Improvement project. RESPONSE: Acknowledged. Electric & Gas Engineering: Approved. Electric - The property is not in the FPUA electric service area. Located in FPL service area. RESPONSE: Acknowledged. Gas – Service is available to the site (From St. Lucie Blvd and Hammond Road). Please provide a copy of the gas riser diagram with the anticipated load (if developer is interested in natural gas service to the propose site). For more information and incentive available, please contact Billy Dupre. Attached below is a copy of the FPUA GIS map. Billy Dupre Business Development Representative Gas Operations 1701 S. 37th Street, Fort Pierce, FL 34947 Bdupre@fpua.com Office: (772)-466-1600 Ext.4705 RESPONSE: Acknowledged. Southern Truss – Pre-App Rsp2Cmts Page 9 of 9 May 11, 2021 K. Determination of Compliance with Florida Department of Transportation – FDOT The applicant is strongly encouraged to coordinate with the Department to review the proposed development’s site plan and access to the State Road. Please contact Dalila Fernandez by email at D4AccessManagement@dot.state.fl.us or can complete an online request for an access pre-application meeting by filling out the District 4 Access Management Pre-Application Request Form. Once scheduled, the County is encouraged to attend the pre-application meeting. RESPONSE: Acknowledged. We feel the attached adequately addresses staff comments and respectfully request approval of application. If you have any questions regarding this application, the attached documents, or the project, please contact our office. Respectfully, ENGINEERING DESIGN & CONSTRUCTION, INC. Patricia Sesta Planner cc: John Byers – Southern Truss Z:\EDC-2020\20-381 - Southern Truss Expansions\ENGINEERING\Documents\Submittal Documents\Comment Response Letter\2021-05-11_T_Currie_Southern_Truss_Pre-App_Rsp2Cmts_Ltr_20-381.docx